X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0806113506002"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0806113506002
 
| Well ID: 0806113506002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.975449, -119.60754 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.975449, -119.607540 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-35-080-11W6/2
 
| Location: 00/06-35-080-11W6/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/06-35-080-11 W6/02
 
| Location Alias 2: 00/06-35-080-11 W6/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 080
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 11
 +
|-
 +
| Section: 35
 
|-
 
|-
 
| County/Municipality: [[Saddle Hills County,_Alberta|Saddle Hills County]]
 
| County/Municipality: [[Saddle Hills County,_Alberta|Saddle Hills County]]
Line 17: Line 27:
 
| Well Name: RELENTLESS FARMTON 6-35-80-11
 
| Well Name: RELENTLESS FARMTON 6-35-80-11
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Cequence Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0144346
 
| License Number: 0144346
Line 29: Line 39:
 
| Final Drill Date: 1990-07-11
 
| Final Drill Date: 1990-07-11
 
|-
 
|-
| Well Total Depth: 2501 m
+
| Well Total Depth: 2501.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 55.975449
 
| Surface Hole Latitude: 55.975449
 
|-
 
|-
| Surface Hole Longitude: -119.60754
+
| Surface Hole Longitude: -119.607540
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1990-06-04
 +
| Obtained License
 +
|-
 +
| 1990-06-10
 +
| Well Log Performed
 +
|-
 +
| 1990-06-12
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1990-07-11
 +
| Finished Drilling
 +
|-
 +
| 1990-07-13
 +
| Well Log Performed
 +
|-
 +
| 1990-07-15
 +
| Drill Stem Test Performed
 +
|-
 +
| 1990-07-17
 +
| Production Casing Operation Performed
 +
|-
 +
| 1990-07-17
 +
| Rig Released
 +
|-
 +
| 1990-07-28
 +
| Well Log Performed
 +
|-
 +
| 1990-07-31
 +
| Well Log Performed
 +
|-
 +
| 1990-08-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1990-08-07
 +
| Well Log Performed
 +
|-
 +
| 1990-08-10
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1990-08-22
 +
| Well Log Performed
 +
|-
 +
| 1990-08-24
 +
| Well Log Performed
 +
|-
 +
| 1990-08-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1990-08-29
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1990-12-17
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1992-01-04
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1997-11-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2001-03-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-06-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-03-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-03-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-03-06
 +
| Plug Back Performed
 +
|-
 +
| 2002-07-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-07-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2002-07-25
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2003-06-15
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2003-06-15
 +
| Plug Back Performed
 +
|-
 +
| 2003-06-15
 +
| Well Log Performed
 +
|-
 +
| 2003-06-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-06-16
 +
| Well Log Performed
 +
|-
 +
| 2003-06-21
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2003-06-21
 +
| Plug Back Performed
 +
|-
 +
| 2003-06-21
 +
| Well Log Performed
 +
|-
 +
| 2003-06-21
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2011-07-27
 +
| Well Abandoned
 +
|-
 +
| 2011-07-27
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 213:
 
| 1990-08-01
 
| 1990-08-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2425
+
| style="text-align: right;" | 2425.00
| style="text-align: right;" | 2427
+
| style="text-align: right;" | 2427.00
| style="text-align: right;" | 13
 
|-
 
| 1990-08-01
 
| Perforation
 
| style="text-align: right;" | 2430
 
| style="text-align: right;" | 2433
 
| style="text-align: right;" | 13
 
|-
 
| 1990-08-01
 
| Perforation
 
| style="text-align: right;" | 2436
 
| style="text-align: right;" | 2437
 
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
|-
 
| 1990-08-01
 
| Perforation
 
| style="text-align: right;" | 2439
 
| style="text-align: right;" | 2441.5
 
| style="text-align: right;" | 13
 
|-
 
| 1990-08-01
 
| Perforation
 
| style="text-align: right;" | 2444
 
| style="text-align: right;" | 2445
 
| style="text-align: right;" | 13
 
|-
 
| 1990-08-10
 
| Fracture
 
| style="text-align: right;" | 2425
 
| style="text-align: right;" | 2445
 
| style="text-align: right;" | 0
 
|-
 
| 1990-08-25
 
| Perforation
 
| style="text-align: right;" | 2302
 
| style="text-align: right;" | 2307
 
| style="text-align: right;" | 13
 
|-
 
| 1990-08-25
 
| Perforation
 
| style="text-align: right;" | 2313
 
| style="text-align: right;" | 2314
 
| style="text-align: right;" | 13
 
|-
 
| 1990-08-29
 
| Fracture
 
| style="text-align: right;" | 2302
 
| style="text-align: right;" | 2314
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 1990-12-17
 
