X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0765223516002"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0765223516002
 
| Well ID: 0765223516002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.6340725, -117.2899539 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.632738, -117.292791 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: PENN WEST GVILLEE 16-35-76-22
+
| Location: 00/16-35-076-22W5/2
 
|-
 
|-
| Operator:
+
| Location Alias: 00/16-35-76-22 W5M
 +
|-
 +
| Location Alias 2: 00/16-35-076-22 W5/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 076
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 22
 +
|-
 +
| Section: 35
 +
|-
 +
| County/Municipality: [[Municipal District of Smoky River No. 130,_Alberta|Municipal District of Smoky River No. 130]]
 +
|-
 +
| Well Name: N7 ENERGY GVILLEE 16-35-76-22
 +
|-
 +
| Operator Name: [[N7 Energy Ltd.]]
 +
|-
 +
| License Number: 0115006
 
|-
 
|-
 
| License Date: 1985-05-31
 
| License Date: 1985-05-31
 
|-
 
|-
| Final Drilling Date: 1985-08-03
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 1985-07-11
 +
|-
 +
| Final Drill Date: 1985-08-03
 +
|-
 +
| Well Total Depth: 2474.00 m
 +
|-
 +
| Surface Hole Latitude: 55.632738
 +
|-
 +
| Surface Hole Longitude: -117.292791
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1985-05-31
 +
| Obtained License
 +
|-
 +
| 1985-07-13
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1985-07-17
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-08-03
 +
| Finished Drilling
 +
|-
 +
| 1985-08-03
 +
| Well Log Performed
 +
|-
 +
| 1985-08-03
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1985-08-04
 +
| Well Log Performed
 +
|-
 +
| 1985-08-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-08-07
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-08-08
 +
| Well Log Performed
 +
|-
 +
| 1985-08-09
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-08-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1985-08-12
 +
| Production Casing Operation Performed
 +
|-
 +
| 1985-08-13
 +
| Rig Released
 +
|-
 +
| 1985-11-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-06-18
 +
| Well Log Performed
 +
|-
 +
| 2003-06-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-06-21
 +
| Well Log Performed
 +
|-
 +
| 2003-06-24
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2003-06-24
 +
| Plug Back Performed
 +
|-
 +
| 2003-06-24
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2003-06-25
 +
| Well Log Performed
 +
|-
 +
| 2007-10-16
 +
| Well Log Performed
 +
|-
 +
| 2007-10-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-10-19
 +
| Well Log Performed
 +
|-
 +
| 2007-10-29
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2007-11-08
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2007-11-08
 +
| Plug Back Performed
 +
|-
 +
| 2008-07-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-07-03
 +
| Well Log Performed
 +
|-
 +
| 2008-07-04
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-07-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-07-05
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-07-05
 +
| Well Log Performed
 +
|-
 +
| 2008-07-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-07-06
 +
| Well Log Performed
 +
|-
 +
| 2008-07-08
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2008-07-16
 +
| Well Began Production
 +
|-
 +
| 2008-07-16
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2008-07-16
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2010-09-02
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2010-09-02
 +
| Well Mode changed to Suspended
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1985-11-04
 +
| Perforation
 +
| style="text-align: right;" | 2444.00
 +
| style="text-align: right;" | 2446.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-07-05
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 2413.50
 +
| style="text-align: right;" | 2414.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-07-06
 +
| Perforation
 +
| style="text-align: right;" | 2400.50
 +
| style="text-align: right;" | 2404.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2008-07-08
 +
| Fracture
 +
| style="text-align: right;" | 2400.50
 +
| style="text-align: right;" | 2404.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-06-21
 +
| Perforation
 +
| style="text-align: right;" | 2401.00
 +
| style="text-align: right;" | 2403.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2003-06-24
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2401.00
 +
| style="text-align: right;" | 2403.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-10-19
 +
| Perforation
 +
| style="text-align: right;" | 2400.50
 +
| style="text-align: right;" | 2404.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2007-10-29
 +
| Fracture
 +
| style="text-align: right;" | 2400.50
 +
| style="text-align: right;" | 2404.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-11-08
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2419.00
 +
| style="text-align: right;" | 2429.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-07-03
 +
| Perforation
 +
| style="text-align: right;" | 2418.00
 +
| style="text-align: right;" | 2419.00
 +
| style="text-align: right;" | 20
 
