X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0555183605000"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0555183605000
 
| Well ID: 0555183605000
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.793901, -116.55207 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.793901, -116.552070 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/05-36-055-18W5/0
 
| Location: 00/05-36-055-18W5/0
Line 43: Line 43:
 
| Surface Hole Latitude: 53.793901
 
| Surface Hole Latitude: 53.793901
 
|-
 
|-
| Surface Hole Longitude: -116.55207
+
| Surface Hole Longitude: -116.552070
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 285: Line 285:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 11:37, 18 January 2021

Well Details

Well ID: 0555183605000
Loading map...
Location: 00/05-36-055-18W5/0
Location Alias: 00/05-36-55-18 W5M
Location Alias 2: 00/05-36-055-18 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 18
Section: 36
County/Municipality: Yellowhead County
Well Name: MANCAL PINE 5-36-55-18
Operator Name: Mancal Energy Inc.
License Number: 0321411
License Date: 2004-12-10
License Status: Suspension
Spud Date: 2005-01-26
Final Drill Date: 2005-02-11
Well Total Depth: 2755.00 m
Surface Hole Latitude: 53.793901
Surface Hole Longitude: -116.552070

For data sources see[1][2]

Well History

Date Event
2004-12-10 Obtained License
2005-01-28 Surface Casing Operation Performed
2005-01-30 Direction Drilling Operation Performed - Deviate
2005-02-11 Finished Drilling
2005-02-11 Well Mode changed to Drilled and Cased
2005-02-12 Well Log Performed
2005-02-13 Production Casing Operation Performed
2005-02-14 Rig Released
2006-02-03 Perforation Treatment Performed - Jet Perforation
2006-02-03 Well Log Performed
2006-02-04 Perforation Treatment Performed - Fractured
2006-02-06 Well Fluid changed to Gas
2006-02-06 Well Mode changed to Testing
2006-03-23 Well Began Production
2006-03-23 Well Fluid changed to Gas
2006-03-23 Well Mode changed to Flowing
2015-06-01 Well Fluid changed to Gas
2015-06-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-01-30 1555.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-03 Perforation 2557.00 2563.50 20
2006-02-04 Fracture 2557.00 2563.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5642 0.0 0.0 0.0
2007 7068 0.0 0.0 0.0
2008 7537 0.0 0.0 0.0
2009 7967 0.0 0.0 0.0
2010 8091 0.0 0.0 0.0
2011 8479 0.0 0.0 0.0
2012 7139 0.0 0.0 0.0
2013 5575 0.0 0.0 0.0

For data sources see[6]

References