If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0786110914020 | | Well ID: 0786110914020 | ||
− | | style="height=100%; align=center" rowspan="21" | {{#display_map: 55.738828, -119. | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 55.738828, -119.631000 | width=100% | height=100% }} |
|- | |- | ||
| Location: 02/14-09-078-11W6/0 | | Location: 02/14-09-078-11W6/0 | ||
Line 43: | Line 43: | ||
| Surface Hole Latitude: 55.738828 | | Surface Hole Latitude: 55.738828 | ||
|- | |- | ||
− | | Surface Hole Longitude: -119. | + | | Surface Hole Longitude: -119.631000 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
Line 176: | Line 176: | ||
| style="text-align: right;" | 4280.00 | | style="text-align: right;" | 4280.00 | ||
| style="text-align: right;" | 4284.00 | | style="text-align: right;" | 4284.00 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 284: | Line 236: | ||
| style="text-align: right;" | 2998.90 | | style="text-align: right;" | 2998.90 | ||
| style="text-align: right;" | 2999.80 | | style="text-align: right;" | 2999.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014-07-04 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 4270.50 | ||
+ | | style="text-align: right;" | 4271.80 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 332: | Line 290: | ||
| style="text-align: right;" | 2392.70 | | style="text-align: right;" | 2392.70 | ||
| style="text-align: right;" | 2393.50 | | style="text-align: right;" | 2393.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014-07-04 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 4187.50 | ||
+ | | style="text-align: right;" | 4188.10 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014-07-04 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 4106.70 | ||
+ | | style="text-align: right;" | 4107.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014-07-04 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 4026.00 | ||
+ | | style="text-align: right;" | 4026.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014-07-04 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3945.10 | ||
+ | | style="text-align: right;" | 3946.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014-07-05 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3865.20 | ||
+ | | style="text-align: right;" | 3866.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014-07-05 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3771.60 | ||
+ | | style="text-align: right;" | 3772.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2014-07-05 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3690.70 | ||
+ | | style="text-align: right;" | 3691.50 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 616: | Line 616: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
[[Category:FracFocus]] | [[Category:FracFocus]] |
Well ID: 0786110914020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.738828,"lon":-119.631,"icon":""}]} |
Location: 02/14-09-078-11W6/0 | |
Location Alias: 02/14-09-78-11 W6M | |
Location Alias 2: 02/14-09-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 09 | |
County/Municipality: Saddle Hills County | |
Well Name: KELT EXP HZ PCOUPES 14-9-78-11 | |
Operator Name: Kelt Exploration Ltd. | |
License Number: 0465217 | |
License Date: 2014-02-20 | |
License Status: Issued | |
Spud Date: 2014-03-15 | |
Final Drill Date: 2014-04-12 | |
Well Total Depth: 4284.00 m | |
Surface Hole Latitude: 55.738828 | |
Surface Hole Longitude: -119.631000 |
Date | Event |
---|---|
2014-02-20 | Obtained License |
2014-03-18 | Surface Casing Operation Performed |
2014-03-22 | Direction Drilling Operation Performed - Deviate |
2014-03-30 | Direction Drilling Operation Performed - Horizontal |
2014-04-12 | Finished Drilling |
2014-04-12 | Well Log Performed |
2014-04-12 | Well Mode changed to Drilled and Cased |
2014-04-15 | Perforation Treatment Performed - Open-Hole Completion |
2014-04-15 | Production Casing Operation Performed |