|-
 
|-
| Total Depth: 2474.0m
+
| 2008-07-04
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 2418.00
 +
| style="text-align: right;" | 2419.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2008-07-05
 +
| Perforation
 +
| style="text-align: right;" | 2413.50
 +
| style="text-align: right;" | 2414.50
 +
| style="text-align: right;" | 20
 
|-
 
|-
| Status: Suspended
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| Well Type: Not Applicable
+
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| Configuration: Vertical
+
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 
|-
 
|-
| Violations:
+
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 
|-
 
|-
| Latitude: 55.6340725
+
| 2008
 +
| style="text-align: right;" | 2378
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
| Longitude: -117.2899539
+
| 2009
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 07:39, 18 January 2021

Well Details

Well ID: 0765223516002
Loading map...
Location: 00/16-35-076-22W5/2
Location Alias: 00/16-35-76-22 W5M
Location Alias 2: 00/16-35-076-22 W5/02
Country: Canada
Province: Alberta
Township: 076
Meridian: 5
Range: 22
Section: 35
County/Municipality: Municipal District of Smoky River No. 130
Well Name: N7 ENERGY GVILLEE 16-35-76-22
Operator Name: N7 Energy Ltd.
License Number: 0115006
License Date: 1985-05-31
License Status: Suspension
Spud Date: 1985-07-11
Final Drill Date: 1985-08-03
Well Total Depth: 2474.00 m
Surface Hole Latitude: 55.632738
Surface Hole Longitude: -117.292791

For data sources see[1][2]

Well History

Date Event
1985-05-31 Obtained License
1985-07-13 Surface Casing Operation Performed
1985-07-17 Drill Stem Test Performed
1985-08-03 Finished Drilling
1985-08-03 Well Log Performed
1985-08-03 Well Mode changed to Drilled and Cased
1985-08-04 Well Log Performed
1985-08-06 Drill Stem Test Performed
1985-08-07 Drill Stem Test Performed
1985-08-08 Well Log Performed
1985-08-09 Drill Stem Test Performed
1985-08-10 Drill Stem Test Performed
1985-08-12 Production Casing Operation Performed
1985-08-13 Rig Released
1985-11-04 Perforation Treatment Performed - Jet Perforation
2003-06-18 Well Log Performed
2003-06-21 Perforation Treatment Performed - Jet Perforation
2003-06-21 Well Log Performed
2003-06-24 Perforation Treatment Performed - Cement Squeeze
2003-06-24 Plug Back Performed
2003-06-24 Well Mode changed to Abandoned Zone
2003-06-25 Well Log Performed
2007-10-16 Well Log Performed
2007-10-19 Perforation Treatment Performed - Jet Perforation
2007-10-19 Well Log Performed
2007-10-29 Perforation Treatment Performed - Fractured
2007-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-08 Plug Back Performed
2008-07-03 Perforation Treatment Performed - Jet Perforation
2008-07-03 Well Log Performed
2008-07-04 Perforation Treatment Performed - Remedial Casing
2008-07-05 Perforation Treatment Performed - Jet Perforation
2008-07-05 Perforation Treatment Performed - Remedial Casing
2008-07-05 Well Log Performed
2008-07-06 Perforation Treatment Performed - Jet Perforation
2008-07-06 Well Log Performed
2008-07-08 Perforation Treatment Performed - Fractured
2008-07-16 Well Began Production
2008-07-16 Well Fluid changed to Crude Oil
2008-07-16 Well Mode changed to Pumping
2010-09-02 Well Fluid changed to Crude Oil
2010-09-02 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-04 Perforation 2444.00 2446.00 13
2008-07-05 Remedial Casing Cementing 2413.50 2414.50 0
2008-07-06 Perforation 2400.50 2404.00 20
2008-07-08 Fracture 2400.50 2404.00 0
2003-06-21 Perforation 2401.00 2403.00 20
2003-06-24 Cement Squeeze 2401.00 2403.00 0
2007-10-19 Perforation 2400.50 2404.00 20
2007-10-29 Fracture 2400.50 2404.00 0
2007-11-08 Packing Device Capped w/Cement 2419.00 2429.00 0
2008-07-03 Perforation 2418.00 2419.00 20
2008-07-04 Remedial Casing Cementing 2418.00 2419.00 0
2008-07-05 Perforation 2413.50 2414.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2378 0.0 0.0 0.0
2009 100 0.0 0.0 0.0

For data sources see[5]

References