X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0484080710D00"

m
m
 
Line 313: Line 313:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:52, 18 January 2021

Well Details

Well ID: 0484080710D00
Loading map...
Location: D0/10-07-048-08W4/0
Location Alias: D0/10-07-48-08 W4M
Location Alias 2: D0/10-07-048-08 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 08
Section: 07
County/Municipality: County of Minburn No. 27
Well Name: HARVEST 10D VIK-KINS 10-7-48-8
Operator Name: Cardinal Energy Ltd.
License Number: 0052867
License Date: 1975-02-12
License Status: Suspension
Spud Date: 1975-02-21
Final Drill Date: 1975-02-25
Well Total Depth: 751.00 m
Surface Hole Latitude: 53.127124
Surface Hole Longitude: -111.159195

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-12 Obtained License
1975-02-25 Finished Drilling
1975-02-26 Drill Stem Test Performed
1975-02-27 Drill Stem Test Performed
1975-02-27 Production Casing Operation Performed
1975-08-19 Well Log Performed
1975-12-13 Perforation Treatment Performed - Fractured
1975-12-13 Perforation Treatment Performed - Jet Perforation
1976-03-01 Well Mode changed to Drilled and Cased
1997-10-28 Well Fluid changed to Crude Oil
1997-10-28 Well Mode changed to Potential
1997-10-29 Well Fluid changed to Crude Oil
1997-10-29 Well Mode changed to Abandoned Zone
1997-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-30 Plug Back Performed
1997-11-05 Well Log Performed
1998-01-06 Perforation Treatment Performed - Jet Perforation
1998-01-06 Well Log Performed
1998-01-21 Well Log Performed
1998-01-25 Perforation Treatment Performed - Cement Plug
1998-01-25 Perforation Treatment Performed - Remedial Casing
1998-02-02 Perforation Treatment Performed - Jet Perforation
1998-02-02 Well Log Performed
1998-02-05 Well Log Performed
1998-02-07 Perforation Treatment Performed - Cement Plug
1998-02-07 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-13 Perforation 693.70 694.90 7
1975-12-13 Fracture 693.70 694.90 0
1997-10-30 Packing Device Capped w/Cement 671.00 679.00 0
1998-01-06 Perforation 578.00 579.00 20
1998-01-25 Remedial Casing Cementing 578.00 579.00 0
1998-01-25 Cement Plug 562.00 577.00 0
1998-02-02 Perforation 448.00 450.00 13
1998-02-07 Remedial Casing Cementing 448.00 450.00 0
1998-02-07 Cement Plug 436.00 447.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-02-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References