If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0214273410000 | | Well ID: 0214273410000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 50.836317, -113.659729 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Location: 00/10-34-021-27W4/0 |
|- | |- | ||
− | | Operator: | + | | Location Alias: 00/10-34-21-27 W4M |
+ | |- | ||
+ | | Location Alias 2: 00/10-34-021-27 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 021 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 27 | ||
+ | |- | ||
+ | | Section: 34 | ||
+ | |- | ||
+ | | County/Municipality: [[Rocky View County,_Alberta|Rocky View County]] | ||
+ | |- | ||
+ | | Well Name: PERSIST OIL HERRON 10-34-21-27 | ||
+ | |- | ||
+ | | Operator Name: [[Persist Oil And Gas Inc.]] | ||
+ | |- | ||
+ | | License Number: 0392461 | ||
|- | |- | ||
| License Date: 2008-01-21 | | License Date: 2008-01-21 | ||
|- | |- | ||
− | | Final Drilling Date | + | | License Status: Issued |
+ | |- | ||
+ | | Spud Date: 2009-01-08 | ||
+ | |- | ||
+ | | Final Drill Date: 2009-01-09 | ||
+ | |- | ||
+ | | Well Total Depth: 1168.00 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 50.836317 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -113.659729 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2008-01-21 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 2009-01-08 | ||
+ | | Direction Drilling Operation Performed - Deviate | ||
+ | |- | ||
+ | | 2009-01-08 | ||
+ | | Surface Casing Operation Performed | ||
+ | |- | ||
+ | | 2009-01-09 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 2009-01-09 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 2009-01-09 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 2009-01-09 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 2009-01-15 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2009-02-06 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2009-02-13 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 2009-02-21 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 2009-02-21 | ||
+ | | Well Mode changed to Testing | ||
+ | |- | ||
+ | | 2009-03-06 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2009-03-06 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 2009-03-06 | ||
+ | | Well Mode changed to Test Completed | ||
+ | |- | ||
+ | | 2009-03-12 | ||
+ | | Perforation Treatment Performed - Fractured | ||
|- | |- | ||
− | | | + | | 2011-09-15 |
+ | | Perforation Treatment Performed - Jet Perforation | ||
|- | |- | ||
− | | | + | | 2011-09-17 |
+ | | Perforation Treatment Performed - Fractured | ||
|- | |- | ||
− | | | + | | 2017-04-04 |
+ | | Well Structure changed to Commingled | ||
|- | |- | ||
− | | Well Type | + | |} |
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
|- | |- | ||
− | | | + | |}--> |
+ | |||
+ | == Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
|- | |- | ||
− | | | + | | 2009-01-08 |
+ | | style="text-align: right;" | 0.00 | ||
+ | | Deviate (5 - 79 degrees) | ||
|- | |- | ||
− | | | + | |} |
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Direction Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
|- | |- | ||
− | | | + | | 2009-02-06 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 854.00 | ||
+ | | style="text-align: right;" | 857.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 531.60 | ||
+ | | style="text-align: right;" | 532.60 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 609.50 | ||
+ | | style="text-align: right;" | 611.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 706.30 | ||
+ | | style="text-align: right;" | 707.80 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 714.20 | ||
+ | | style="text-align: right;" | 714.70 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 725.30 | ||
+ | | style="text-align: right;" | 726.30 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 732.90 | ||
+ | | style="text-align: right;" | 733.90 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 743.20 | ||
+ | | style="text-align: right;" | 744.20 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 792.20 | ||
+ | | style="text-align: right;" | 792.70 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 803.30 | ||
+ | | style="text-align: right;" | 805.30 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 817.90 | ||
+ | | style="text-align: right;" | 818.90 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-02-13 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 854.00 | ||