2014-04-15 | Rig Released |
2014-07-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-08 | Well Began Production |
2014-07-08 | Well Fluid changed to Crude Oil |
2014-07-08 | Well Mode changed to Flowing |
2017-06-04 | Well Fluid changed to Crude Oil |
2017-06-04 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-03-15 | Precision Drilling Corporation | 322 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-03-22 | 1921.80 | Deviate (5 - 79 degrees) |
2014-03-30 | 2319.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-04-15 | Open Hole/Barefoot Completion | 4280.00 | 4284.00 | 0 |
2014-07-05 | Multi-Stage Fracture | 3609.80 | 3610.60 | 0 |
2014-07-05 | Multi-Stage Fracture | 3516.80 | 3517.60 | 0 |
2014-07-05 | Multi-Stage Fracture | 3461.50 | 3462.30 | 0 |
2014-07-05 | Multi-Stage Fracture | 3405.90 | 3406.80 | 0 |
2014-07-05 | Multi-Stage Fracture | 3350.50 | 3351.40 | 0 |
2014-07-05 | Multi-Stage Fracture | 3296.30 | 3297.10 | 0 |
2014-07-05 | Multi-Stage Fracture | 3241.20 | 3242.00 | 0 |
2014-07-05 | Multi-Stage Fracture | 3160.30 | 3161.10 | 0 |
2014-07-06 | Multi-Stage Fracture | 3079.80 | 3080.70 | 0 |
2014-07-06 | Multi-Stage Fracture | 2998.90 | 2999.80 | 0 |
2014-07-04 | Multi-Stage Fracture | 4270.50 | 4271.80 | 0 |
2014-07-06 | Multi-Stage Fracture | 2919.20 | 2920.10 | 0 |
2014-07-06 | Multi-Stage Fracture | 2825.70 | 2826.50 | 0 |
2014-07-06 | Multi-Stage Fracture | 2744.70 | 2745.60 | 0 |
2014-07-06 | Multi-Stage Fracture | 2664.00 | 2664.80 | 0 |
2014-07-06 | Multi-Stage Fracture | 2583.60 | 2584.40 | 0 |
2014-07-06 | Multi-Stage Fracture | 2503.50 | 2504.30 | 0 |
2014-07-06 | Multi-Stage Fracture | 2448.20 | 2449.10 | 0 |
2014-07-06 | Multi-Stage Fracture | 2392.70 | 2393.50 | 0 |
2014-07-04 | Multi-Stage Fracture | 4187.50 | 4188.10 | 0 |
2014-07-04 | Multi-Stage Fracture | 4106.70 | 4107.50 | 0 |
2014-07-04 | Multi-Stage Fracture | 4026.00 | 4026.90 | 0 |
2014-07-04 | Multi-Stage Fracture | 3945.10 | 3946.00 | 0 |
2014-07-05 | Multi-Stage Fracture | 3865.20 | 3866.00 | 0 |
2014-07-05 | Multi-Stage Fracture | 3771.60 | 3772.50 | 0 |
2014-07-05 | Multi-Stage Fracture | 3690.70 | 3691.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-07-04 | 2014-07-06 | 2,198 | 8,446 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 87.1026 | N/A | |||
Prime Plus (30/50) | Canyon | No specific ingredients | Not Available | 100 | 1.7138 | N/A | ||
Sand (30/50) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 7.5396 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 7.5396 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 7.5396 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 7.5395 | N/A | ||||
Sand (40/70) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 3.4739 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 3.4739 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 3.4739 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 3.4738 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0128 | N/A | |
Water | 7732-18-5 | 100 | 0.0128 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0588 | N/A | |
CAN-2411 Non-emulsifier | Canyon | Demulsifier | Ethylene glycol | 107-21-1 | 100 | 0.0477 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0477 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0477 | N/A | ||||
CAN-2057 Friction Reducer | Canyon | Friction Reducer | No hazardous ingredients | Not Available | 100 | 0.0504 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-07-04 | 2014-07-06 | Surface Water - Runoff | 8446 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 3725 | 0.0 | 0.0 | 0.0 |
2015 | 8021 | 0.0 | 0.0 | 0.0 |
2016 | 8548 | 0.0 | 0.0 | 0.0 |
2017 | 5168 | 0.0 | 0.0 | 0.0 |
2018 | 2773 | 0.0 | 0.0 | 0.0 |
2019 | 8122 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-04-15 | No Incident Encountered | 0.00 | 0.00 |
2014-07-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]