X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0474203306000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0474203306000
 
| Well ID: 0474203306000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.09564000000000306, -112.87023199999998724 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.095640, -112.870232 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-33-047-20W4/0
 
| Location: 00/06-33-047-20W4/0
 +
|-
 +
| Location Alias: 00/06-33-47-20 W4M
 +
|-
 +
| Location Alias 2: 00/06-33-047-20 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 047
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 33
 +
|-
 +
| County/Municipality: [[Camrose County,_Alberta|Camrose County]]
 
|-
 
|-
 
| Well Name: GOLDEN SPIKE JOARCAM IN 6-33V-47-20
 
| Well Name: GOLDEN SPIKE JOARCAM IN 6-33V-47-20
 +
|-
 +
| Operator Name: [[Sevenway Capital Corporation]]
 +
|-
 +
| License Number: 0004233
 
|-
 
|-
 
| License Date: 1952-02-16
 
| License Date: 1952-02-16
 
|-
 
|-
| Final Drilling Date: 1952-03-01
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1952-02-21
 +
|-
 +
| Final Drill Date: 1952-03-01
 +
|-
 +
| Well Total Depth: 990.60 m
 +
|-
 +
| Surface Hole Latitude: 53.095640
 +
|-
 +
| Surface Hole Longitude: -112.870232
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1952-02-16
 +
| Obtained License
 +
|-
 +
| 1952-02-28
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-02-29
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-03-01
 +
| Finished Drilling
 +
|-
 +
| 1952-03-01
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1952-03-02
 +
| Production Casing Operation Performed
 +
|-
 +
| 1952-03-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1952-05-03
 +
| Well Began Production
 +
|-
 +
| 1952-05-03
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1952-05-03
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1960-11-25
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1963-11-27
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1963-11-27
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1963-12-10
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1963-12-19
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1963-12-19
 +
| Well Began Injection
 +
|-
 +
| 1963-12-19
 +
| Well Fluid changed to Water
 +
|-
 +
| 1963-12-19
 +
| Well Type changed to Injection
 +
|-
 +
| 1970-01-01
 +
| Well Fluid changed to Water
 +
|-
 +
| 1970-01-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1970-01-01
 +
| Well Type changed to Injection
 +
|-
 +
| 1971-06-02
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1971-06-02
 +
| Well Abandoned
 +
|-
 +
| 1971-06-02
 +
| Well Fluid changed to Water
 +
|-
 +
| 1971-06-02
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 1971-06-02
 +
| Well Type changed to Injection
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1952-03-31
 +
| Perforation
 +
| style="text-align: right;" | 974.10
 +
| style="text-align: right;" | 977.20
 +
| style="text-align: right;" | 20
 +
|-
 +
| 1960-11-25
 +
| Bullet Perforation
 +
| style="text-align: right;" | 969.60
 +
| style="text-align: right;" | 971.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1963-11-27
 +
| Cement Plug
 +
| style="text-align: right;" | 969.60
 +
| style="text-align: right;" | 977.20
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 990.6m
+
| 1963-11-27
 +
| Acid Wash
 +
| style="text-align: right;" | 969.60
 +
| style="text-align: right;" | 977.20
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Water
+
| 1963-12-10
 +
| Bullet Perforation
 +
| style="text-align: right;" | 975.40
 +
| style="text-align: right;" | 976.00
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Status: Abandoned
+
| 1963-12-10
 +
| Bullet Perforation
 +
| style="text-align: right;" | 976.00
 +
| style="text-align: right;" | 977.20
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Well Type: Injection
+
| 1963-12-10
 +
| Bullet Perforation
 +
| style="text-align: right;" | 977.20
 +
| style="text-align: right;" | 979.00
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Configuration: Vertical
+
| 1963-12-19
 +
| Acid Wash
 +
| style="text-align: right;" | 975.40
 +
| style="text-align: right;" | 979.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 53.09564000000000306
+
| 1971-06-02
 +
| Cement Plug
 +
| style="text-align: right;" | 960.10
 +
| style="text-align: right;" | 981.50
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| Longitude: -112.87023199999998724
+
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1961
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1962
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1966
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1967
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1968
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1969
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 11:43, 18 January 2021

Well Details

Well ID: 0474203306000
Loading map...
Location: 00/06-33-047-20W4/0
Location Alias: 00/06-33-47-20 W4M
Location Alias 2: 00/06-33-047-20 W4/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 4
Range: 20
Section: 33
County/Municipality: Camrose County
Well Name: GOLDEN SPIKE JOARCAM IN 6-33V-47-20
Operator Name: Sevenway Capital Corporation
License Number: 0004233
License Date: 1952-02-16
License Status: RecCertified
Spud Date: 1952-02-21
Final Drill Date: 1952-03-01
Well Total Depth: 990.60 m
Surface Hole Latitude: 53.095640
Surface Hole Longitude: -112.870232

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-02-16 Obtained License
1952-02-28 Drill Stem Test Performed
1952-02-29 Drill Stem Test Performed
1952-03-01 Finished Drilling
1952-03-01 Well Mode changed to Drilled and Cased
1952-03-02 Production Casing Operation Performed
1952-03-31 Perforation Treatment Performed - Jet Perforation
1952-05-03 Well Began Production
1952-05-03 Well Fluid changed to Crude Oil
1952-05-03 Well Mode changed to Pumping
1960-11-25 Perforation Treatment Performed - Bullet Perforation
1963-11-27 Perforation Treatment Performed - Acid Wash - No Pressure
1963-11-27 Perforation Treatment Performed - Cement Plug
1963-12-10 Perforation Treatment Performed - Bullet Perforation
1963-12-19 Perforation Treatment Performed - Acid Wash - No Pressure
1963-12-19 Well Began Injection
1963-12-19 Well Fluid changed to Water
1963-12-19 Well Type changed to Injection
1970-01-01 Well Fluid changed to Water
1970-01-01 Well Mode changed to Suspended
1970-01-01 Well Type changed to Injection
1971-06-02 Perforation Treatment Performed - Cement Plug
1971-06-02 Well Abandoned
1971-06-02 Well Fluid changed to Water
1971-06-02 Well Mode changed to Abandoned
1971-06-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-31 Perforation 974.10 977.20 20
1960-11-25 Bullet Perforation 969.60 971.40 13
1963-11-27 Cement Plug 969.60 977.20 0
1963-11-27 Acid Wash 969.60 977.20 0
1963-12-10 Bullet Perforation 975.40 976.00 7
1963-12-10 Bullet Perforation 976.00 977.20 13
1963-12-10 Bullet Perforation 977.20 979.00 7
1963-12-19 Acid Wash 975.40 979.00 0
1971-06-02 Cement Plug 960.10 981.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0

For data sources see[5]

References