X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0405053409000"

m
m
 
Line 195: Line 195:
 
| style="text-align: right;" | 1837.30
 
| style="text-align: right;" | 1837.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 2018-08-23
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1703.80
 +
| style="text-align: right;" | 1827.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-08-24
 +
| Cement Plug
 +
| style="text-align: right;" | 323.10
 +
| style="text-align: right;" | 426.80
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1976-06-02
 
| 1976-06-02
Line 242: Line 254:
 
| style="text-align: right;" | 1834.90
 
| style="text-align: right;" | 1834.90
 
| style="text-align: right;" | 1837.30
 
| style="text-align: right;" | 1837.30
| style="text-align: right;" | 0
 
|-
 
| 2018-08-23
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1703.80
 
| style="text-align: right;" | 1827.00
 
| style="text-align: right;" | 0
 
|-
 
| 2018-08-24
 
| Cement Plug
 
| style="text-align: right;" | 323.10
 
| style="text-align: right;" | 426.80
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 412: Line 412:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 05:38, 19 January 2021

Well Details

Well ID: 0405053409000
Loading map...
Location: 00/09-34-040-05W5/0
Location Alias: 00/09-34-40-05 W5M
Location Alias 2: 00/09-34-040-05 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 05
Section: 34
County/Municipality: Clearwater County
Well Name: PSEC WILLGR 9-34-40-5
Operator Name: Prairie Storm Energy Corp.
License Number: 0051923
License Date: 1974-11-20
License Status: Suspension
Spud Date: 1974-11-23
Final Drill Date: 1974-12-07
Well Total Depth: 1856.20 m
Surface Hole Latitude: 52.488585
Surface Hole Longitude: -114.629041

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-11-20 Obtained License
1974-12-06 Drill Stem Test Performed
1974-12-07 Finished Drilling
1974-12-07 Well Mode changed to Drilled and Cased
1974-12-08 Production Casing Operation Performed
1974-12-20 Perforation Treatment Performed - Jet Perforation
1975-03-17 Well Began Production
1975-03-17 Well Fluid changed to Crude Oil
1975-03-17 Well Mode changed to Flowing
1976-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-03 Perforation Treatment Performed - Fractured
1976-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-13 Perforation Treatment Performed - Jet Perforation
1976-07-14 Perforation Treatment Performed - Fractured
1979-06-28 Well Fluid changed to Crude Oil
1979-06-28 Well Mode changed to Pumping
1983-05-08 Well Fluid changed to Crude Oil
1983-05-08 Well Mode changed to Suspended
2005-11-09 Perforation Treatment Performed - Chemical Squeeze
2005-11-17 Well Fluid changed to Crude Oil
2005-11-17 Well Mode changed to Pumping
2009-08-06 Well Fluid changed to Crude Oil
2009-08-06 Well Mode changed to Suspended
2018-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-08-23 Perforation Treatment Performed - Cement Squeeze
2018-08-23 Plug Back Performed
2018-08-23 Well Fluid changed to Crude Oil
2018-08-23 Well Mode changed to Abandoned Zone
2018-08-24 Perforation Treatment Performed - Cement Plug
2018-08-24 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-12-20 Perforation 1834.90 1837.30 13
2018-08-23 Packing Device Capped w/Cement 1703.80 1827.00 0
2018-08-24 Cement Plug 323.10 426.80 0
1976-06-02 Acid Treatment 1834.90 1837.30 0
1976-06-03 Fracture 1834.90 1837.30 0
1976-07-10 Acid Treatment 1834.90 1837.30 0
1976-07-13 Perforation 1834.90 1837.30 13
1976-07-13 Acid Treatment 1834.90 1837.30 0
1976-07-14 Fracture 1834.90 1837.30 0
2005-11-09 Chemical Squeeze 1834.90 1837.30 0
2018-08-23 Cement Squeeze 1834.90 1837.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 5560 0.0 0.0 0.0
1976 7291 0.0 0.0 0.0
1977 8135 0.0 0.0 0.0
1978 5873 0.0 0.0 0.0
1979 4608 0.0 0.0 0.0
1980 8302 0.0 0.0 0.0
1981 7824 0.0 0.0 0.0
1982 5810 0.0 0.0 0.0
1983 389 0.0 0.0 0.0
2005 744 0.0 0.0 0.0
2006 8603 0.0 0.0 0.0
2007 8354 0.0 0.0 0.0
2008 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References