X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0185020516000"

m
m
 
Line 206: Line 206:
 
| style="text-align: right;" | 2514.00
 
| style="text-align: right;" | 2514.00
 
| style="text-align: right;" | 2574.00
 
| style="text-align: right;" | 2574.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-04-17
 +
| Perforation
 +
| style="text-align: right;" | 600.00
 +
| style="text-align: right;" | 601.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-04-17
 +
| Cement Squeeze
 +
| style="text-align: right;" | 600.00
 +
| style="text-align: right;" | 601.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-04-17
 +
| Cement Plug
 +
| style="text-align: right;" | 589.20
 +
| style="text-align: right;" | 601.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-04-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 574.20
 +
| style="text-align: right;" | 589.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 254: Line 278:
 
| style="text-align: right;" | 1690.00
 
| style="text-align: right;" | 1690.00
 
| style="text-align: right;" | 1713.20
 
| style="text-align: right;" | 1713.20
| style="text-align: right;" | 0
 
|-
 
| 2005-04-17
 
| Perforation
 
| style="text-align: right;" | 600.00
 
| style="text-align: right;" | 601.00
 
| style="text-align: right;" | 17
 
|-
 
| 2005-04-17
 
| Cement Squeeze
 
| style="text-align: right;" | 600.00
 
| style="text-align: right;" | 601.00
 
| style="text-align: right;" | 0
 
|-
 
| 2005-04-17
 
| Cement Plug
 
| style="text-align: right;" | 589.20
 
| style="text-align: right;" | 601.00
 
| style="text-align: right;" | 0
 
|-
 
| 2005-04-17
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 574.20
 
| style="text-align: right;" | 589.20
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 456: Line 456:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 01:42, 18 January 2021

Well Details

Well ID: 0185020516000
Loading map...
Location: 00/16-05-018-02W5/0
Location Alias: 00/16-05-18-02 W5M
Location Alias 2: 00/16-05-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 05
County/Municipality: Foothills County
Well Name: CANERA FEDERATED ONE TV 16-5-18-2
Operator Name: Legacy Oil + Gas Inc.
License Number: B0000717
License Date: 1944-07-04
License Status: RecCertified
Spud Date: 1944-12-16
Final Drill Date: 1945-05-19
Well Total Depth: 2574.00 m
Surface Hole Latitude: 50.497276
Surface Hole Longitude: -114.233963

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1944-07-04 Obtained License
1945-05-11 Production Casing Operation Performed
1945-05-19 Finished Drilling
1945-05-19 Perforation Treatment Performed - Open-Hole Completion
1945-05-19 Well Mode changed to Drilled and Cased
1945-05-20 Well Began Production
1945-05-20 Well Fluid changed to Crude Oil
1945-05-20 Well Mode changed to Gas Lift
1945-05-25 Perforation Treatment Performed - Acid Wash - No Pressure
1958-05-30 Well Fluid changed to Crude Oil
1958-05-30 Well Mode changed to Suspended
1959-12-04 Well Began Injection
1959-12-04 Well Fluid changed to Water
1959-12-04 Well Type changed to Injection
2005-04-13 Perforation Treatment Performed - Cement Plug
2005-04-13 Plug Back Performed
2005-04-13 Well Fluid changed to Water
2005-04-13 Well Mode changed to Abandoned Zone
2005-04-13 Well Type changed to Injection
2005-04-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-14 Plug Back Performed
2005-04-14 Well Log Performed
2005-04-15 Perforation Treatment Performed - Jet Perforation
2005-04-15 Well Log Performed
2005-04-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-16 Perforation Treatment Performed - Cement Plug
2005-04-16 Perforation Treatment Performed - Cement Squeeze
2005-04-16 Plug Back Performed
2005-04-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-04-17 Perforation Treatment Performed - Cement Plug
2005-04-17 Perforation Treatment Performed - Cement Squeeze
2005-04-17 Perforation Treatment Performed - Jet Perforation
2005-04-17 Plug Back Performed
2005-04-17 Well Log Performed
2005-04-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1945-05-19 Open Hole/Barefoot Completion 2514.00 2574.00 0
2005-04-17 Perforation 600.00 601.00 17
2005-04-17 Cement Squeeze 600.00 601.00 0
2005-04-17 Cement Plug 589.20 601.00 0
2005-04-17 Packing Device Capped w/Cement 574.20 589.20 0
1945-05-25 Acid Wash 2514.00 2574.00 0
2005-04-13 Cement Plug 2480.50 2564.00 0
2005-04-13 Cement Plug 2475.00 2479.00 0
2005-04-14 Packing Device Capped w/Cement 2466.00 2474.40 0
2005-04-15 Perforation 1723.00 1724.00 17
2005-04-16 Cement Squeeze 1723.00 1724.00 0
2005-04-16 Cement Plug 1713.40 1724.00 0
2005-04-16 Packing Device Capped w/Cement 1690.00 1713.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0

For data sources see[5]

References