X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0826021402002"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0826021402002
 
| Well ID: 0826021402002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 56.103484, -118.192917 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 56.103484, -118.192917 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/02-14-082-02W6/2
 
| Location: 00/02-14-082-02W6/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/02-14-082-02 W6/02
 
| Location Alias 2: 00/02-14-082-02 W6/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 082
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 02
 +
|-
 +
| Section: 14
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Fairview No. 136,_Alberta|Municipal District of Fairview No. 136]]
 
| County/Municipality: [[Municipal District of Fairview No. 136,_Alberta|Municipal District of Fairview No. 136]]
Line 17: Line 27:
 
| Well Name: CAVALIER WHITELAW 2-14-82-2
 
| Well Name: CAVALIER WHITELAW 2-14-82-2
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Cavalier Energy Limited]]
 
|-
 
|-
 
| License Number: 0001358
 
| License Number: 0001358
Line 29: Line 39:
 
| Final Drill Date: 1950-08-13
 
| Final Drill Date: 1950-08-13
 
|-
 
|-
| Well Total Depth: 2283.6 m
+
| Well Total Depth: 2283.60 m
 
|-
 
|-
 
| Surface Hole Latitude: 56.103484
 
| Surface Hole Latitude: 56.103484
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1950-04-14
 +
| Obtained License
 +
|-
 +
| 1950-05-26
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-05-28
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-05-29
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-05-31
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-06-01
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-06-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-06-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-06-05
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-06-06
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-06-07
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-06-08
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-06-09
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-06-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-06-25
 +
| Production Casing Operation Performed
 +
|-
 +
| 1950-08-05
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-08-09
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-08-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1950-08-13
 +
| Finished Drilling
 +
|-
 +
| 1950-08-13
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1950-08-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1950-08-23
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1950-12-20
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1950-12-22
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1950-12-24
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1951-01-02
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1951-01-07
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1951-01-09
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1957-10-28
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1957-10-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1957-11-01
 +
| Well Began Production
 +
|-
 +
| 1957-11-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1957-11-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1959-09-02
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1959-09-02
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1961-08-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1961-08-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1961-09-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1961-09-18
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1961-09-18
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1961-09-19
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1961-09-19
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1963-07-13
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1963-07-18
 +
| Well Abandoned
 +
|-
 +
| 1963-07-18
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1963-07-18
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 237:
 
| 1950-08-20
 
| 1950-08-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1183.2
+
| style="text-align: right;" | 1183.20
| style="text-align: right;" | 1191.8
+
| style="text-align: right;" | 1191.80
 
| style="text-align: right;" | 16
 
| style="text-align: right;" | 16
|-
 
| 1950-08-23
 
| Acid Treatment
 
| style="text-align: right;" | 1183.2
 
| style="text-align: right;" | 1191.8
 
| style="text-align: right;" | 0
 
|-
 
| 1950-12-20
 
| Bullet Perforation
 
| style="text-align: right;" | 1183.2
 
| style="text-align: right;" | 1185.4
 
| style="text-align: right;" | 13
 
|-
 
| 1950-12-22
 
| Bullet Perforation
 
| style="text-align: right;" | 1185.4
 
| style="text-align: right;" | 1188.1
 
| style="text-align: right;" | 13
 
|-
 
| 1950-12-24
 
| Acid Wash 
 
| style="text-align: right;" | 1183.2
 
| style="text-align: right;" | 1188.1
 
| style="text-align: right;" | 0
 
|-
 
| 1951-01-02
 
| Cement Squeeze
 
| style="text-align: right;" | 1183.2
 
| style="text-align: right;" | 1191.8
 
| style="text-align: right;" | 0
 
|-
 
| 1951-01-07
 
| Bullet Perforation
 
| style="text-align: right;" | 1183.2
 
| style="text-align: right;" | 1187.5
 
| style="text-align: right;" | 13
 
|-
 
| 1951-01-09
 
| Acid Wash 
 
| style="text-align: right;" | 1183.2
 
| style="text-align: right;" | 1187.5
 
| style="text-align: right;" | 0
 
|-
 
| 1957-10-28
 
| Cement Squeeze
 
| style="text-align: right;" | 1183.2
 
| style="text-align: right;" | 1191.8
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 1957-10-29
 