+ | | style="text-align: right;" | 857.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 819.50 | ||
+ | | style="text-align: right;" | 820.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-17 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 341.50 | ||
+ | | style="text-align: right;" | 820.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2009-03-06 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 778.00 | ||
+ | | style="text-align: right;" | 781.00 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2009-03-12 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 778.00 | ||
+ | | style="text-align: right;" | 781.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 341.50 | ||
+ | | style="text-align: right;" | 343.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 380.50 | ||
+ | | style="text-align: right;" | 382.50 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 471.40 | ||
+ | | style="text-align: right;" | 471.90 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 518.70 | ||
+ | | style="text-align: right;" | 519.70 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2011-09-15 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 525.60 | ||
+ | | style="text-align: right;" | 527.60 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 2009 | ||
+ | | style="text-align: right;" | 48 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Well Production Data - All Alberta | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-25 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 0214273410000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.836317,"lon":-113.659729,"icon":""}]} |
Location: 00/10-34-021-27W4/0 | |
Location Alias: 00/10-34-21-27 W4M | |
Location Alias 2: 00/10-34-021-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 021 | |
Meridian: 4 | |
Range: 27 | |
Section: 34 | |
County/Municipality: Rocky View County | |
Well Name: PERSIST OIL HERRON 10-34-21-27 | |
Operator Name: Persist Oil And Gas Inc. | |
License Number: 0392461 | |
License Date: 2008-01-21 | |
License Status: Issued | |
Spud Date: 2009-01-08 | |
Final Drill Date: 2009-01-09 | |
Well Total Depth: 1168.00 m | |
Surface Hole Latitude: 50.836317 | |
Surface Hole Longitude: -113.659729 |
Date | Event |
---|---|
2008-01-21 | Obtained License |
2009-01-08 | Direction Drilling Operation Performed - Deviate |
2009-01-08 | Surface Casing Operation Performed |
2009-01-09 | Finished Drilling |
2009-01-09 | Production Casing Operation Performed |
2009-01-09 | Rig Released |
2009-01-09 | Well Mode changed to Drilled and Cased |
2009-01-15 | Well Log Performed |
2009-02-06 | Perforation Treatment Performed - Jet Perforation |
2009-02-13 | Perforation Treatment Performed - Fractured |
2009-02-21 | Well Fluid changed to Gas |
2009-02-21 | Well Mode changed to Testing |
2009-03-06 | Perforation Treatment Performed - Jet Perforation |
2009-03-06 | Well Fluid changed to Gas |
2009-03-06 | Well Mode changed to Test Completed |
2009-03-12 | Perforation Treatment Performed - Fractured |
2011-09-15 | Perforation Treatment Performed - Jet Perforation |
2011-09-17 | Perforation Treatment Performed - Fractured |
2017-04-04 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-01-08 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-06 | Perforation | 854.00 | 857.00 | 13 |
2011-09-15 | Perforation | 531.60 | 532.60 | 13 |
2011-09-15 | Perforation | 609.50 | 611.50 | 13 |
2011-09-15 | Perforation | 706.30 | 707.80 | 13 |
2011-09-15 | Perforation | 714.20 | 714.70 | 13 |
2011-09-15 | Perforation | 725.30 | 726.30 | 13 |
2011-09-15 | Perforation | 732.90 | 733.90 | 13 |
2011-09-15 | Perforation | 743.20 | 744.20 | 13 |
2011-09-15 | Perforation | 792.20 | 792.70 | 13 |
2011-09-15 | Perforation | 803.30 | 805.30 | 13 |
2011-09-15 | Perforation | 817.90 | 818.90 | 13 |
2009-02-13 | Fracture | 854.00 | 857.00 | 0 |
2011-09-15 | Perforation | 819.50 | 820.00 | 13 |
2011-09-17 | Fracture | 341.50 | 820.00 | 0 |
2009-03-06 | Perforation | 778.00 | 781.00 | 13 |
2009-03-12 | Fracture | 778.00 | 781.00 | 0 |
2011-09-15 | Perforation | 341.50 | 343.50 | 13 |
2011-09-15 | Perforation | 380.50 | 382.50 | 13 |
2011-09-15 | Perforation | 471.40 | 471.90 | 13 |
2011-09-15 | Perforation | 518.70 | 519.70 | 13 |
2011-09-15 | Perforation | 525.60 | 527.60 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[6]