X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0154180504040"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0154180504040
 
| Well ID: 0154180504040
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.226209, -112.456821 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.226209, -112.456821 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 04/04-05-015-18W4/0
 
| Location: 04/04-05-015-18W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 04/04-05-015-18 W4/00
 
| Location Alias 2: 04/04-05-015-18 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 015
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 18
 +
|-
 +
| Section: 05
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Taber,_Alberta|Municipal District of Taber]]
 
| County/Municipality: [[Municipal District of Taber,_Alberta|Municipal District of Taber]]
Line 29: Line 39:
 
| Final Drill Date: 2013-10-23
 
| Final Drill Date: 2013-10-23
 
|-
 
|-
| Well Total Depth: 1180 m
+
| Well Total Depth: 1180.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 50.226209
 
| Surface Hole Latitude: 50.226209
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2013-10-15
 +
| Obtained License
 +
|-
 +
| 2013-10-20
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2013-10-21
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2013-10-23
 +
| Finished Drilling
 +
|-
 +
| 2013-10-23
 +
| Production Casing Operation Performed
 +
|-
 +
| 2013-10-23
 +
| Rig Released
 +
|-
 +
| 2013-10-23
 +
| Well Log Performed
 +
|-
 +
| 2013-10-23
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2013-11-10
 +
| Well Log Performed
 +
|-
 +
| 2013-11-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2013-11-18
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2014-03-01
 +
| Well Began Injection
 +
|-
 +
| 2014-03-01
 +
| Well Fluid changed to Water
 +
|-
 +
| 2014-03-01
 +
| Well Type changed to Injection
 +
|-
 +
| 2015-06-09
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
== Spud Table ==
 
== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 54: Line 121:
 
!scope="col" | Activity Type
 
!scope="col" | Activity Type
 
|-
 
|-
| 19 Oct 2013
+
| 2013-10-19
 
| [[Precision Drilling Corporation]]
 
| [[Precision Drilling Corporation]]
 
| style="text-align: right;" | 157
 
| style="text-align: right;" | 157
Line 64: Line 131:
 
  | title =ST49: Daily Spud and Drilling Activity List
 
  | title =ST49: Daily Spud and Drilling Activity List
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-30
+
| date = 2020-04-30
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-09 }}</ref>
 
== Directional Drilling ==
 
== Directional Drilling ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 141:
 
|-
 
|-
 
| 2013-10-21
 
| 2013-10-21
| style="text-align: right;" | 750
+
| style="text-align: right;" | 750.10
 
+
| Deviate (5 - 79 degrees)
 
|-
 
|-
 
|}
 
|}
Line 81: Line 148:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 94: Line 161:
 
| 2013-11-17
 
| 2013-11-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1122
+
| style="text-align: right;" | 1122.00
| style="text-align: right;" | 1135
+
| style="text-align: right;" | 1135.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2013-11-18
 
| 2013-11-18
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1122
+
| style="text-align: right;" | 1122.00
| style="text-align: right;" | 1135
+
| style="text-align: right;" | 1135.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 108: Line 175:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 143: Line 224:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 35462.8
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2015
 
| 2015
Line 149: Line 230:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 47910.7
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2016
 
| 2016
Line 155: Line 236:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 55827.2
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2017
 
| 2017
Line 161: Line 242:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 59886.4
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2018
 
| 2018
Line 167: Line 248:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 51293.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 2019
 
| 2019
Line 173: Line 254:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 13596.6
+
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 179: Line 266:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Occurences ==
 
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 190: Line 277:
 
|-
 
|-
 
| 2013-10-22
 
| 2013-10-22
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
| 2013-11-20
 
| 2013-11-20
| No Incident
+
| No Incident Encountered
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | N/A
+
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
Line 203: Line 290:
 
  | title = General Well Data File - Tour-Occurence Data
 
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 08:48, 19 January 2021

Well Details

Well ID: 0154180504040
Loading map...
Location: 04/04-05-015-18W4/0
Location Alias: 04/04-05-15-18 W4M
Location Alias 2: 04/04-05-015-18 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 18
Section: 05
County/Municipality: Municipal District of Taber
Well Name: ZARGON 104 DD LBOW 4-5-15-18
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0460038
License Date: 2013-10-15
License Status: Issued
Spud Date: 2013-10-20
Final Drill Date: 2013-10-23
Well Total Depth: 1180.00 m
Surface Hole Latitude: 50.226209
Surface Hole Longitude: -112.456821

For data sources see[1][2]

Well History

Date Event
2013-10-15 Obtained License
2013-10-20 Surface Casing Operation Performed
2013-10-21 Direction Drilling Operation Performed - Deviate
2013-10-23 Finished Drilling
2013-10-23 Production Casing Operation Performed
2013-10-23 Rig Released
2013-10-23 Well Log Performed
2013-10-23 Well Mode changed to Drilled and Cased
2013-11-10 Well Log Performed
2013-11-17 Perforation Treatment Performed - Jet Perforation
2013-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-01 Well Began Injection
2014-03-01 Well Fluid changed to Water
2014-03-01 Well Type changed to Injection
2015-06-09 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-10-19 Precision Drilling Corporation 157 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-10-21 750.10 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-11-17 Perforation 1122.00 1135.00 20
2013-11-18 Acid Treatment 1122.00 1135.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-22 No Incident Encountered 0.00 0.00
2013-11-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References