X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0374080206000"

m
m
 
Line 275: Line 275:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 01:43, 18 January 2021

Well Details

Well ID: 0374080206000
Loading map...
Location: 00/06-02-037-08W4/0
Location Alias: 00/06-02-37-08 W4M
Location Alias 2: 00/06-02-037-08 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 08
Section: 02
County/Municipality: Special Areas No. 4
Well Name: VERITY PROVOST 6-2-37-8
Operator Name: Topanga Resources Ltd.
License Number: 0441568
License Date: 2011-12-16
License Status: Issued
Spud Date: 2012-02-01
Final Drill Date: 2012-02-04
Well Total Depth: 1702.00 m
Surface Hole Latitude: 52.148014
Surface Hole Longitude: -111.055784

For data sources see[1][2]

Well History

Date Event
2011-12-16 Obtained License
2012-02-02 Direction Drilling Operation Performed - Horizontal
2012-02-04 Finished Drilling
2012-02-04 Well Mode changed to Drilled and Cased
2012-02-05 Production Casing Operation Performed
2012-02-05 Rig Released
2012-02-13 Well Log Performed
2012-03-07 Perforation Treatment Performed - Jet Perforation
2012-03-12 Well Began Production
2012-03-12 Well Fluid changed to Crude Oil
2012-03-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-01 Precision Drilling Corporation 386 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-02 514.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-07 Perforation 1165.00 1667.00 17

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7022 0.0 0.0 0.0
2013 8725 0.0 0.0 0.0
2014 7776 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8016 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

References