If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0394243510003 | | Well ID: 0394243510003 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 52.399565, -113.348410 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/10-35-039-24W4/3 | | Location: 00/10-35-039-24W4/3 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/10-35-039-24 W4/03 | | Location Alias 2: 00/10-35-039-24 W4/03 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 039 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 24 | ||
+ | |- | ||
+ | | Section: 35 | ||
|- | |- | ||
| County/Municipality: [[Lacombe County,_Alberta|Lacombe County]] | | County/Municipality: [[Lacombe County,_Alberta|Lacombe County]] | ||
Line 17: | Line 27: | ||
| Well Name: ENHANCEENERGY CLIVE 10-35-39-24 | | Well Name: ENHANCEENERGY CLIVE 10-35-39-24 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[Enhance Energy Inc.]] |
|- | |- | ||
| License Number: 0030078 | | License Number: 0030078 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 1966-03-14 | | Final Drill Date: 1966-03-14 | ||
|- | |- | ||
− | | Well Total Depth: 1897. | + | | Well Total Depth: 1897.40 m |
|- | |- | ||
| Surface Hole Latitude: 52.399565 | | Surface Hole Latitude: 52.399565 | ||
|- | |- | ||
− | | Surface Hole Longitude: -113. | + | | Surface Hole Longitude: -113.348410 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1966-02-22 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1966-03-14 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1966-03-14 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1966-03-15 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1966-03-16 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1966-03-17 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1988-08-09 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1988-08-10 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1988-08-10 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1995-09-11 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1995-09-13 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1995-09-19 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1995-09-20 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1995-09-21 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1995-09-22 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1997-11-22 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1997-11-23 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1997-11-27 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1997-11-27 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1997-11-30 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1997-12-01 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2002-08-20 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2002-08-23 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2002-09-13 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 2020-03-26 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2020-03-26 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 2020-04-02 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2020-04-03 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 183: | ||
| 1966-03-16 | | 1966-03-16 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1873 | + | | style="text-align: right;" | 1873.00 |
− | | style="text-align: right;" | 1873. | + | | style="text-align: right;" | 1873.90 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1995-09-21 | | 1995-09-21 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1830 | + | | style="text-align: right;" | 1830.00 |
− | | style="text-align: right;" | 1832 | + | | style="text-align: right;" | 1832.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 1995-09-22 | | 1995-09-22 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1830 | + | | style="text-align: right;" | 1830.00 |
− | | style="text-align: right;" | 1832 | + | | style="text-align: right;" | 1832.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1997-11-23 | | 1997-11-23 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1860 | + | | style="text-align: right;" | 1860.00 |
− | | style="text-align: right;" | 1862. | + | | style="text-align: right;" | 1862.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1997-11-27 | | 1997-11-27 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1819 | + | | style="text-align: right;" | 1819.00 |
− | | style="text-align: right;" | 1821 | + | | style="text-align: right;" | 1821.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 1997-11-30 | | 1997-11-30 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1825 | + | | style="text-align: right;" | 1825.00 |
− | | style="text-align: right;" | 1829 | + | | style="text-align: right;" | 1829.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 1997-12-01 | | 1997-12-01 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1819 | + | | style="text-align: right;" | 1819.00 |
− | | style="text-align: right;" | 1829 | + | | style="text-align: right;" | 1829.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2002-08-20 | | 2002-08-20 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1819 | + | | style="text-align: right;" | 1819.00 |
− | | style="text-align: right;" | 1821 | + | | style="text-align: right;" | 1821.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2002-08-20 | | 2002-08-20 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1825 | + | | style="text-align: right;" | 1825.00 |
− | | style="text-align: right;" | 1829 | + | | style="text-align: right;" | 1829.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2002-08-23 | | 2002-08-23 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1850 | + | | style="text-align: right;" | 1850.00 |
− | | style="text-align: right;" | 1853 | + | | style="text-align: right;" | 1853.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2002-08-23 | | 2002-08-23 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1854. | + | | style="text-align: right;" | 1854.40 |
− | | style="text-align: right;" | 1855. | + | | style="text-align: right;" | 1855.90 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 1966-03-16 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1835.50 | ||
+ | | style="text-align: right;" | 1836.40 | ||
+ | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 2002-08-23 | | 2002-08-23 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1859. | + | | style="text-align: right;" | 1859.90 |
− | | style="text-align: right;" | 1861. | + | | style="text-align: right;" | 1861.90 |
