If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 252: | Line 252: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0474203303000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.09209,"lon":-112.869287,"icon":""}]} |
Location: 00/03-33-047-20W4/0 | |
Location Alias: 00/03-33-47-20 W4M | |
Location Alias 2: 00/03-33-047-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 4 | |
Range: 20 | |
Section: 33 | |
County/Municipality: Camrose County | |
Well Name: GOLDEN SPIKE-DEMPSEY CAMROSE NO. 4 | |
Operator Name: Sevenway Capital Corporation | |
License Number: 0004287 | |
License Date: 1952-02-29 | |
License Status: RecCertified | |
Spud Date: 1952-03-20 | |
Final Drill Date: 1952-03-29 | |
Well Total Depth: 993.60 m | |
Surface Hole Latitude: 53.092090 | |
Surface Hole Longitude: -112.869287 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-02-29 | Obtained License |
1952-03-25 | Drill Stem Test Performed |
1952-03-26 | Drill Stem Test Performed |
1952-03-28 | Drill Stem Test Performed |
1952-03-29 | Finished Drilling |
1952-03-29 | Well Mode changed to Drilled and Cased |
1952-03-30 | Production Casing Operation Performed |
1952-05-01 | Perforation Treatment Performed - Bullet Perforation |
1952-05-16 | Well Began Production |
1952-05-16 | Well Fluid changed to Crude Oil |
1952-05-16 | Well Mode changed to Pumping |
1965-07-06 | Perforation Treatment Performed - Cement Plug |
1965-07-13 | Well Abandoned |
1965-07-13 | Well Fluid changed to Crude Oil |
1965-07-13 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-05-01 | Bullet Perforation | 974.80 | 979.00 | 13 |
1952-05-01 | Bullet Perforation | 975.40 | 976.00 | 26 |
1965-07-06 | Cement Plug | 944.90 | 990.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]