X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0554213211032"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0554213211032
 
| Well ID: 0554213211032
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.79747, -113.089488 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.797470, -113.089488 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 03/11-32-055-21W4/2
 
| Location: 03/11-32-055-21W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 03/11-32-055-21 W4/02
 
| Location Alias 2: 03/11-32-055-21 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 055
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 21
 +
|-
 +
| Section: 32
 
|-
 
|-
 
| County/Municipality: [[Strathcona County,_Alberta|Strathcona County]]
 
| County/Municipality: [[Strathcona County,_Alberta|Strathcona County]]
Line 17: Line 27:
 
| Well Name: SCL REDWATER 11-32-55-21
 
| Well Name: SCL REDWATER 11-32-55-21
 
|-
 
|-
| Operator Name: [[Shell Canada Energy]]
+
| Operator Name: [[Shell Canada Limited]]
 
|-
 
|-
 
| License Number: 0403148
 
| License Number: 0403148
Line 29: Line 39:
 
| Final Drill Date: 2008-12-28
 
| Final Drill Date: 2008-12-28
 
|-
 
|-
| Well Total Depth: 2255 m
+
| Well Total Depth: 2255.00 m
 
|-
 
|-
| Surface Hole Latitude: 53.79747
+
| Surface Hole Latitude: 53.797470
 
|-
 
|-
 
| Surface Hole Longitude: -113.089488
 
| Surface Hole Longitude: -113.089488
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-11-03
 +
| Obtained License
 +
|-
 +
| 2008-11-11
 +
| Well Log Performed
 +
|-
 +
| 2008-11-12
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2008-11-15
 +
| Lost Circulation Occurred
 +
|-
 +
| 2008-11-22
 +
| Well Log Performed
 +
|-
 +
| 2008-11-27
 +
| Well Log Performed
 +
|-
 +
| 2008-11-28
 +
| Intermediate Casing Operation Performed
 +
|-
 +
| 2008-12-20
 +
| Well Log Performed
 +
|-
 +
| 2008-12-22
 +
| Well Log Performed
 +
|-
 +
| 2008-12-25
 +
| Well Log Performed
 +
|-
 +
| 2008-12-28
 +
| Finished Drilling
 +
|-
 +
| 2008-12-28
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2008-12-29
 +
| Liner Casing Operation Performed
 +
|-
 +
| 2008-12-31
 +
| Well Log Performed
 +
|-
 +
| 2009-01-02
 +
| Rig Released
 +
|-
 +
| 2009-02-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-02-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2009-02-11
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-02-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-02-13
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2009-02-14
 +
| Well Log Performed
 +
|-
 +
| 2009-02-19
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2009-02-19
 +
| Plug Back Performed
 +
|-
 +
| 2009-02-20
 +
| Perforation Treatment Performed - Bridge Plug No Cement Required
 +
|-
 +
| 2009-02-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-02-21
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-02-22
 +
| Perforation Treatment Performed - Bridge Plug No Cement Required
 +
|-
 +
| 2009-02-22
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2009-02-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-02-23
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-02-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2009-02-24
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2009-02-24
 +
| Plug Back Performed
 +
|-
 +
| 2009-02-26
 +
| Perforation Treatment Performed - Bridge Plug No Cement Required
 +
|-
 +
| 2009-02-27
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2009-02-27
 +
| Plug Back Performed
 +
|-
 +
| 2009-02-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2009-03-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-03-03
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2009-09-01
 +
| Well Began Injection
 +
|-
 +
| 2009-09-01
 +
| Well Fluid changed to Waste
 +
|-
 +
| 2009-09-01
 +
| Well Type changed to Industrial
 +
|-
 +
| 2012-03-29
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2014-07-10
 +
| Well Log Performed
 +
|-
 +
| 2014-09-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2019-12-03
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 234:
 
