X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0766063215000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0766063215000
 
| Well ID: 0766063215000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.63532000000003563, -118.89979399999998577 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.635320, -118.899794 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/15-32-076-06W6/0
 
| Location: 00/15-32-076-06W6/0
 
|-
 
|-
| Well Name: D3EXP VALHALLA 15-32-76-6
+
| Location Alias: 00/15-32-76-06 W6M
 +
|-
 +
| Location Alias 2: 00/15-32-076-06 W6/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 076
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 06
 +
|-
 +
| Section: 32
 +
|-
 +
| County/Municipality: [[Saddle Hills County,_Alberta|Saddle Hills County]]
 +
|-
 +
| Well Name: BOULDER VALHALLA 15-32-76-6
 +
|-
 +
| Operator Name: [[Boulder Energy Ltd.]]
 +
|-
 +
| License Number: 0418804
 
|-
 
|-
 
| License Date: 2010-02-23
 
| License Date: 2010-02-23
 
|-
 
|-
| Final Drilling Date: 2010-03-08
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 2010-03-02
 +
|-
 +
| Final Drill Date: 2010-03-08
 +
|-
 +
| Well Total Depth: 1858.00 m
 +
|-
 +
| Surface Hole Latitude: 55.635320
 +
|-
 +
| Surface Hole Longitude: -118.899794
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-02-23
 +
| Obtained License
 +
|-
 +
| 2010-03-02
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2010-03-03
 +
| Direction Drilling Operation Performed - Deviate
 
|-
 
|-
| Total Depth: 1858.0m
+
| 2010-03-08
 +
| Finished Drilling
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2010-03-08
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Status: Abandoned
+
| 2010-03-09
 +
| Well Log Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 2010-03-11
 +
| Production Casing Operation Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2010-03-11
 +
| Rig Released
 
|-
 
|-
| Latitude: 55.63532000000003563
+
| 2010-05-20
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Longitude: -118.89979399999998577
+
| 2010-05-27
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
 +
| 2010-05-31
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-05-31
 +
| Plug Back Performed
 +
|-
 +
| 2010-05-31
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2011-06-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-06-11
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2011-10-21
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2011-10-23
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2011-10-23
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2011-10-23
 +
| Plug Back Performed
 +
|-
 +
| 2012-03-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-03-14
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2012-04-20
 +
| Well Abandoned
 +
|-
 +
| 2012-04-20
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
  
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2010-03-03
 +
| style="text-align: right;" | 283.00
 +
| Deviate (5 - 79 degrees)
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2010-05-20
 +
| Perforation
 +
| style="text-align: right;" | 1791.00
 +
| style="text-align: right;" | 1796.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-03-09
 +
| Perforation
 +
| style="text-align: right;" | 400.00
 +
| style="text-align: right;" | 401.00
 +
| style="text-align: right;" | 99
 +
|-
 +
| 2012-03-14
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 430.00
 +
| style="text-align: right;" | 431.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-03-14
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 400.00
 +
| style="text-align: right;" | 401.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-05-27
 +
| Fracture
 +
| style="text-align: right;" | 1791.00
 +
| style="text-align: right;" | 1796.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2010-05-31
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1774.00
 +
| style="text-align: right;" | 1782.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-06-10
 +
| Perforation
 +
| style="text-align: right;" | 426.00
 +
| style="text-align: right;" | 429.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2011-06-11
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 426.00
 +
| style="text-align: right;" | 429.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-21
 +
| Perforation
 +
| style="text-align: right;" | 1791.00
 +
| style="text-align: right;" | 1796.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2011-10-23
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1791.00
 +
| style="text-align: right;" | 1796.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-10-23
 +
| Cement Plug
 +
| style="text-align: right;" | 1764.00
 +
| style="text-align: right;" | 1793.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-03-09
 +
| Perforation
 +
| style="text-align: right;" | 430.00
 +
| style="text-align: right;" | 431.00
 +
| style="text-align: right;" | 99
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-03-09
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 07:59, 18 January 2021

Well Details

Well ID: 0766063215000
Loading map...
Location: 00/15-32-076-06W6/0
Location Alias: 00/15-32-76-06 W6M
Location Alias 2: 00/15-32-076-06 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 06
Section: 32
County/Municipality: Saddle Hills County
Well Name: BOULDER VALHALLA 15-32-76-6
Operator Name: Boulder Energy Ltd.
License Number: 0418804
License Date: 2010-02-23
License Status: Abandoned
Spud Date: 2010-03-02
Final Drill Date: 2010-03-08
Well Total Depth: 1858.00 m
Surface Hole Latitude: 55.635320
Surface Hole Longitude: -118.899794

For data sources see[1][2]

Well History

Date Event
2010-02-23 Obtained License
2010-03-02 Surface Casing Operation Performed
2010-03-03 Direction Drilling Operation Performed - Deviate
2010-03-08 Finished Drilling
2010-03-08 Well Mode changed to Drilled and Cased
2010-03-09 Well Log Performed
2010-03-11 Production Casing Operation Performed
2010-03-11 Rig Released
2010-05-20 Perforation Treatment Performed - Jet Perforation
2010-05-27 Perforation Treatment Performed - Fractured
2010-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-31 Plug Back Performed
2010-05-31 Well Mode changed to Abandoned Zone
2011-06-10 Perforation Treatment Performed - Jet Perforation
2011-06-11 Perforation Treatment Performed - Remedial Casing
2011-10-21 Perforation Treatment Performed - Jet Perforation
2011-10-23 Perforation Treatment Performed - Cement Plug
2011-10-23 Perforation Treatment Performed - Cement Squeeze
2011-10-23 Plug Back Performed
2012-03-09 Perforation Treatment Performed - Jet Perforation
2012-03-14 Perforation Treatment Performed - Remedial Casing
2012-04-20 Well Abandoned
2012-04-20 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-03 283.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-05-20 Perforation 1791.00 1796.00 17
2012-03-09 Perforation 400.00 401.00 99
2012-03-14 Remedial Casing Cementing 430.00 431.00 0
2012-03-14 Remedial Casing Cementing 400.00 401.00 0
2010-05-27 Fracture 1791.00 1796.00 0
2010-05-31 Packing Device Capped w/Cement 1774.00 1782.00 0
2011-06-10 Perforation 426.00 429.00 13
2011-06-11 Remedial Casing Cementing 426.00 429.00 0
2011-10-21 Perforation 1791.00 1796.00 17
2011-10-23 Cement Squeeze 1791.00 1796.00 0
2011-10-23 Cement Plug 1764.00 1793.00 0
2012-03-09 Perforation 430.00 431.00 99

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References