X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0494013409030"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0494013409030
 
| Well ID: 0494013409030
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.27345700000000761, -110.05894100000000435 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.273457, -110.058941 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 03/09-34-049-01W4/0
 
| Location: 03/09-34-049-01W4/0
 +
|-
 +
| Location Alias: 03/09-34-49-01 W4M
 +
|-
 +
| Location Alias 2: 03/09-34-049-01 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 049
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 01
 +
|-
 +
| Section: 34
 +
|-
 +
| County/Municipality: [[Lloydminster,_Alberta|Lloydminster]]
 
|-
 
|-
 
| Well Name: EMERGO LLOYD 9-34-49-1
 
| Well Name: EMERGO LLOYD 9-34-49-1
 +
|-
 +
| Operator Name: [[Twin Butte Energy Ltd.]]
 +
|-
 +
| License Number: 0193043
 
|-
 
|-
 
| License Date: 1996-11-04
 
| License Date: 1996-11-04
 
|-
 
|-
| Final Drilling Date: 1996-11-28
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1996-11-25
 +
|-
 +
| Final Drill Date: 1996-11-28
 +
|-
 +
| Well Total Depth: 670.00 m
 +
|-
 +
| Surface Hole Latitude: 53.273457
 +
|-
 +
| Surface Hole Longitude: -110.058941
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1996-11-04
 +
| Obtained License
 +
|-
 +
| 1996-11-26
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1996-11-28
 +
| Finished Drilling
 +
|-
 +
| 1996-11-28
 +
| Well Log Performed
 +
|-
 +
| 1996-11-28
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1996-11-29
 +
| Production Casing Operation Performed
 
|-
 
|-
| Total Depth: 670.0m
+
| 1996-11-29
 +
| Rig Released
 
|-
 
|-
| Fluid Type: Water
+
| 1996-12-01
 +
| Well Log Performed
 
|-
 
|-
| Status: Abandoned
+
| 1996-12-02
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Well Type: Injection
+
| 1996-12-02
 +
| Well Began Production
 
|-
 
|-
| Configuration: Vertical
+
| 1996-12-02
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Latitude: 53.27345700000000761
+
| 1996-12-02
 +
| Well Mode changed to Pumping
 
|-
 
|-
| Longitude: -110.05894100000000435
+
| 1997-11-14
 +
| Well Log Performed
 
|-
 
|-
 +
| 1997-12-01
 +
| Well Began Injection
 +
|-
 +
| 1997-12-01
 +
| Well Fluid changed to Water
 +
|-
 +
| 1997-12-01
 +
| Well Type changed to Injection
 +
|-
 +
| 2002-07-30
 +
| Well Fluid changed to Water
 +
|-
 +
| 2002-07-30
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2002-07-30
 +
| Well Type changed to Injection
 +
|-
 +
| 2008-06-22
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2008-06-22
 +
| Plug Back Performed
 +
|-
 +
| 2008-06-22
 +
| Well Fluid changed to Water
 +
|-
 +
| 2008-06-22
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2008-06-22
 +
| Well Type changed to Injection
 +
|-
 +
| 2013-12-03
 +
| Well Abandoned
 +
|-
 +
| 2013-12-03
 +
| Well Fluid changed to Water
 +
|-
 +
| 2013-12-03
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 2013-12-03
 +
| Well Type changed to Injection
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
  
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1996-12-02
 +
| Perforation
 +
| style="text-align: right;" | 583.50
 +
| style="text-align: right;" | 590.00
 +
| style="text-align: right;" | 39
 +
|-
 +
| 2008-06-22
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 567.00
 +
| style="text-align: right;" | 575.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1996
 +
| style="text-align: right;" | 708
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1997
 +
| style="text-align: right;" | 3799
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1998
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1999
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2000
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2001
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 02:43, 19 January 2021

Well Details

Well ID: 0494013409030
Loading map...
Location: 03/09-34-049-01W4/0
Location Alias: 03/09-34-49-01 W4M
Location Alias 2: 03/09-34-049-01 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 01
Section: 34
County/Municipality: Lloydminster
Well Name: EMERGO LLOYD 9-34-49-1
Operator Name: Twin Butte Energy Ltd.
License Number: 0193043
License Date: 1996-11-04
License Status: RecCertified
Spud Date: 1996-11-25
Final Drill Date: 1996-11-28
Well Total Depth: 670.00 m
Surface Hole Latitude: 53.273457
Surface Hole Longitude: -110.058941

For data sources see[1][2]

Well History

Date Event
1996-11-04 Obtained License
1996-11-26 Surface Casing Operation Performed
1996-11-28 Finished Drilling
1996-11-28 Well Log Performed
1996-11-28 Well Mode changed to Drilled and Cased
1996-11-29 Production Casing Operation Performed
1996-11-29 Rig Released
1996-12-01 Well Log Performed
1996-12-02 Perforation Treatment Performed - Jet Perforation
1996-12-02 Well Began Production
1996-12-02 Well Fluid changed to Crude Oil
1996-12-02 Well Mode changed to Pumping
1997-11-14 Well Log Performed
1997-12-01 Well Began Injection
1997-12-01 Well Fluid changed to Water
1997-12-01 Well Type changed to Injection
2002-07-30 Well Fluid changed to Water
2002-07-30 Well Mode changed to Suspended
2002-07-30 Well Type changed to Injection
2008-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-22 Plug Back Performed
2008-06-22 Well Fluid changed to Water
2008-06-22 Well Mode changed to Abandoned Zone
2008-06-22 Well Type changed to Injection
2013-12-03 Well Abandoned
2013-12-03 Well Fluid changed to Water
2013-12-03 Well Mode changed to Abandoned
2013-12-03 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-02 Perforation 583.50 590.00 39
2008-06-22 Packing Device Capped w/Cement 567.00 575.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 708 0.0 0.0 0.0
1997 3799 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0

For data sources see[5]

References