| 2009-02-08
 
| 2009-02-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2188
+
| style="text-align: right;" | 2188.00
| style="text-align: right;" | 2193
+
| style="text-align: right;" | 2193.00
| style="text-align: right;" | 13
 
|-
 
| 2009-02-10
 
| Acid Treatment
 
| style="text-align: right;" | 2188
 
| style="text-align: right;" | 2193
 
| style="text-align: right;" | 0
 
|-
 
| 2009-02-11
 
| Fracture
 
| style="text-align: right;" | 2188
 
| style="text-align: right;" | 2193
 
| style="text-align: right;" | 0
 
|-
 
| 2009-02-12
 
| Perforation
 
| style="text-align: right;" | 2197.3
 
| style="text-align: right;" | 2202.6
 
| style="text-align: right;" | 13
 
|-
 
| 2009-02-12
 
| Perforation
 
| style="text-align: right;" | 2193
 
| style="text-align: right;" | 2196.2
 
| style="text-align: right;" | 13
 
|-
 
| 2009-02-12
 
| Perforation
 
| style="text-align: right;" | 2182.5
 
| style="text-align: right;" | 2187.1
 
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-02-12
 
| 2009-02-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2172.9
+
| style="text-align: right;" | 2179.60
| style="text-align: right;" | 2173.4
+
| style="text-align: right;" | 2181.50
| style="text-align: right;" | 13
 
|-
 
| 2009-02-12
 
| Perforation
 
| style="text-align: right;" | 2174
 
| style="text-align: right;" | 2174.6
 
| style="text-align: right;" | 13
 
|-
 
| 2009-02-12
 
| Perforation
 
| style="text-align: right;" | 2176.1
 
| style="text-align: right;" | 2176.7
 
| style="text-align: right;" | 13
 
|-
 
| 2009-02-12
 
| Perforation
 
| style="text-align: right;" | 2179.6
 
| style="text-align: right;" | 2181.5
 
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-02-13
 
| 2009-02-13
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2172.9
+
| style="text-align: right;" | 2172.90
| style="text-align: right;" | 2202.6
+
| style="text-align: right;" | 2202.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-19
 
| 2009-02-19
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 2159.7
+
| style="text-align: right;" | 2159.70
| style="text-align: right;" | 2233
+
| style="text-align: right;" | 2233.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-20
 
| 2009-02-20
 
| Bridge Plug, No Cement
 
| Bridge Plug, No Cement
| style="text-align: right;" | 2158
+
| style="text-align: right;" | 2158.00
| style="text-align: right;" | 2158.5
+
| style="text-align: right;" | 2158.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-20
 
| 2009-02-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2150.5
+
| style="text-align: right;" | 2150.50
| style="text-align: right;" | 2151.5
+
| style="text-align: right;" | 2151.50
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2009-02-21
 
| 2009-02-21
| Fracture  
+
| Fracture
| style="text-align: right;" | 2150.5
+
| style="text-align: right;" | 2150.50
| style="text-align: right;" | 2151.5
+
| style="text-align: right;" | 2151.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-22
 
| 2009-02-22
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 2150
+
| style="text-align: right;" | 2150.00
| style="text-align: right;" | 2158
+
| style="text-align: right;" | 2158.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-22
 
| 2009-02-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2122
+
| style="text-align: right;" | 2122.00
| style="text-align: right;" | 2123
+
| style="text-align: right;" | 2123.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2009-02-22
 
| 2009-02-22
 
| Bridge Plug, No Cement
 
| Bridge Plug, No Cement
| style="text-align: right;" | 2145
+
| style="text-align: right;" | 2145.00
| style="text-align: right;" | 2145.5
+
| style="text-align: right;" | 2145.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-23
 
| 2009-02-23
| Fracture  
+
| Fracture
| style="text-align: right;" | 2122
+
| style="text-align: right;" | 2122.00
| style="text-align: right;" | 2123
+
| style="text-align: right;" | 2123.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-02-10
 +
| Acid Treatment
 +
| style="text-align: right;" | 2188.00
 +
| style="text-align: right;" | 2193.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-24
 
