X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0494263512003"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0494263512003
 
| Well ID: 0494263512003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.2740931, -113.7050073 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.274087, -113.704734 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/12-35-049-26W4/3
 +
|-
 +
| Location Alias: 00/12-35-49-26 W4M
 +
|-
 +
| Location Alias 2: 00/12-35-049-26 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 049
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 35
 +
|-
 +
| County/Municipality: [[Leduc County,_Alberta|Leduc County]]
 
|-
 
|-
 
| Well Name: MEC LEDUC-WB 12-35-49-26
 
| Well Name: MEC LEDUC-WB 12-35-49-26
 
|-
 
|-
| Operator:
+
| Operator Name: [[NEP Canada ULC]]
 +
|-
 +
| License Number: 0001681
 
|-
 
|-
 
| License Date: 1950-06-29
 
| License Date: 1950-06-29
 
|-
 
|-
| Final Drilling Date: 1950-08-19
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 1950-07-21
 +
|-
 +
| Final Drill Date: 1950-08-19
 +
|-
 +
| Well Total Depth: 1645.90 m
 +
|-
 +
| Surface Hole Latitude: 53.274087
 +
|-
 +
| Surface Hole Longitude: -113.704734
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1950-06-29
 +
| Obtained License
 +
|-
 +
| 1950-08-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-08-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-08-14
 +
| Liner Casing Operation Performed
 
|-
 
|-
| Total Depth: 1645.9m
+
| 1950-08-19
 +
| Finished Drilling
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1950-08-19
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Status: Suspended
+
| 1950-08-23
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 
|-
 
|-
| Well Type: Not Applicable
+
| 1950-08-23
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Configuration: Vertical
+
| 1963-10-28
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Violations:
+
| 1963-10-30
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Latitude: 53.2740931
+
| 1963-10-30
 +
| Perforation Treatment Performed - Selective Jet Perforations
 
|-
 
|-
| Longitude: -113.7050073
+
| 1963-11-03
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1964-01-10
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1973-04-17
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1982-07-06
 +
| Perforation Treatment Performed - Selective Jet Perforations
 +
|-
 +
| 1982-07-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1988-03-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1988-03-04
 +
| Well Log Performed
 +
|-
 +
| 1988-03-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1988-03-09
 +
| Well Log Performed
 +
|-
 +
| 1988-03-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1988-03-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-03-11
 +
| Well Log Performed
 +
|-
 +
| 1992-07-15
 +
| Well Log Performed
 +
|-
 +
| 1995-07-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1995-07-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1995-07-15
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1996-09-05
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1996-09-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-09-05
 +
| Plug Back Performed
 +
|-
 +
| 1996-09-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-05-07
 +
| Well Log Performed
 +
|-
 +
| 1998-05-08
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1998-05-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-05-08
 +
| Plug Back Performed
 +
|-
 +
| 1998-05-08
 +
| Well Log Performed
 +
|-
 +
| 1998-05-29
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1998-06-13
 +
| Well Began Production
 +
|-
 +
| 1998-06-13
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1998-06-13
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1998-09-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1998-09-01
 +
| Well Mode changed to Suspended
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1950-08-23
 +
| Perforation
 +
| style="text-align: right;" | 1644.70
 +
| style="text-align: right;" | 1645.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1982-07-07
 +
| Acid Treatment
 +
| style="text-align: right;" | 1642.10
 +
| style="text-align: right;" | 1642.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-03-04
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1636.80
 +
| style="text-align: right;" | 1636.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-03-09
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1642.10
 +
| style="text-align: right;" | 1643.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988-03-11
 +
| Perforation
 +
| style="text-align: right;" | 1637.00
 +
| style="text-align: right;" | 1637.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1988-03-11
 +
| Acid Treatment
 +
| style="text-align: right;" | 1637.00
 +
| style="text-align: right;" | 1637.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995-07-12
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1637.00
 +
| style="text-align: right;" | 1637.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995-07-14
 +
| Perforation
 +
| style="text-align: right;" | 1634.10
 +
| style="text-align: right;" | 1634.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1995-07-15
 +
| Acid Treatment
 +
| style="text-align: right;" | 1634.10
 +
| style="text-align: right;" | 1634.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-05
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1596.00
 +
| style="text-align: right;" | 1604.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-05
 +
| Perforation
 +
| style="text-align: right;" | 1560.50
 +
| style="text-align: right;" | 1564.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1950-08-23
 +
| Acid Wash
 +
| style="text-align: right;" | 1644.70
 +
| style="text-align: right;" | 1645.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-09-05
 +
| Perforation
 +
| style="text-align: right;" | 1565.30
 +
| style="text-align: right;" | 1570.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-09-05
 +
| Perforation
 +
| style="text-align: right;" | 1571.00
 +
| style="text-align: right;" | 1575.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-09-06
 +
| Perforation
 +
| style="text-align: right;" | 1560.50
 +
| style="text-align: right;" | 1575.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-05-08
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1524.00
 +
| style="text-align: right;" | 1532.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1998-05-08
 +
| Perforation
 +
| style="text-align: right;" | 1217.00
 +
| style="text-align: right;" | 1224.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-05-29
 +
| Fracture
 +
| style="text-align: right;" | 1217.00
 +
| style="text-align: right;" | 1224.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-10-28
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1643.80
 +
| style="text-align: right;" | 1645.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-10-30
 +
| Perforation
 +
| style="text-align: right;" | 1642.90
 +
| style="text-align: right;" | 1643.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1963-10-30
 +
| Selective Jet Perforations
 +
| style="text-align: right;" | 1636.80
 +
| style="text-align: right;" | 1636.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-11-03
 +
| Acid Wash
 +
| style="text-align: right;" | 1636.80
 +
| style="text-align: right;" | 1636.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-01-10
 +
| Acid Wash
 +
| style="text-align: right;" | 1642.90
 +
| style="text-align: right;" | 1643.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1973-04-17
 +
| Acid Wash
 +
| style="text-align: right;" | 1642.90
 +
| style="text-align: right;" | 1643.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1982-07-06
 +
| Selective Jet Perforations
 +
| style="text-align: right;" | 1642.10
 +
| style="text-align: right;" | 1642.30
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-08-10
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 06:15, 19 January 2021

