If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 237: | Line 237: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0484012902030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.163211,"lon":-110.106587,"icon":""}]} |
Location: 03/02-29-048-01W4/0 | |
Location Alias: 03/02-29-48-01 W4M | |
Location Alias 2: 03/02-29-048-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 01 | |
Section: 29 | |
County/Municipality: County of Vermilion River | |
Well Name: CREW HZ 103 LLOYD 2-29-48-1 | |
Operator Name: Crew Energy Inc. | |
License Number: 0424613 | |
License Date: 2010-10-14 | |
License Status: Suspension | |
Spud Date: 2010-11-25 | |
Final Drill Date: 2010-12-01 | |
Well Total Depth: 1095.00 m | |
Surface Hole Latitude: 53.163211 | |
Surface Hole Longitude: -110.106587 |
Date | Event |
---|---|
2010-10-14 | Obtained License |
2010-11-27 | Surface Casing Operation Performed |
2010-11-28 | Direction Drilling Operation Performed - Horizontal |
2010-12-01 | Finished Drilling |
2010-12-01 | Well Log Performed |
2010-12-01 | Well Mode changed to Drilled and Cased |
2010-12-02 | Perforation Treatment Performed - Slotted Liner or Casing |
2010-12-02 | Production Casing Operation Performed |
2010-12-02 | Rig Released |
2010-12-24 | Well Began Production |
2010-12-24 | Well Fluid changed to Crude Oil |
2010-12-24 | Well Mode changed to Pumping |
2014-06-01 | Well Fluid changed to Crude Oil |
2014-06-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-28 | 367.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-02 | Slotted Liner | 716.80 | 1095.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 178 | 0.0 | 0.0 | 0.0 |
2011 | 8380 | 0.0 | 0.0 | 0.0 |
2012 | 2231 | 0.0 | 0.0 | 0.0 |
For data sources see[6]