X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0195020707000"

m
m
 
Line 203: Line 203:
 
| style="text-align: right;" | 2194.30
 
| style="text-align: right;" | 2194.30
 
| style="text-align: right;" | 2329.60
 
| style="text-align: right;" | 2329.60
| style="text-align: right;" | 0
 
|-
 
| 1941-05-22
 
| Acid Wash
 
| style="text-align: right;" | 2194.30
 
| style="text-align: right;" | 2329.60
 
| style="text-align: right;" | 0
 
|-
 
| 1941-05-28
 
| Acid Wash
 
| style="text-align: right;" | 2194.30
 
| style="text-align: right;" | 2329.60
 
| style="text-align: right;" | 0
 
|-
 
| 1941-05-30
 
| Acid Wash
 
| style="text-align: right;" | 2194.30
 
| style="text-align: right;" | 2329.60
 
| style="text-align: right;" | 0
 
|-
 
| 1999-02-26
 
| Acid Wash
 
| style="text-align: right;" | 2249.00
 
| style="text-align: right;" | 2279.00
 
| style="text-align: right;" | 0
 
|-
 
| 1999-02-26
 
| Acid Wash
 
| style="text-align: right;" | 2310.00
 
| style="text-align: right;" | 2323.00
 
| style="text-align: right;" | 0
 
|-
 
| 2003-09-21
 
| Chemical Squeeze
 
| style="text-align: right;" | 2308.00
 
| style="text-align: right;" | 2319.00
 
| style="text-align: right;" | 0
 
|-
 
| 2003-09-21
 
| Chemical Squeeze
 
| style="text-align: right;" | 2290.00
 
| style="text-align: right;" | 2301.00
 
| style="text-align: right;" | 0
 
|-
 
| 2003-09-22
 
| Chemical Squeeze
 
| style="text-align: right;" | 2265.00
 
| style="text-align: right;" | 2276.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 311: Line 263:
 
| style="text-align: right;" | 500.00
 
| style="text-align: right;" | 500.00
 
| style="text-align: right;" | 600.00
 
| style="text-align: right;" | 600.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1941-05-22
 +
| Acid Wash
 +
| style="text-align: right;" | 2194.30
 +
| style="text-align: right;" | 2329.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1941-05-28
 +
| Acid Wash
 +
| style="text-align: right;" | 2194.30
 +
| style="text-align: right;" | 2329.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1941-05-30
 +
| Acid Wash
 +
| style="text-align: right;" | 2194.30
 +
| style="text-align: right;" | 2329.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-02-26
 +
| Acid Wash
 +
| style="text-align: right;" | 2249.00
 +
| style="text-align: right;" | 2279.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-02-26
 +
| Acid Wash
 +
| style="text-align: right;" | 2310.00
 +
| style="text-align: right;" | 2323.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-09-21
 +
| Chemical Squeeze
 +
| style="text-align: right;" | 2308.00
 +
| style="text-align: right;" | 2319.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-09-21
 +
| Chemical Squeeze
 +
| style="text-align: right;" | 2290.00
 +
| style="text-align: right;" | 2301.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-09-22
 +
| Chemical Squeeze
 +
| style="text-align: right;" | 2265.00
 +
| style="text-align: right;" | 2276.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 489: Line 489:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:50, 18 January 2021

Well Details

Well ID: 0195020707000
Loading map...
Location: 00/07-07-019-02W5/0
Location Alias: 00/07-07-19-02 W5M
Location Alias 2: 00/07-07-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 07
County/Municipality: Foothills County
Well Name: CANERA ROYALITE 55 TV 7-7-19-2
Operator Name: Legacy Oil + Gas Inc.
License Number: B0000156
License Date: 1940-10-31
License Status: RecCertified
Spud Date: 1941-01-27
Final Drill Date: 1941-05-20
Well Total Depth: 2329.60 m
Surface Hole Latitude: 50.592081
Surface Hole Longitude: -114.263577

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1940-10-31 Obtained License
1941-05-06 Production Casing Operation Performed
1941-05-20 Finished Drilling
1941-05-20 Perforation Treatment Performed - Open-Hole Completion
1941-05-20 Well Mode changed to Drilled and Cased
1941-05-21 Well Began Production
1941-05-21 Well Fluid changed to Crude Oil
1941-05-21 Well Mode changed to Flowing
1941-05-22 Perforation Treatment Performed - Acid Wash - No Pressure
1941-05-28 Perforation Treatment Performed - Acid Wash - No Pressure
1941-05-30 Perforation Treatment Performed - Acid Wash - No Pressure
1999-02-26 Perforation Treatment Performed - Acid Wash - No Pressure
1999-10-12 Well Fluid changed to Crude Oil
1999-10-12 Well Mode changed to Pumping
2003-03-02 Well Log Performed
2003-09-21 Perforation Treatment Performed - Chemical Squeeze
2003-09-22 Perforation Treatment Performed - Chemical Squeeze
2003-09-23 Perforation Treatment Performed - Chemical Squeeze
2003-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-16 Plug Back Performed
2003-10-16 Well Fluid changed to Crude Oil
2003-10-16 Well Mode changed to Abandoned Zone
2003-10-17 Perforation Treatment Performed - Cement Plug
2003-10-17 Plug Back Performed
2003-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-18 Well Log Performed
2003-10-19 Well Log Performed
2003-10-20 Perforation Treatment Performed - Jet Perforation
2003-10-21 Perforation Treatment Performed - Cement Plug
2003-10-21 Perforation Treatment Performed - Remedial Casing
2003-10-21 Plug Back Performed
2004-01-13 Well Abandoned
2004-01-13 Well Fluid changed to Crude Oil
2004-01-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1941-05-20 Open Hole/Barefoot Completion 2194.30 2329.60 0
2003-09-22 Chemical Squeeze 2244.00 2255.00 0
2003-09-22 Chemical Squeeze 2198.00 2209.00 0
2003-09-23 Chemical Squeeze 2219.00 2230.00 0
2003-09-23 Chemical Squeeze 2200.00 2211.00 0
2003-10-16 Packing Device Capped w/Cement 2150.00 2185.00 0
2003-10-17 Cement Plug 916.00 1160.00 0
2003-10-18 Packing Device Capped w/Cement 600.00 830.00 0
2003-10-20 Perforation 579.00 580.00 14
2003-10-21 Remedial Casing Cementing 579.00 580.00 0
2003-10-21 Cement Plug 500.00 600.00 0
1941-05-22 Acid Wash 2194.30 2329.60 0
1941-05-28 Acid Wash 2194.30 2329.60 0
1941-05-30 Acid Wash 2194.30 2329.60 0
1999-02-26 Acid Wash 2249.00 2279.00 0
1999-02-26 Acid Wash 2310.00 2323.00 0
2003-09-21 Chemical Squeeze 2308.00 2319.00 0
2003-09-21 Chemical Squeeze 2290.00 2301.00 0
2003-09-22 Chemical Squeeze 2265.00 2276.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1972 44 0.0 0.0 0.0
1973 46 0.0 0.0 0.0
1974 70 0.0 0.0 0.0
1975 96 0.0 0.0 0.0
1977 168 0.0 0.0 0.0
1980 1165 0.0 0.0 0.0
1987 744 0.0 0.0 0.0
1988 1514 0.0 0.0 0.0
1991 793 0.0 0.0 0.0
1998 1205 0.0 0.0 0.0
1999 7274 0.0 0.0 0.0
2000 6821 0.0 0.0 0.0
2001 7024 0.0 0.0 0.0
2002 8444 0.0 0.0 0.0
2003 2500 0.0 0.0 0.0

For data sources see[5]

References