If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0656100202000 | | Well ID: 0656100202000 | ||
| − | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 54.596244, -119.412253 | width=100% | height=100% }} |
|- | |- | ||
| − | | | + | | Location: 00/02-02-065-10W6/0 |
|- | |- | ||
| − | | Operator: | + | | Location Alias: 00/02-02-65-10 W6M |
| + | |- | ||
| + | | Location Alias 2: 00/02-02-065-10 W6/00 | ||
| + | |- | ||
| + | | Country: Canada | ||
| + | |- | ||
| + | | Province: Alberta | ||
| + | |- | ||
| + | | Township: 065 | ||
| + | |- | ||
| + | | Meridian: 6 | ||
| + | |- | ||
| + | | Range: 10 | ||
| + | |- | ||
| + | | Section: 02 | ||
| + | |- | ||
| + | | County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]] | ||
| + | |- | ||
| + | | Well Name: CNRL REDROCK 2-2-65-10 | ||
| + | |- | ||
| + | | Operator Name: [[Canadian Natural Resources Limited]] | ||
| + | |- | ||
| + | | License Number: 0446630 | ||
|- | |- | ||
| License Date: 2012-06-19 | | License Date: 2012-06-19 | ||
|- | |- | ||
| − | | | + | | License Status: Issued |
|- | |- | ||
| − | | | + | | Spud Date: 2012-08-17 |
|- | |- | ||
| − | | | + | | Final Drill Date: 2012-09-05 |
|- | |- | ||
| − | | | + | | Well Total Depth: 2770.00 m |
|- | |- | ||
| − | | | + | | Surface Hole Latitude: 54.596244 |
|- | |- | ||
| − | | | + | | Surface Hole Longitude: -119.412253 |
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File - Licensing Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
| + | | title = General Well Data File - Drilling Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | == Well History == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Date | ||
| + | !scope="col" | Event | ||
|- | |- | ||
| − | | | + | | 2012-06-19 |
| + | | Obtained License | ||
|- | |- | ||
| − | | | + | | 2012-08-17 |
| + | | Lost Circulation Occurred | ||
|- | |- | ||
| − | | | + | | 2012-08-22 |
| + | | Surface Casing Operation Performed | ||
| + | |- | ||
| + | | 2012-08-25 | ||
| + | | Well Log Performed | ||
| + | |- | ||
| + | | 2012-08-26 | ||
| + | | Direction Drilling Operation Performed - Deviate | ||
| + | |- | ||
| + | | 2012-08-31 | ||
| + | | Direction Drilling Operation Performed - Horizontal | ||
| + | |- | ||
| + | | 2012-08-31 | ||
| + | | Well Log Performed | ||
| + | |- | ||
| + | | 2012-09-05 | ||
| + | | Finished Drilling | ||
| + | |- | ||
| + | | 2012-09-05 | ||
| + | | Well Log Performed | ||
| + | |- | ||
| + | | 2012-09-05 | ||
| + | | Well Mode changed to Drilled and Cased | ||
| + | |- | ||
| + | | 2012-09-07 | ||
| + | | Production Casing Operation Performed | ||
| + | |- | ||
| + | | 2012-09-08 | ||
| + | | Perforation Treatment Performed - Open-Hole Completion | ||
| + | |- | ||
| + | | 2012-09-08 | ||
| + | | Rig Released | ||
| + | |- | ||
| + | | 2012-09-16 | ||
| + | | Well Log Performed | ||
| + | |- | ||
| + | | 2012-09-22 | ||
| + | | Perforation Treatment Performed - Multi-Stage Fracture | ||
| + | |- | ||
| + | | 2012-09-23 | ||
| + | | Perforation Treatment Performed - Multi-Stage Fracture | ||
| + | |- | ||
| + | | 2012-09-27 | ||
| + | | Well Fluid changed to Gas | ||
| + | |- | ||
| + | | 2012-09-27 | ||
| + | | Well Mode changed to Testing | ||
| + | |- | ||
| + | | 2012-10-26 | ||
| + | | Well Began Production | ||
| + | |- | ||
| + | | 2012-10-26 | ||
| + | | Well Fluid changed to Gas | ||
| + | |- | ||
| + | | 2012-10-26 | ||
| + | | Well Mode changed to Flowing | ||
| + | |- | ||
| + | | 2016-02-01 | ||
| + | | Well Fluid changed to Gas | ||
| + | |- | ||
| + | | 2016-02-01 | ||
| + | | Well Mode changed to Pumping | ||
|- | |- | ||
|} | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-04-29 }}</ref> | ||
| + | == Spud Table == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Spud Date | ||
| + | !scope="col" | Contractor | ||
| + | !scope="col" style="text-align: right;" | Rig Number | ||
| + | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
| + | !scope="col" | Activity Type | ||
| + | |- | ||
| + | | 2012-08-17 | ||
| + | | [[Precision Drilling Corporation]] | ||
| + | | style="text-align: right;" | 151 | ||
| + | | style="text-align: right;" | N/A | ||
| + | | Drill To LD | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title =ST49: Daily Spud and Drilling Activity List | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-30 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-09 }}</ref> | ||
| + | == Directional Drilling == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Start Date | ||
| + | !scope="col" style="text-align: right;" | Depth (m) | ||
| + | !scope="col" | Reason | ||
| + | |- | ||
| + | | 2012-08-26 | ||
| + | | style="text-align: right;" | 1273.00 | ||
| + | | Deviate (5 - 79 degrees) | ||
| + | |- | ||