| 2009-02-24
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 2137
+
| style="text-align: right;" | 2137.00
| style="text-align: right;" | 2145
+
| style="text-align: right;" | 2145.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-24
 
| 2009-02-24
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2107
+
| style="text-align: right;" | 2107.00
| style="text-align: right;" | 2115
+
| style="text-align: right;" | 2115.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-26
 
| 2009-02-26
 
| Bridge Plug, No Cement
 
| Bridge Plug, No Cement
| style="text-align: right;" | 1716
+
| style="text-align: right;" | 1716.00
| style="text-align: right;" | 1716.5
+
| style="text-align: right;" | 1716.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-27
 
| 2009-02-27
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1662
+
| style="text-align: right;" | 1662.00
| style="text-align: right;" | 1716
+
| style="text-align: right;" | 1716.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-02-28
 
| 2009-02-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1062
+
| style="text-align: right;" | 1062.00
| style="text-align: right;" | 1070
+
| style="text-align: right;" | 1070.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009-03-01
 
| 2009-03-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 990
+
| style="text-align: right;" | 990.00
| style="text-align: right;" | 1038
+
| style="text-align: right;" | 1038.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2009-03-03
 
| 2009-03-03
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 990
+
| style="text-align: right;" | 990.00
| style="text-align: right;" | 1038
+
| style="text-align: right;" | 1038.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012-03-29
 
| 2012-03-29
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 990
+
| style="text-align: right;" | 990.00
| style="text-align: right;" | 1038
+
| style="text-align: right;" | 1038.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014-09-17
 
| 2014-09-17
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 990
+
| style="text-align: right;" | 990.00
| style="text-align: right;" | 1038
+
| style="text-align: right;" | 1038.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-02-11
 +
| Fracture
 +
| style="text-align: right;" | 2188.00
 +
| style="text-align: right;" | 2193.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 2009-02-12
 +
| Perforation
 +
| style="text-align: right;" | 2197.30
 +
| style="text-align: right;" | 2202.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-02-12
 +
| Perforation
 +
| style="text-align: right;" | 2193.00
 +
| style="text-align: right;" | 2196.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-02-12
 +
| Perforation
 +
| style="text-align: right;" | 2182.50
 +
| style="text-align: right;" | 2187.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-02-12
 +
| Perforation
 +
| style="text-align: right;" | 2172.90
 +
| style="text-align: right;" | 2173.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-02-12
 +
| Perforation
 +
| style="text-align: right;" | 2174.00
 +
| style="text-align: right;" | 2174.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-02-12
 +
| Perforation
 +
| style="text-align: right;" | 2176.10
 +
| style="text-align: right;" | 2176.70
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
Line 244: Line 404:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 345: Line 519:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 361: Line 535:
 
|-
 
|-
 
| 2012-04-03
 
| 2012-04-03
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2014-09-19
 
| 2014-09-19
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 +
|-
 +
| 2020-03-21
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 374: Line 553:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 09:46, 18 January 2021

Well Details

Well ID: 0554213211032
Loading map...
Location: 03/11-32-055-21W4/2
Location Alias: 03/11-32-55-21 W4M
Location Alias 2: 03/11-32-055-21 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 21
Section: 32
County/Municipality: Strathcona County
Well Name: SCL REDWATER 11-32-55-21
Operator Name: Shell Canada Limited
License Number: 0403148
License Date: 2008-11-03
License Status: Amended
Spud Date: 2008-11-10
Final Drill Date: 2008-12-28
Well Total Depth: 2255.00 m
Surface Hole Latitude: 53.797470
Surface Hole Longitude: -113.089488

For data sources see[1][2]