| 1957-10-29
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1030.2
+
| style="text-align: right;" | 1030.20
| style="text-align: right;" | 1033.3
+
| style="text-align: right;" | 1033.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1961-08-28
 
| 1961-08-28
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1030.2
+
| style="text-align: right;" | 1030.20
| style="text-align: right;" | 1033.3
+
| style="text-align: right;" | 1033.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1961-08-31
 
| 1961-08-31
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1051.6
+
| style="text-align: right;" | 1051.60
| style="text-align: right;" | 1054
+
| style="text-align: right;" | 1054.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1961-08-31
 
| 1961-08-31
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1057.7
+
| style="text-align: right;" | 1057.70
| style="text-align: right;" | 1059.5
+
| style="text-align: right;" | 1059.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1961-08-31
 
| 1961-08-31
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1070.5
+
| style="text-align: right;" | 1070.50
| style="text-align: right;" | 1071.7
+
| style="text-align: right;" | 1071.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1961-09-04
 
| 1961-09-04
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1051.6
+
| style="text-align: right;" | 1051.60
| style="text-align: right;" | 1071.7
+
| style="text-align: right;" | 1071.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1961-09-18
 
| 1961-09-18
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1057.7
+
| style="text-align: right;" | 1057.70
| style="text-align: right;" | 1071.7
+
| style="text-align: right;" | 1071.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1961-09-18
 
| 1961-09-18
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1064.1
+
| style="text-align: right;" | 1064.10
| style="text-align: right;" | 1073.5
+
| style="text-align: right;" | 1073.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1961-09-19
 
| 1961-09-19
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1051.6
+
| style="text-align: right;" | 1051.60
| style="text-align: right;" | 1059.5
+
| style="text-align: right;" | 1059.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1961-09-19
 
| 1961-09-19
| Fracture  
+
| Fracture
| style="text-align: right;" | 1051.6
+
| style="text-align: right;" | 1051.60
| style="text-align: right;" | 1059.5
+
| style="text-align: right;" | 1059.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1950-08-23
 +
| Acid Treatment
 +
| style="text-align: right;" | 1183.20
 +
| style="text-align: right;" | 1191.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-07-13
 
| 1963-07-13
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 993.6
+
| style="text-align: right;" | 993.60
| style="text-align: right;" | 1059.5
+
| style="text-align: right;" | 1059.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1950-12-20
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1183.20
 +
| style="text-align: right;" | 1185.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1950-12-22
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1185.40
 +
| style="text-align: right;" | 1188.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1950-12-24
 +
| Acid Wash
 +
| style="text-align: right;" | 1183.20
 +
| style="text-align: right;" | 1188.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1951-01-02
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1183.20
 +
| style="text-align: right;" | 1191.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1951-01-07
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1183.20
 +
| style="text-align: right;" | 1187.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1951-01-09
 +
| Acid Wash
 +
| style="text-align: right;" | 1183.20
 +
| style="text-align: right;" | 1187.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1957-10-28
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1183.20
 +
| style="text-align: right;" | 1191.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 196: Line 359:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 229: Line 406:
 
| 1961
 
| 1961
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 1132.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 52.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 237: Line 414:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 252: Line 429:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 11:16, 19 January 2021

