X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0664222204004"

m
m
 
Line 212: Line 212:
 
| style="text-align: right;" | 614.00
 
| style="text-align: right;" | 614.00
 
| style="text-align: right;" | 630.00
 
| style="text-align: right;" | 630.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-06-16
 +
| Perforation
 +
| style="text-align: right;" | 461.50
 +
| style="text-align: right;" | 462.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-06-17
 +
| Perforation
 +
| style="text-align: right;" | 448.00
 +
| style="text-align: right;" | 450.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2002-06-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 450.00
 +
| style="text-align: right;" | 458.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-06-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 433.00
 +
| style="text-align: right;" | 441.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 260: Line 284:
 
| style="text-align: right;" | 474.00
 
| style="text-align: right;" | 474.00
 
| style="text-align: right;" | 482.00
 
| style="text-align: right;" | 482.00
| style="text-align: right;" | 0
 
|-
 
| 2001-06-16
 
| Perforation
 
| style="text-align: right;" | 461.50
 
| style="text-align: right;" | 462.50
 
| style="text-align: right;" | 17
 
|-
 
| 2001-06-17
 
| Perforation
 
| style="text-align: right;" | 448.00
 
| style="text-align: right;" | 450.50
 
| style="text-align: right;" | 17
 
|-
 
| 2002-06-13
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 450.00
 
| style="text-align: right;" | 458.00
 
| style="text-align: right;" | 0
 
|-
 
| 2002-06-13
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 433.00
 
| style="text-align: right;" | 441.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 360: Line 360:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 23:39, 18 January 2021

Well Details

Well ID: 0664222204004
Loading map...
Location: 00/04-22-066-22W4/4
Location Alias: 00/04-22-66-22 W4M
Location Alias 2: 00/04-22-066-22 W4/04
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 22
Section: 22
County/Municipality: Athabasca
Well Name: CNRES ATHABASCA EAST 4-22-66-22
Operator Name: Canadian Natural Resources Limited
License Number: 0217970
License Date: 1998-10-06
License Status: RecCertified
Spud Date: 1998-11-02
Final Drill Date: 1998-11-04
Well Total Depth: 630.00 m
Surface Hole Latitude: 54.720778
Surface Hole Longitude: -113.253518

For data sources see[1][2]

Well History

Date Event
1998-10-06 Obtained License
1998-11-03 Direction Drilling Operation Performed - Deviate
1998-11-03 Surface Casing Operation Performed
1998-11-04 Finished Drilling
1998-11-04 Well Log Performed
1998-11-04 Well Mode changed to Drilled and Cased
1998-11-05 Production Casing Operation Performed
1998-11-05 Rig Released
1998-11-09 Well Log Performed
1998-11-10 Perforation Treatment Performed - Open-Hole Completion
1998-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-11 Well Log Performed
1998-11-12 Perforation Treatment Performed - Jet Perforation
1998-11-12 Well Log Performed
1998-12-02 Well Log Performed
2000-11-27 Well Log Performed
2000-11-28 Perforation Treatment Performed - Jet Perforation
2000-11-28 Well Log Performed
2000-11-29 Perforation Treatment Performed - Jet Perforation
2000-11-29 Well Log Performed
2001-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-15 Plug Back Performed
2001-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-16 Perforation Treatment Performed - Jet Perforation
2001-06-16 Plug Back Performed
2001-06-16 Well Log Performed
2001-06-17 Perforation Treatment Performed - Jet Perforation
2001-06-17 Well Log Performed
2002-06-12 Well Fluid changed to Gas
2002-06-12 Well Mode changed to Testing
2002-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-13 Plug Back Performed
2002-06-13 Well Fluid changed to Gas
2002-06-13 Well Mode changed to Abandoned Zone
2002-06-14 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-11-03 363.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-11-10 Open Hole/Barefoot Completion 614.00 630.00 0
2001-06-16 Perforation 461.50 462.50 17
2001-06-17 Perforation 448.00 450.50 17
2002-06-13 Packing Device Capped w/Cement 450.00 458.00 0
2002-06-13 Packing Device Capped w/Cement 433.00 441.00 0
1998-11-11 Packing Device Capped w/Cement 604.00 612.00 0
1998-11-12 Perforation 517.00 518.00 20
2000-11-28 Perforation 497.00 498.00 17
2000-11-28 Perforation 511.00 512.00 17
2000-11-29 Perforation 485.00 486.00 17
2001-06-15 Packing Device Capped w/Cement 508.50 516.50 0
2001-06-15 Packing Device Capped w/Cement 485.00 493.00 0
2001-06-16 Packing Device Capped w/Cement 474.00 482.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1 0.0 0.0 0.0

For data sources see[6]

References