| style="text-align: right;" | 14 | | style="text-align: right;" | 14 | ||
|- | |- | ||
| 2002-09-13 | | 2002-09-13 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1850 | + | | style="text-align: right;" | 1850.00 |
− | | style="text-align: right;" | 1852 | + | | style="text-align: right;" | 1852.00 |
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2020-03-26 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1850.00 | ||
+ | | style="text-align: right;" | 1861.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2020-04-02 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1860.50 | ||
+ | | style="text-align: right;" | 1873.90 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2020-04-03 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1860.50 | ||
+ | | style="text-align: right;" | 1873.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1966-03-17 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1835.50 | ||
+ | | style="text-align: right;" | 1873.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1988-08-09 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1873.00 | ||
+ | | style="text-align: right;" | 1873.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1988-08-10 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1864.00 | ||
+ | | style="text-align: right;" | 1866.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1988-08-10 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1864.00 | ||
+ | | style="text-align: right;" | 1866.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1995-09-13 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1864.00 | ||
+ | | style="text-align: right;" | 1865.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1995-09-13 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1835.50 | ||
+ | | style="text-align: right;" | 1836.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1995-09-19 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1860.00 | ||
+ | | style="text-align: right;" | 1862.50 | ||
+ | | style="text-align: right;" | 17 | ||
|- | |- | ||
|} | |} | ||
Line 202: | Line 329: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | Start Date | + | !scope="col" | Job Number |
− | !scope="col" | End Date | + | !scope="col" | Job Start Date |
− | !scope="col" | | + | !scope="col" | Job End Date |
− | !scope="col" | + | !scope="col" | True Vertical Depth (ft) |
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 235: | Line 376: | ||
|}--> | |}--> | ||
− | + | == Occurences == | |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Occurence Date | !scope="col" | Occurence Date | ||
Line 242: | Line 383: | ||
!scope="col" style="text-align: right;" | Occurence Control Depth (m) | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
|- | |- | ||
− | |}--> | + | | 2020-04-05 |
− | + | | No Incident Encountered | |
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Occurence Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0394243510003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.399565,"lon":-113.34841,"icon":""}]} |
Location: 00/10-35-039-24W4/3 | |
Location Alias: 00/10-35-39-24 W4M | |
Location Alias 2: 00/10-35-039-24 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 35 | |
County/Municipality: Lacombe County | |
Well Name: ENHANCEENERGY CLIVE 10-35-39-24 | |
Operator Name: Enhance Energy Inc. | |
License Number: 0030078 | |
License Date: 1966-02-22 | |
License Status: Issued | |
Spud Date: 1966-03-06 | |
Final Drill Date: 1966-03-14 | |
Well Total Depth: 1897.40 m | |
Surface Hole Latitude: 52.399565 | |
Surface Hole Longitude: -113.348410 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-02-22 | Obtained License |
1966-03-14 | Finished Drilling |
1966-03-14 | Well Mode changed to Drilled and Cased |
1966-03-15 | Production Casing Operation Performed |
1966-03-16 | Perforation Treatment Performed - Jet Perforation |
1966-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-09 | Perforation Treatment Performed - Cement Squeeze |
1988-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-10 | Perforation Treatment Performed - Jet Perforation |
1995-09-11 | Well Log Performed |
1995-09-13 | Perforation Treatment Performed - Cement Squeeze |
1995-09-19 | Perforation Treatment Performed - Jet Perforation |
1995-09-20 | Well Log Performed |
1995-09-21 | Perforation Treatment Performed - Jet Perforation |
1995-09-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-11-22 | Well Log Performed |
1997-11-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-11-27 | Perforation Treatment Performed - Jet Perforation |
1997-11-27 | Well Log Performed |
1997-11-30 | Perforation Treatment Performed - Jet Perforation |
1997-12-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-08-20 | Perforation Treatment Performed - Cement Squeeze |
2002-08-23 | Perforation Treatment Performed - Jet Perforation |
2002-09-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2020-03-26 | Perforation Treatment Performed - Cement Squeeze |
2020-03-26 | Plug Back Performed |
2020-04-02 | Perforation Treatment Performed - Jet Perforation |
2020-04-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-03-16 | Perforation | 1873.00 | 1873.90 | 7 |
1995-09-21 | Perforation | 1830.00 | 1832.00 | 17 |
1995-09-22 | Acid Treatment | 1830.00 | 1832.00 | 0 |
1997-11-23 | Acid Treatment | 1860.00 | 1862.50 | 0 |
1997-11-27 | Perforation | 1819.00 | 1821.00 | 17 |
1997-11-30 | Perforation | 1825.00 | 1829.00 | 17 |
1997-12-01 | Acid Treatment | 1819.00 | 1829.00 | 0 |
2002-08-20 | Cement Squeeze | 1819.00 | 1821.00 | 0 |
2002-08-20 | Cement Squeeze | 1825.00 | 1829.00 | 0 |
2002-08-23 | Perforation | 1850.00 | 1853.00 | 17 |
2002-08-23 | Perforation | 1854.40 | 1855.90 | 17 |
1966-03-16 | Perforation | 1835.50 | 1836.40 | 7 |
2002-08-23 | Perforation | 1859.90 | 1861.90 | 14 |
2002-09-13 | Acid Treatment | 1850.00 | 1852.00 | 0 |
2020-03-26 | Cement Squeeze | 1850.00 | 1861.90 | 0 |
2020-04-02 | Perforation | 1860.50 | 1873.90 | 17 |
2020-04-03 | Acid Treatment | 1860.50 | 1873.90 | 0 |
1966-03-17 | Acid Treatment | 1835.50 | 1873.90 | 0 |
1988-08-09 | Cement Squeeze | 1873.00 | 1873.90 | 0 |
1988-08-10 | Perforation | 1864.00 | 1866.50 | 13 |
1988-08-10 | Acid Treatment | 1864.00 | 1866.50 | 0 |
1995-09-13 | Cement Squeeze | 1864.00 | 1865.50 | 0 |
1995-09-13 | Cement Squeeze | 1835.50 | 1836.00 | 0 |
1995-09-19 | Perforation | 1860.00 | 1862.50 | 17 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-04-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]