X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0154273116000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0154273116000
 
| Well ID: 0154273116000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.30654100000003837, -113.69556099999999788 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.306541, -113.695561 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-31-015-27W4/0
 
| Location: 00/16-31-015-27W4/0
 
|-
 
|-
| Well Name: EMBER PARKLDNE 16-31-15-27
+
| Location Alias: 00/16-31-15-27 W4M
 +
|-
 +
| Location Alias 2: 00/16-31-015-27 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 015
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 27
 +
|-
 +
| Section: 31
 +
|-
 +
| County/Municipality: [[Municipal District of Willow Creek No. 26,_Alberta|Municipal District of Willow Creek No. 26]]
 +
|-
 +
| Well Name: LTAM PARKLDNE 16-31-15-27
 +
|-
 +
| Operator Name: [[Long Term Asset Management Inc.]]
 +
|-
 +
| License Number: 0364845
 
|-
 
|-
 
| License Date: 2006-10-23
 
| License Date: 2006-10-23
 
|-
 
|-
| Final Drilling Date: 2006-12-15
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 2006-12-13
 +
|-
 +
| Final Drill Date: 2006-12-15
 +
|-
 +
| Well Total Depth: 1460.00 m
 +
|-
 +
| Surface Hole Latitude: 50.306541
 +
|-
 +
| Surface Hole Longitude: -113.695561
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-10-23
 +
| Obtained License
 +
|-
 +
| 2006-12-14
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2006-12-15
 +
| Finished Drilling
 
|-
 
|-
| Total Depth: 1460.0m
+
| 2006-12-15
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2006-12-15
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Status: Abandoned
+
| 2006-12-16
 +
| Well Log Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 2006-12-17
 +
| Production Casing Operation Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2006-12-17
 +
| Rig Released
 
|-
 
|-
| Latitude: 50.30654100000003837
+
| 2012-07-02
 +
| Well Log Performed
 
|-
 
|-
| Longitude: -113.69556099999999788
+
| 2012-07-05
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
 +
| 2012-07-05
 +
| Well Log Performed
 +
|-
 +
| 2012-07-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-07-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-07-06
 +
| Well Log Performed
 +
|-
 +
| 2012-07-06
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 2012-07-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-07-07
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2012-07-07
 +
| Well Log Performed
 +
|-
 +
| 2012-07-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-07-08
 +
| Well Log Performed
 +
|-
 +
| 2012-07-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-07-09
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2012-07-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-07-10
 +
| Well Log Performed
 +
|-
 +
| 2012-07-11
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2012-08-23
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
  
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2012-07-05
 +
| Perforation
 +
| style="text-align: right;" | 599.00
 +
| style="text-align: right;" | 600.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2012-07-09
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 278.00
 +
| style="text-align: right;" | 280.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-07-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 247.20
 +
| style="text-align: right;" | 276.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-07-10
 +
| Perforation
 +
| style="text-align: right;" | 147.00
 +
| style="text-align: right;" | 148.00
 +
| style="text-align: right;" | 99
 +
|-
 +
| 2012-07-11
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 147.00
 +
| style="text-align: right;" | 148.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-07-06
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 587.00
 +
| style="text-align: right;" | 595.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-07-06
 +
| Perforation
 +
| style="text-align: right;" | 464.00
 +
| style="text-align: right;" | 465.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2012-07-06
 +
| Perforation
 +
| style="text-align: right;" | 368.00
 +
| style="text-align: right;" | 369.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2012-07-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 454.00
 +
| style="text-align: right;" | 462.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-07-07
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 368.00
 +
| style="text-align: right;" | 369.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-07-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 354.00
 +
| style="text-align: right;" | 366.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-07-08
 +
| Perforation
 +
| style="text-align: right;" | 278.00
 +
| style="text-align: right;" | 279.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2012-07-08
 +
| Perforation
 +
| style="text-align: right;" | 279.00
 +
| style="text-align: right;" | 280.00
 +
| style="text-align: right;" | 99
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-08-23
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Occurence Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 09:34, 19 January 2021

Well Details

Well ID: 0154273116000
Loading map...
Location: 00/16-31-015-27W4/0
Location Alias: 00/16-31-15-27 W4M
Location Alias 2: 00/16-31-015-27 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 27
Section: 31
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: LTAM PARKLDNE 16-31-15-27
Operator Name: Long Term Asset Management Inc.
License Number: 0364845
License Date: 2006-10-23
License Status: RecCertified
Spud Date: 2006-12-13
Final Drill Date: 2006-12-15
Well Total Depth: 1460.00 m
Surface Hole Latitude: 50.306541
Surface Hole Longitude: -113.695561

For data sources see[1][2]

Well History

Date Event
2006-10-23 Obtained License
2006-12-14 Surface Casing Operation Performed
2006-12-15 Finished Drilling
2006-12-15 Well Log Performed
2006-12-15 Well Mode changed to Drilled and Cased
2006-12-16 Well Log Performed
2006-12-17 Production Casing Operation Performed
2006-12-17 Rig Released
2012-07-02 Well Log Performed
2012-07-05 Perforation Treatment Performed - Jet Perforation
2012-07-05 Well Log Performed
2012-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-06 Perforation Treatment Performed - Jet Perforation
2012-07-06 Well Log Performed
2012-07-06 Well Mode changed to Abandoned
2012-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-07 Perforation Treatment Performed - Remedial Casing
2012-07-07 Well Log Performed
2012-07-08 Perforation Treatment Performed - Jet Perforation
2012-07-08 Well Log Performed
2012-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-09 Perforation Treatment Performed - Remedial Casing
2012-07-10 Perforation Treatment Performed - Jet Perforation
2012-07-10 Well Log Performed
2012-07-11 Perforation Treatment Performed - Remedial Casing
2012-08-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-05 Perforation 599.00 600.00 20
2012-07-09 Remedial Casing Cementing 278.00 280.00 0
2012-07-09 Packing Device Capped w/Cement 247.20 276.00 0
2012-07-10 Perforation 147.00 148.00 99
2012-07-11 Remedial Casing Cementing 147.00 148.00 0
2012-07-06 Packing Device Capped w/Cement 587.00 595.00 0
2012-07-06 Perforation 464.00 465.00 20
2012-07-06 Perforation 368.00 369.00 20
2012-07-07 Packing Device Capped w/Cement 454.00 462.00 0
2012-07-07 Remedial Casing Cementing 368.00 369.00 0
2012-07-07 Packing Device Capped w/Cement 354.00 366.00 0
2012-07-08 Perforation 278.00 279.00 20
2012-07-08 Perforation 279.00 280.00 99

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-23 No Incident Encountered 0.00 0.00

For data sources see[5]

References