| + | | 2012-08-31 | ||
| + | | style="text-align: right;" | 1603.30 | ||
| + | | Horizontal | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File - Tour-Direction Drilling Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | == Perforation Treatments == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Perforation Date | ||
| + | !scope="col" | Perforation Type | ||
| + | !scope="col" style="text-align: right;" | Interval Top (m) | ||
| + | !scope="col" style="text-align: right;" | Interval Base (m) | ||
| + | !scope="col" style="text-align: right;" | Number of Shots | ||
| + | |- | ||
| + | | 2012-09-08 | ||
| + | | Open Hole/Barefoot Completion | ||
| + | | style="text-align: right;" | 2760.00 | ||
| + | | style="text-align: right;" | 2770.00 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-23 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1895.80 | ||
| + | | style="text-align: right;" | 1895.90 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-23 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1814.80 | ||
| + | | style="text-align: right;" | 1814.90 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-23 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1648.10 | ||
| + | | style="text-align: right;" | 1648.20 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-22 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2737.10 | ||
| + | | style="text-align: right;" | 2737.20 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-22 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2653.20 | ||
| + | | style="text-align: right;" | 2653.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-22 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2583.80 | ||
| + | | style="text-align: right;" | 2583.90 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-22 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2462.70 | ||
| + | | style="text-align: right;" | 2462.80 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-22 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2367.40 | ||
| + | | style="text-align: right;" | 2368.50 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-22 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2272.20 | ||
| + | | style="text-align: right;" | 2272.30 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-22 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 2060.50 | ||
| + | | style="text-align: right;" | 2060.60 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | | 2012-09-23 | ||
| + | | Multi-Stage Fracture | ||
| + | | style="text-align: right;" | 1965.30 | ||
| + | | style="text-align: right;" | 1965.40 | ||
| + | | style="text-align: right;" | 0 | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | <!--== Fracking Activities == | ||
| + | ==== Fracking Jobs ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Job Number | ||
| + | !scope="col" | Job Start Date | ||
| + | !scope="col" | Job End Date | ||
| + | !scope="col" | True Vertical Depth (ft) | ||
| + | !scope="col" | Total Water Volume (gal) | ||
| + | !scope="col" | Total Non-Water Volume (gal) | ||
| + | |- | ||
| + | |}--> | ||
| + | <!--==== Fluid Composition Data ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Job Number | ||
| + | !scope="col" | Trade Name | ||
| + | !scope="col" | Supplier | ||
| + | !scope="col" | Purpose | ||
| + | !scope="col" | Ingredient Name | ||
| + | !scope="col" | CAS Number | ||
| + | !scope="col" | Additive Percentage by Mass | ||
| + | !scope="col" | Job Percentage by Mass | ||
| + | !scope="col" | Mass Used (lb) | ||
| + | |- | ||
| + | |}--> | ||
| + | |||
| + | <!--== Water Sources == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Water Diversion Start Date | ||
| + | !scope="col" | Water Diversion End Date | ||
| + | !scope="col" | Water Source Type | ||
| + | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
| + | |- | ||
| + | |}--> | ||
| + | |||
| + | == Production Data == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Period | ||
| + | !scope="col" style="text-align: right;" | Total Production Hours | ||
| + | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
| + | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
| + | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
| + | |- | ||
| + | | 2012 | ||
| + | | style="text-align: right;" | 1782 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2013 | ||
| + | | style="text-align: right;" | 7527 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2014 | ||
| + | | style="text-align: right;" | 7895 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2015 | ||
| + | | style="text-align: right;" | 8759 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2016 | ||
| + | | style="text-align: right;" | 8783 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2017 | ||