Well Details

Well ID: 0826021402002
Loading map...
Location: 00/02-14-082-02W6/2
Location Alias: 00/02-14-82-02 W6M
Location Alias 2: 00/02-14-082-02 W6/02
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 02
Section: 14
County/Municipality: Municipal District of Fairview No. 136
Well Name: CAVALIER WHITELAW 2-14-82-2
Operator Name: Cavalier Energy Limited
License Number: 0001358
License Date: 1950-04-14
License Status: RecCertified
Spud Date: 1950-05-15
Final Drill Date: 1950-08-13
Well Total Depth: 2283.60 m
Surface Hole Latitude: 56.103484
Surface Hole Longitude: -118.192917

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-04-14 Obtained License
1950-05-26 Drill Stem Test Performed
1950-05-28 Drill Stem Test Performed
1950-05-29 Drill Stem Test Performed
1950-05-31 Drill Stem Test Performed
1950-06-01 Drill Stem Test Performed
1950-06-02 Drill Stem Test Performed
1950-06-04 Drill Stem Test Performed
1950-06-05 Drill Stem Test Performed
1950-06-06 Drill Stem Test Performed
1950-06-07 Drill Stem Test Performed
1950-06-08 Drill Stem Test Performed
1950-06-09 Drill Stem Test Performed
1950-06-10 Drill Stem Test Performed
1950-06-25 Production Casing Operation Performed
1950-08-05 Drill Stem Test Performed
1950-08-09 Drill Stem Test Performed
1950-08-11 Drill Stem Test Performed
1950-08-13 Finished Drilling
1950-08-13 Well Mode changed to Drilled and Cased
1950-08-20 Perforation Treatment Performed - Jet Perforation
1950-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-12-20 Perforation Treatment Performed - Bullet Perforation
1950-12-22 Perforation Treatment Performed - Bullet Perforation
1950-12-24 Perforation Treatment Performed - Acid Wash - No Pressure
1951-01-02 Perforation Treatment Performed - Cement Squeeze
1951-01-07 Perforation Treatment Performed - Bullet Perforation
1951-01-09 Perforation Treatment Performed - Acid Wash - No Pressure
1957-10-28 Perforation Treatment Performed - Cement Squeeze
1957-10-29 Perforation Treatment Performed - Jet Perforation
1957-11-01 Well Began Production
1957-11-01 Well Fluid changed to Gas
1957-11-01 Well Mode changed to Flowing
1959-09-02 Well Fluid changed to Gas
1959-09-02 Well Mode changed to Suspended
1961-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-08-31 Perforation Treatment Performed - Jet Perforation
1961-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-18 Perforation Treatment Performed - Cement Plug
1961-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-19 Perforation Treatment Performed - Fractured
1963-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1963-07-18 Well Abandoned
1963-07-18 Well Fluid changed to Gas
1963-07-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-20 Perforation 1183.20 1191.80 16
1957-10-29 Perforation 1030.20 1033.30 13
1961-08-28 Acid Treatment 1030.20 1033.30 0
1961-08-31 Perforation 1051.60 1054.00 13
1961-08-31 Perforation 1057.70 1059.50 13
1961-08-31 Perforation 1070.50 1071.70 13
1961-09-04 Acid Treatment 1051.60 1071.70 0
1961-09-18 Acid Treatment 1057.70 1071.70 0
1961-09-18 Cement Plug 1064.10 1073.50 0
1961-09-19 Acid Treatment 1051.60 1059.50 0
1961-09-19 Fracture 1051.60 1059.50 0
1950-08-23 Acid Treatment 1183.20 1191.80 0
1963-07-13 Packing Device Capped w/Cement 993.60 1059.50 0
1950-12-20 Bullet Perforation 1183.20 1185.40 13
1950-12-22 Bullet Perforation 1185.40 1188.10 13
1950-12-24 Acid Wash 1183.20 1188.10 0
1951-01-02 Cement Squeeze 1183.20 1191.80 0
1951-01-07 Bullet Perforation 1183.20 1187.50 13
1951-01-09 Acid Wash 1183.20 1187.50 0
1957-10-28 Cement Squeeze 1183.20 1191.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References