If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0554212309050 | | Well ID: 0554212309050 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 53.776260, -113.005439 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Location: 05/09-23-055-21W4/0 |
|- | |- | ||
− | | Operator: | + | | Location Alias: 05/09-23-55-21 W4M |
+ | |- | ||
+ | | Location Alias 2: 05/09-23-055-21 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 055 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 21 | ||
+ | |- | ||
+ | | Section: 23 | ||
+ | |- | ||
+ | | County/Municipality: [[Strathcona County,_Alberta|Strathcona County]] | ||
+ | |- | ||
+ | | Well Name: RSO REDWATER 9-23-55-21 | ||
+ | |- | ||
+ | | Operator Name: [[Rifle Shot Oil Corp.]] | ||
+ | |- | ||
+ | | License Number: 0447484 | ||
|- | |- | ||
| License Date: 2012-07-31 | | License Date: 2012-07-31 | ||
|- | |- | ||
− | | Final | + | | License Status: Suspension |
+ | |- | ||
+ | | Spud Date: 2012-08-29 | ||
+ | |- | ||
+ | | Final Drill Date: 2012-09-04 | ||
+ | |- | ||
+ | | Well Total Depth: 1811.00 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 53.776260 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -113.005439 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-07-31 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 2012-08-29 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-08-30 | ||
+ | | Surface Casing Operation Performed | ||
+ | |- | ||
+ | | 2012-08-31 | ||
+ | | Direction Drilling Operation Performed - Deviate | ||
+ | |- | ||
+ | | 2012-09-01 | ||
+ | | Direction Drilling Operation Performed - Horizontal | ||
|- | |- | ||
− | | | + | | 2012-09-02 |
+ | | Intermediate Casing Operation Performed | ||
|- | |- | ||
− | | | + | | 2012-09-04 |
+ | | Finished Drilling | ||
|- | |- | ||
− | | | + | | 2012-09-04 |
+ | | Well Log Performed | ||
|- | |- | ||
− | | Well | + | | 2012-09-04 |
+ | | Well Mode changed to Drilled and Cased | ||
|- | |- | ||
− | | | + | | 2012-09-05 |
+ | | Liner Casing Operation Performed | ||
|- | |- | ||
− | | | + | | 2012-09-05 |
+ | | Rig Released | ||
|- | |- | ||
− | | | + | | 2012-09-15 |
+ | | Well Log Performed | ||
|- | |- | ||
− | | | + | | 2012-09-20 |
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-10-01 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 2012-10-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2012-10-01 | ||
+ | | Well Mode changed to Pumping | ||
+ | |- | ||
+ | | 2015-02-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2015-02-01 | ||
+ | | Well Mode changed to Suspended | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | == Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | | 2012-08-29 | ||
+ | | [[Trinidad Drilling Ltd.]] | ||
+ | | style="text-align: right;" | 66 | ||
+ | | style="text-align: right;" | N/A | ||
+ | | Drill To LD | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =ST49: Daily Spud and Drilling Activity List | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-09 }}</ref> | ||
+ | == Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | | 2012-08-31 | ||
+ | | style="text-align: right;" | 643.20 | ||
+ | | Deviate (5 - 79 degrees) | ||
+ | |- | ||
+ | | 2012-09-01 | ||
+ | | style="text-align: right;" | 1033.50 | ||
+ | | Horizontal | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Direction Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1764.90 | ||
+ | | style="text-align: right;" | 1765.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1180.90 | ||
+ | | style="text-align: right;" | 1181.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1105.90 | ||
+ | | style="text-align: right;" | 1106.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1713.90 | ||
+ | | style="text-align: right;" | 1714.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1650.90 | ||
+ | | style="text-align: right;" | 1651.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1605.90 | ||
+ | | style="text-align: right;" | 1606.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1505.90 | ||
+ | | style="text-align: right;" | 1506.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1440.90 | ||
+ | | style="text-align: right;" | 1441.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1400.90 | ||
+ | | style="text-align: right;" | 1401.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1250.90 | ||
+ | | style="text-align: right;" | 1251.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-09-20 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1215.90 | ||
+ | | style="text-align: right;" | 1216.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 2012 | ||
+ | | style="text-align: right;" | 854 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Well Production Data - All Alberta | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-25 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | | 2012-09-04 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | | 2012-09-29 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Occurence Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 0554212309050 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.77626,"lon":-113.005439,"icon":""}]} |
Location: 05/09-23-055-21W4/0 | |
Location Alias: 05/09-23-55-21 W4M | |
Location Alias 2: 05/09-23-055-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 4 | |
Range: 21 | |
Section: 23 | |
County/Municipality: Strathcona County | |
Well Name: RSO REDWATER 9-23-55-21 | |
Operator Name: Rifle Shot Oil Corp. | |
License Number: 0447484 | |
License Date: 2012-07-31 | |
License Status: Suspension | |
Spud Date: 2012-08-29 | |
Final Drill Date: 2012-09-04 | |
Well Total Depth: 1811.00 m | |
Surface Hole Latitude: 53.776260 | |
Surface Hole Longitude: -113.005439 |
Date | Event |
---|---|
2012-07-31 | Obtained License |
2012-08-29 | Well Log Performed |
2012-08-30 | Surface Casing Operation Performed |
2012-08-31 | Direction Drilling Operation Performed - Deviate |
2012-09-01 | Direction Drilling Operation Performed - Horizontal |
2012-09-02 | Intermediate Casing Operation Performed |
2012-09-04 | Finished Drilling |
2012-09-04 | Well Log Performed |
2012-09-04 | Well Mode changed to Drilled and Cased |
2012-09-05 | Liner Casing Operation Performed |
2012-09-05 | Rig Released |
2012-09-15 | Well Log Performed |
2012-09-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-01 | Well Began Production |
2012-10-01 | Well Fluid changed to Crude Oil |
2012-10-01 | Well Mode changed to Pumping |
2015-02-01 | Well Fluid changed to Crude Oil |
2015-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-29 | Trinidad Drilling Ltd. | 66 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-31 | 643.20 | Deviate (5 - 79 degrees) |
2012-09-01 | 1033.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-20 | Multi-Stage Fracture | 1764.90 | 1765.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 1180.90 | 1181.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 1105.90 | 1106.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 1713.90 | 1714.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 1650.90 | 1651.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 1605.90 | 1606.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 1505.90 | 1506.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 1440.90 | 1441.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 1400.90 | 1401.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 1250.90 | 1251.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 1215.90 | 1216.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 854 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-04 | No Incident Encountered | 0.00 | 0.00 |
2012-09-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]