| 1990-12-17
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2302
+
| style="text-align: right;" | 2302.00
| style="text-align: right;" | 2314
+
| style="text-align: right;" | 2314.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-11-21
 
| 1997-11-21
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2425
+
| style="text-align: right;" | 2425.00
| style="text-align: right;" | 2445
+
| style="text-align: right;" | 2445.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-03-22
 
| 2001-03-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2430.3
+
| style="text-align: right;" | 2430.30
| style="text-align: right;" | 2433.3
+
| style="text-align: right;" | 2433.30
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2001-03-22
 
| 2001-03-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2425.3
+
| style="text-align: right;" | 2425.30
| style="text-align: right;" | 2427.3
+
| style="text-align: right;" | 2427.30
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2001-06-28
 
| 2001-06-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2316
+
| style="text-align: right;" | 2316.00
| style="text-align: right;" | 2317.3
+
| style="text-align: right;" | 2317.30
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2002-03-04
 
| 2002-03-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2408.5
+
| style="text-align: right;" | 2408.50
| style="text-align: right;" | 2411.5
+
| style="text-align: right;" | 2411.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2002-03-06
 
| 2002-03-06
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2185
+
| style="text-align: right;" | 2185.00
| style="text-align: right;" | 2422
+
| style="text-align: right;" | 2422.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-07-23
 
| 2002-07-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1527.5
+
| style="text-align: right;" | 1527.50
| style="text-align: right;" | 1529
+
| style="text-align: right;" | 1529.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-07-23
 
| 2002-07-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1510.7
+
| style="text-align: right;" | 1510.70
| style="text-align: right;" | 1512.2
+
| style="text-align: right;" | 1512.20
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-07-23
 
| 2002-07-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1483.2
+
| style="text-align: right;" | 1483.20
| style="text-align: right;" | 1484.7
+
| style="text-align: right;" | 1484.70
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 +
|-
 +
| 1990-08-01
 +
| Perforation
 +
| style="text-align: right;" | 2430.00
 +
| style="text-align: right;" | 2433.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2002-07-24
 
| 2002-07-24
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1527.5
+
| style="text-align: right;" | 1527.50
| style="text-align: right;" | 1529
+
| style="text-align: right;" | 1529.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-07-25
 
| 2002-07-25
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1510.7
+
| style="text-align: right;" | 1510.70
| style="text-align: right;" | 1512.2
+
| style="text-align: right;" | 1512.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-07-25
 
| 2002-07-25
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1483.2
+
| style="text-align: right;" | 1483.20
| style="text-align: right;" | 1484.7
+
| style="text-align: right;" | 1484.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003-06-15
 
| 2003-06-15
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1476
+
| style="text-align: right;" | 1476.00
| style="text-align: right;" | 1477
+
| style="text-align: right;" | 1477.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003-06-16
 
| 2003-06-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1432.5
+
| style="text-align: right;" | 1432.50
| style="text-align: right;" | 1435
+
| style="text-align: right;" | 1435.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2003-06-21
 
| 2003-06-21
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1425
+
| style="text-align: right;" | 1425.00
| style="text-align: right;" | 1426.8
+
| style="text-align: right;" | 1426.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1990-08-01
 +
| Perforation
 +
| style="text-align: right;" | 2436.00
 +
| style="text-align: right;" | 2437.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1990-08-01
 +
| Perforation
 +
| style="text-align: right;" | 2439.00
 +
| style="text-align: right;" | 2441.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1990-08-01
 +
| Perforation
 +
| style="text-align: right;" | 2444.00
 +
| style="text-align: right;" | 2445.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1990-08-10
 +
| Fracture
 +
| style="text-align: right;" | 2425.00
 +
| style="text-align: right;" | 2445.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1990-08-25
 +
| Perforation
 +
| style="text-align: right;" | 2302.00
 +
| style="text-align: right;" | 2307.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1990-08-25
 +
| Perforation
 +
| style="text-align: right;" | 2313.00
 +
| style="text-align: right;" | 2314.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1990-08-29
 +
| Fracture
 +
| style="text-align: right;" | 2302.00
 +
| style="text-align: right;" | 2314.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 226: Line 365:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 271: Line 424:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 02:13, 19 January 2021

