If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 312: | Line 312: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0475143403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.092359,"lon":-115.967385,"icon":""}]} |
Location: 00/03-34-047-14W5/0 | |
Location Alias: 00/03-34-47-14 W5M | |
Location Alias 2: 00/03-34-047-14 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 047 | |
Meridian: 5 | |
Range: 14 | |
Section: 34 | |
County/Municipality: Yellowhead County | |
Well Name: BOULDER BRAZR 3-34-47-14 | |
Operator Name: Boulder Energy Ltd. | |
License Number: 0198612 | |
License Date: 1997-02-25 | |
License Status: Suspension | |
Spud Date: 1997-06-16 | |
Final Drill Date: 1997-06-25 | |
Well Total Depth: 1959.00 m | |
Surface Hole Latitude: 53.092359 | |
Surface Hole Longitude: -115.967385 |
Date | Event |
---|---|
1997-02-25 | Obtained License |
1997-06-17 | Surface Casing Operation Performed |
1997-06-25 | Finished Drilling |
1997-06-25 | Well Mode changed to Drilled and Cased |
1997-06-27 | Well Log Performed |
1997-06-28 | Production Casing Operation Performed |
1997-06-29 | Rig Released |
1997-07-08 | Perforation Treatment Performed - Jet Perforation |
1997-07-08 | Well Log Performed |
1997-07-20 | Perforation Treatment Performed - Fractured |
1997-08-08 | Well Began Production |
1997-08-08 | Well Fluid changed to Crude Oil |
1997-08-08 | Well Mode changed to Pumping |
2004-04-15 | Well Log Performed |
2004-04-16 | Perforation Treatment Performed - Jet Perforation |
2004-07-11 | Well Log Performed |
2004-11-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-11-07 | Perforation Treatment Performed - Jet Perforation |
2004-11-07 | Plug Back Performed |
2004-11-07 | Well Fluid changed to Crude Oil |
2004-11-07 | Well Mode changed to Abandoned Zone |
2004-11-09 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-07-08 | Perforation | 1734.00 | 1744.00 | 17 |
1997-07-20 | Fracture | 1734.00 | 1744.00 | 0 |
2004-04-16 | Perforation | 1723.30 | 1727.70 | 17 |
2004-11-07 | Packing Device Capped w/Cement | 1722.30 | 1730.70 | 0 |
2004-11-07 | Packing Device Capped w/Cement | 1711.80 | 1720.20 | 0 |
2004-11-07 | Perforation | 1654.00 | 1659.00 | 17 |
2004-11-07 | Perforation | 1635.50 | 1638.50 | 17 |
2004-11-09 | Fracture | 1654.00 | 1659.00 | 0 |
2004-11-09 | Fracture | 1635.50 | 1638.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 2856 | 0.0 | 0.0 | 0.0 |
1998 | 8635 | 0.0 | 0.0 | 0.0 |
1999 | 8624 | 0.0 | 0.0 | 0.0 |
2000 | 6910 | 0.0 | 0.0 | 0.0 |
2001 | 2835 | 0.0 | 0.0 | 0.0 |
For data sources see[5]