If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 231: | Line 231: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0114142608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.937082,"lon":-111.804654,"icon":""}]} |
Location: 00/08-26-011-14W4/0 | |
Location Alias: 00/08-26-11-14 W4M | |
Location Alias 2: 00/08-26-011-14 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 14 | |
Section: 26 | |
County/Municipality: Municipal District of Taber | |
Well Name: DECL GRDFKS 8-26-11-14 | |
Operator Name: New North Resources Ltd. | |
License Number: 0144087 | |
License Date: 1990-05-07 | |
License Status: Issued | |
Spud Date: 1990-05-10 | |
Final Drill Date: 1990-05-13 | |
Well Total Depth: 950.00 m | |
Surface Hole Latitude: 49.937082 | |
Surface Hole Longitude: -111.804654 |
Date | Event |
---|---|
1990-05-07 | Obtained License |
1990-05-11 | Surface Casing Operation Performed |
1990-05-13 | Finished Drilling |
1990-05-14 | Drill Stem Test Performed |
1990-05-14 | Well Log Performed |
1990-05-15 | Drill Stem Test Performed |
1990-05-16 | Production Casing Operation Performed |
1990-05-17 | Rig Released |
1990-05-17 | Well Mode changed to Drilled and Cased |
1990-05-23 | Perforation Treatment Performed - Jet Perforation |
1990-05-23 | Well Log Performed |
1990-06-20 | Well Began Production |
1990-06-20 | Well Fluid changed to Crude Oil |
1990-06-20 | Well Mode changed to Pumping |
1992-01-01 | Well Fluid changed to Crude Oil |
1992-01-01 | Well Mode changed to Suspended |
2008-05-06 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-05-23 | Perforation | 925.00 | 926.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 4576 | 0.0 | 0.0 | 0.0 |
1991 | 3375 | 0.0 | 0.0 | 0.0 |
For data sources see[5]