Well Details

Well ID: 0806113506002
Loading map...
Location: 00/06-35-080-11W6/2
Location Alias: 00/06-35-80-11 W6M
Location Alias 2: 00/06-35-080-11 W6/02
Country: Canada
Province: Alberta
Township: 080
Meridian: 6
Range: 11
Section: 35
County/Municipality: Saddle Hills County
Well Name: RELENTLESS FARMTON 6-35-80-11
Operator Name: Cequence Energy Ltd.
License Number: 0144346
License Date: 1990-06-04
License Status: Abandoned
Spud Date: 1990-06-10
Final Drill Date: 1990-07-11
Well Total Depth: 2501.00 m
Surface Hole Latitude: 55.975449
Surface Hole Longitude: -119.607540

For data sources see[1][2]

Well History

Date Event
1990-06-04 Obtained License
1990-06-10 Well Log Performed
1990-06-12 Surface Casing Operation Performed
1990-07-11 Finished Drilling
1990-07-13 Well Log Performed
1990-07-15 Drill Stem Test Performed
1990-07-17 Production Casing Operation Performed
1990-07-17 Rig Released
1990-07-28 Well Log Performed
1990-07-31 Well Log Performed
1990-08-01 Perforation Treatment Performed - Jet Perforation
1990-08-07 Well Log Performed
1990-08-10 Perforation Treatment Performed - Fractured
1990-08-22 Well Log Performed
1990-08-24 Well Log Performed
1990-08-25 Perforation Treatment Performed - Jet Perforation
1990-08-29 Perforation Treatment Performed - Fractured
1990-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-04 Well Mode changed to Drilled and Cased
1997-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-22 Perforation Treatment Performed - Jet Perforation
2001-06-28 Perforation Treatment Performed - Jet Perforation
2002-03-04 Perforation Treatment Performed - Jet Perforation
2002-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-06 Plug Back Performed
2002-07-23 Perforation Treatment Performed - Jet Perforation
2002-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-06-15 Perforation Treatment Performed - Cement Plug
2003-06-15 Plug Back Performed
2003-06-15 Well Log Performed
2003-06-16 Perforation Treatment Performed - Jet Perforation
2003-06-16 Well Log Performed
2003-06-21 Perforation Treatment Performed - Cement Plug
2003-06-21 Plug Back Performed
2003-06-21 Well Log Performed
2003-06-21 Well Mode changed to Abandoned Zone
2011-07-27 Well Abandoned
2011-07-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-01 Perforation 2425.00 2427.00 13
1990-12-17 Acid Treatment 2302.00 2314.00 0
1997-11-21 Acid Treatment 2425.00 2445.00 0
2001-03-22 Perforation 2430.30 2433.30 17
2001-03-22 Perforation 2425.30 2427.30 17
2001-06-28 Perforation 2316.00 2317.30 17
2002-03-04 Perforation 2408.50 2411.50 17
2002-03-06 Packing Device Capped w/Cement 2185.00 2422.00 0
2002-07-23 Perforation 1527.50 1529.00 7
2002-07-23 Perforation 1510.70 1512.20 7
2002-07-23 Perforation 1483.20 1484.70 7
1990-08-01 Perforation 2430.00 2433.00 13
2002-07-24 Acid Treatment 1527.50 1529.00 0
2002-07-25 Acid Treatment 1510.70 1512.20 0
2002-07-25 Acid Treatment 1483.20 1484.70 0
2003-06-15 Cement Plug 1476.00 1477.00 0
2003-06-16 Perforation 1432.50 1435.00 17
2003-06-21 Cement Plug 1425.00 1426.80 0
1990-08-01 Perforation 2436.00 2437.00 13
1990-08-01 Perforation 2439.00 2441.50 13
1990-08-01 Perforation 2444.00 2445.00 13
1990-08-10 Fracture 2425.00 2445.00 0
1990-08-25 Perforation 2302.00 2307.00 13
1990-08-25 Perforation 2313.00 2314.00 13
1990-08-29 Fracture 2302.00 2314.00 0

For data sources see[4]



References