| + | | style="text-align: right;" | 8759 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2018 | ||
| + | | style="text-align: right;" | 8759 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2019 | ||
| + | | style="text-align: right;" | 8759 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | | 2020 | ||
| + | | style="text-align: right;" | 2183 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | | style="text-align: right;" | 0.0 | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Well Production Data - All Alberta | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-25 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
| + | == Occurences == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Occurence Date | ||
| + | !scope="col" | Occurence Type | ||
| + | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
| + | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
| + | |- | ||
| + | | 2012-08-17 | ||
| + | | Lost Circulation | ||
| + | | style="text-align: right;" | 31.00 | ||
| + | | style="text-align: right;" | 632.00 | ||
| + | |- | ||
| + | | 2012-10-05 | ||
| + | | No Incident Encountered | ||
| + | | style="text-align: right;" | 0.00 | ||
| + | | style="text-align: right;" | 0.00 | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = General Well Data File - Tour-Occurence Data | ||
| + | |publisher = [[Alberta Energy Regulator]] | ||
| + | | date = 2020-04-22 | ||
| + | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-05-07 }}</ref> | ||
==References== | ==References== | ||
| − | + | <references/> | |
| − | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
| − | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
| Well ID: 0656100202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.596244,"lon":-119.412253,"icon":""}]} |
| Location: 00/02-02-065-10W6/0 | |
| Location Alias: 00/02-02-65-10 W6M | |
| Location Alias 2: 00/02-02-065-10 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 065 | |
| Meridian: 6 | |
| Range: 10 | |
| Section: 02 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: CNRL REDROCK 2-2-65-10 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0446630 | |
| License Date: 2012-06-19 | |
| License Status: Issued | |
| Spud Date: 2012-08-17 | |
| Final Drill Date: 2012-09-05 | |
| Well Total Depth: 2770.00 m | |
| Surface Hole Latitude: 54.596244 | |
| Surface Hole Longitude: -119.412253 |
| Date | Event |
|---|---|
| 2012-06-19 | Obtained License |
| 2012-08-17 | Lost Circulation Occurred |
| 2012-08-22 | Surface Casing Operation Performed |
| 2012-08-25 | Well Log Performed |
| 2012-08-26 | Direction Drilling Operation Performed - Deviate |
| 2012-08-31 | Direction Drilling Operation Performed - Horizontal |
| 2012-08-31 | Well Log Performed |
| 2012-09-05 | Finished Drilling |
| 2012-09-05 | Well Log Performed |
| 2012-09-05 | Well Mode changed to Drilled and Cased |
| 2012-09-07 | Production Casing Operation Performed |
| 2012-09-08 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-09-08 | Rig Released |
| 2012-09-16 | Well Log Performed |
| 2012-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-27 | Well Fluid changed to Gas |
| 2012-09-27 | Well Mode changed to Testing |
| 2012-10-26 | Well Began Production |
| 2012-10-26 | Well Fluid changed to Gas |
| 2012-10-26 | Well Mode changed to Flowing |
| 2016-02-01 | Well Fluid changed to Gas |
| 2016-02-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-17 | Precision Drilling Corporation | 151 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-26 | 1273.00 | Deviate (5 - 79 degrees) |
| 2012-08-31 | 1603.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-09-08 | Open Hole/Barefoot Completion | 2760.00 | 2770.00 | 0 |
| 2012-09-23 | Multi-Stage Fracture | 1895.80 | 1895.90 | 0 |
| 2012-09-23 | Multi-Stage Fracture | 1814.80 | 1814.90 | 0 |
| 2012-09-23 | Multi-Stage Fracture | 1648.10 | 1648.20 | 0 |
| 2012-09-22 | Multi-Stage Fracture | 2737.10 | 2737.20 | 0 |
| 2012-09-22 | Multi-Stage Fracture | 2653.20 | 2653.30 | 0 |
| 2012-09-22 | Multi-Stage Fracture | 2583.80 | 2583.90 | 0 |
| 2012-09-22 | Multi-Stage Fracture | 2462.70 | 2462.80 | 0 |
| 2012-09-22 | Multi-Stage Fracture | 2367.40 | 2368.50 | 0 |
| 2012-09-22 | Multi-Stage Fracture | 2272.20 | 2272.30 | 0 |
| 2012-09-22 | Multi-Stage Fracture | 2060.50 | 2060.60 | 0 |
| 2012-09-23 | Multi-Stage Fracture | 1965.30 | 1965.40 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1782 | 0.0 | 0.0 | 0.0 |
| 2013 | 7527 | 0.0 | 0.0 | 0.0 |
| 2014 | 7895 | 0.0 | 0.0 | 0.0 |
| 2015 | 8759 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-17 | Lost Circulation | 31.00 | 632.00 |
| 2012-10-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]