X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0484012910030"

m
m
 
Line 247: Line 247:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:50, 18 January 2021

Well Details

Well ID: 0484012910030
Loading map...
Location: 03/10-29-048-01W4/0
Location Alias: 03/10-29-48-01 W4M
Location Alias 2: 03/10-29-048-01 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 01
Section: 29
County/Municipality: County of Vermilion River
Well Name: CREW HZ 103 LLOYD 10-29-48-1
Operator Name: Crew Energy Inc.
License Number: 0421111
License Date: 2010-06-11
License Status: Suspension
Spud Date: 2010-08-03
Final Drill Date: 2010-08-11
Well Total Depth: 1150.00 m
Surface Hole Latitude: 53.171722
Surface Hole Longitude: -110.124089

For data sources see[1][2]

Well History

Date Event
2010-06-11 Obtained License
2010-08-03 Surface Casing Operation Performed
2010-08-05 Direction Drilling Operation Performed - Horizontal
2010-08-08 Intermediate Casing Operation Performed
2010-08-10 Direction Drilling Operation Performed - Deviate
2010-08-11 Finished Drilling
2010-08-11 Well Mode changed to Drilled and Cased
2010-08-12 Liner Casing Operation Performed
2010-08-12 Perforation Treatment Performed - Slotted Liner or Casing
2010-08-12 Rig Released
2010-08-19 Well Log Performed
2010-09-12 Well Began Production
2010-09-12 Well Fluid changed to Crude Oil
2010-09-12 Well Mode changed to Flowing
2014-06-01 Well Fluid changed to Crude Oil
2014-06-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-05 359.00 Horizontal
2010-08-10 843.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-12 Slotted Liner 821.00 1150.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2650 0.0 0.0 0.0
2011 7757 0.0 0.0 0.0
2012 1575 0.0 0.0 0.0

For data sources see[6]

References