Well Details

Well ID: 0494263512003
Loading map...
Location: 00/12-35-049-26W4/3
Location Alias: 00/12-35-49-26 W4M
Location Alias 2: 00/12-35-049-26 W4/03
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 35
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 12-35-49-26
Operator Name: NEP Canada ULC
License Number: 0001681
License Date: 1950-06-29
License Status: Suspension
Spud Date: 1950-07-21
Final Drill Date: 1950-08-19
Well Total Depth: 1645.90 m
Surface Hole Latitude: 53.274087
Surface Hole Longitude: -113.704734

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-29 Obtained License
1950-08-10 Drill Stem Test Performed
1950-08-11 Drill Stem Test Performed
1950-08-14 Liner Casing Operation Performed
1950-08-19 Finished Drilling
1950-08-19 Well Mode changed to Drilled and Cased
1950-08-23 Perforation Treatment Performed - Acid Wash - No Pressure
1950-08-23 Perforation Treatment Performed - Jet Perforation
1963-10-28 Perforation Treatment Performed - Cement Squeeze
1963-10-30 Perforation Treatment Performed - Jet Perforation
1963-10-30 Perforation Treatment Performed - Selective Jet Perforations
1963-11-03 Perforation Treatment Performed - Acid Wash - No Pressure
1964-01-10 Perforation Treatment Performed - Acid Wash - No Pressure
1973-04-17 Perforation Treatment Performed - Acid Wash - No Pressure
1982-07-06 Perforation Treatment Performed - Selective Jet Perforations
1982-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-04 Perforation Treatment Performed - Cement Squeeze
1988-03-04 Well Log Performed
1988-03-09 Perforation Treatment Performed - Cement Squeeze
1988-03-09 Well Log Performed
1988-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-11 Perforation Treatment Performed - Jet Perforation
1988-03-11 Well Log Performed
1992-07-15 Well Log Performed
1995-07-12 Perforation Treatment Performed - Cement Squeeze
1995-07-14 Perforation Treatment Performed - Jet Perforation
1995-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-05 Perforation Treatment Performed - Jet Perforation
1996-09-05 Plug Back Performed
1996-09-06 Perforation Treatment Performed - Jet Perforation
1998-05-07 Well Log Performed
1998-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-08 Perforation Treatment Performed - Jet Perforation
1998-05-08 Plug Back Performed
1998-05-08 Well Log Performed
1998-05-29 Perforation Treatment Performed - Fractured
1998-06-13 Well Began Production
1998-06-13 Well Fluid changed to Crude Oil
1998-06-13 Well Mode changed to Pumping
1998-09-01 Well Fluid changed to Crude Oil
1998-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-23 Perforation 1644.70 1645.60 13
1982-07-07 Acid Treatment 1642.10 1642.30 0
1988-03-04 Cement Squeeze 1636.80 1636.80 0
1988-03-09 Cement Squeeze 1642.10 1643.50 0
1988-03-11 Perforation 1637.00 1637.50 13
1988-03-11 Acid Treatment 1637.00 1637.50 0
1995-07-12 Cement Squeeze 1637.00 1637.50 0
1995-07-14 Perforation 1634.10 1634.40 13
1995-07-15 Acid Treatment 1634.10 1634.40 0
1996-09-05 Packing Device Capped w/Cement 1596.00 1604.00 0
1996-09-05 Perforation 1560.50 1564.30 13
1950-08-23 Acid Wash 1644.70 1645.60 0
1996-09-05 Perforation 1565.30 1570.00 13
1996-09-05 Perforation 1571.00 1575.30 13
1996-09-06 Perforation 1560.50 1575.30 13
1998-05-08 Packing Device Capped w/Cement 1524.00 1532.00 0
1998-05-08 Perforation 1217.00 1224.00 13
1998-05-29 Fracture 1217.00 1224.00 0
1963-10-28 Cement Squeeze 1643.80 1645.60 0
1963-10-30 Perforation 1642.90 1643.50 13
1963-10-30 Selective Jet Perforations 1636.80 1636.80 0
1963-11-03 Acid Wash 1636.80 1636.80 0
1964-01-10 Acid Wash 1642.90 1643.50 0
1973-04-17 Acid Wash 1642.90 1643.50 0
1982-07-06 Selective Jet Perforations 1642.10 1642.30 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-10 No Incident Encountered 0.00 0.00

For data sources see[5]

References