If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 241: | Line 241: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0374172013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.197789,"lon":-112.405078,"icon":""}]} |
Location: 00/13-20-037-17W4/0 | |
Location Alias: 00/13-20-37-17 W4M | |
Location Alias 2: 00/13-20-037-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 17 | |
Section: 20 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: GENTRY WINSLOW HALKIRK 13-20-37-17 | |
Operator Name: Crew Energy Inc. | |
License Number: 0264578 | |
License Date: 2001-12-18 | |
License Status: RecCertified | |
Spud Date: 2001-12-20 | |
Final Drill Date: 2001-12-21 | |
Well Total Depth: 301.00 m | |
Surface Hole Latitude: 52.197789 | |
Surface Hole Longitude: -112.405078 |
Date | Event |
---|---|
2001-12-18 | Obtained License |
2001-12-20 | Surface Casing Operation Performed |
2001-12-21 | Finished Drilling |
2001-12-21 | Well Log Performed |
2001-12-22 | Production Casing Operation Performed |
2001-12-22 | Rig Released |
2001-12-22 | Well Mode changed to Drilled and Cased |
2002-01-06 | Perforation Treatment Performed - Jet Perforation |
2002-01-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-01-11 | Perforation Treatment Performed - Jet Perforation |
2005-05-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-05-14 | Plug Back Performed |
2005-05-14 | Well Log Performed |
2005-05-14 | Well Mode changed to Abandoned Zone |
2005-05-16 | Well Abandoned |
2005-05-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-01-06 | Perforation | 228.00 | 230.00 | 13 |
2002-01-11 | Packing Device Capped w/Cement | 217.00 | 225.00 | 0 |
2002-01-11 | Perforation | 189.00 | 192.00 | 13 |
2002-01-11 | Perforation | 186.50 | 188.00 | 13 |
2002-01-11 | Perforation | 157.00 | 160.00 | 13 |
2005-05-14 | Packing Device Capped w/Cement | 142.00 | 150.00 | 0 |
For data sources see[4]