Well History

Date Event
2008-11-03 Obtained License
2008-11-11 Well Log Performed
2008-11-12 Surface Casing Operation Performed
2008-11-15 Lost Circulation Occurred
2008-11-22 Well Log Performed
2008-11-27 Well Log Performed
2008-11-28 Intermediate Casing Operation Performed
2008-12-20 Well Log Performed
2008-12-22 Well Log Performed
2008-12-25 Well Log Performed
2008-12-28 Finished Drilling
2008-12-28 Well Mode changed to Drilled and Cased
2008-12-29 Liner Casing Operation Performed
2008-12-31 Well Log Performed
2009-01-02 Rig Released
2009-02-08 Perforation Treatment Performed - Jet Perforation
2009-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-11 Perforation Treatment Performed - Fractured
2009-02-12 Perforation Treatment Performed - Jet Perforation
2009-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-14 Well Log Performed
2009-02-19 Perforation Treatment Performed - Cement Plug
2009-02-19 Plug Back Performed
2009-02-20 Perforation Treatment Performed - Bridge Plug No Cement Required
2009-02-20 Perforation Treatment Performed - Jet Perforation
2009-02-21 Perforation Treatment Performed - Fractured
2009-02-22 Perforation Treatment Performed - Bridge Plug No Cement Required
2009-02-22 Perforation Treatment Performed - Cement Plug
2009-02-22 Perforation Treatment Performed - Jet Perforation
2009-02-23 Perforation Treatment Performed - Fractured
2009-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-24 Perforation Treatment Performed - Cement Plug
2009-02-24 Plug Back Performed
2009-02-26 Perforation Treatment Performed - Bridge Plug No Cement Required
2009-02-27 Perforation Treatment Performed - Cement Plug
2009-02-27 Plug Back Performed
2009-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-01 Perforation Treatment Performed - Jet Perforation
2009-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-09-01 Well Began Injection
2009-09-01 Well Fluid changed to Waste
2009-09-01 Well Type changed to Industrial
2012-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-07-10 Well Log Performed
2014-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-12-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-08 Perforation 2188.00 2193.00 13
2009-02-12 Perforation 2179.60 2181.50 13
2009-02-13 Acid Treatment 2172.90 2202.60 0
2009-02-19 Cement Plug 2159.70 2233.00 0
2009-02-20 Bridge Plug, No Cement 2158.00 2158.50 0
2009-02-20 Perforation 2150.50 2151.50 20
2009-02-21 Fracture 2150.50 2151.50 0
2009-02-22 Cement Plug 2150.00 2158.00 0
2009-02-22 Perforation 2122.00 2123.00 20
2009-02-22 Bridge Plug, No Cement 2145.00 2145.50 0
2009-02-23 Fracture 2122.00 2123.00 0
2009-02-10 Acid Treatment 2188.00 2193.00 0
2009-02-24 Cement Plug 2137.00 2145.00 0
2009-02-24 Packing Device Capped w/Cement 2107.00 2115.00 0
2009-02-26 Bridge Plug, No Cement 1716.00 1716.50 0
2009-02-27 Cement Plug 1662.00 1716.00 0
2009-02-28 Packing Device Capped w/Cement 1062.00 1070.00 0
2009-03-01 Perforation 990.00 1038.00 13
2009-03-03 Acid Treatment 990.00 1038.00 0
2012-03-29 Acid Treatment 990.00 1038.00 0
2014-09-17 Acid Treatment 990.00 1038.00 0
2009-02-11 Fracture 2188.00 2193.00 0
2009-02-12 Perforation 2197.30 2202.60 13
2009-02-12 Perforation 2193.00 2196.20 13
2009-02-12 Perforation 2182.50 2187.10 13
2009-02-12 Perforation 2172.90 2173.40 13
2009-02-12 Perforation 2174.00 2174.60 13
2009-02-12 Perforation 2176.10 2176.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-11-15 Lost Circulation 947.00 1005.00
2012-04-03 No Incident Encountered 0.00 0.00
2014-09-19 No Incident Encountered 0.00 0.00
2020-03-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References