X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0224151113000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0224151113000
 
| Well ID: 0224151113000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.861946, -111.991247 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.861946, -111.991247 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/13-11-022-15W4/0
 
| Location: 00/13-11-022-15W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/13-11-022-15 W4/00
 
| Location Alias 2: 00/13-11-022-15 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 022
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 15
 +
|-
 +
| Section: 11
 
|-
 
|-
 
| County/Municipality: [[County of Newell,_Alberta|County of Newell]]
 
| County/Municipality: [[County of Newell,_Alberta|County of Newell]]
Line 17: Line 27:
 
| Well Name: TXNE VERGER 13-11-22-15
 
| Well Name: TXNE VERGER 13-11-22-15
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Torxen Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0271160
 
| License Number: 0271160
Line 29: Line 39:
 
| Final Drill Date: 2002-07-14
 
| Final Drill Date: 2002-07-14
 
|-
 
|-
| Well Total Depth: 1182 m
+
| Well Total Depth: 1182.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 50.861946
 
| Surface Hole Latitude: 50.861946
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2002-06-24
 +
| Obtained License
 +
|-
 +
| 2002-07-03
 +
| Production Casing Operation Performed
 +
|-
 +
| 2002-07-03
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2002-07-10
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2002-07-14
 +
| Finished Drilling
 +
|-
 +
| 2002-07-14
 +
| Rig Released
 +
|-
 +
| 2002-07-14
 +
| Well Log Performed
 +
|-
 +
| 2002-07-14
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2002-07-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-07-25
 +
| Well Log Performed
 +
|-
 +
| 2002-08-19
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-08-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-08-23
 +
| Plug Back Performed
 +
|-
 +
| 2002-08-23
 +
| Well Log Performed
 +
|-
 +
| 2002-08-23
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2002-08-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-08-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-08-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-08-30
 +
| Plug Back Performed
 +
|-
 +
| 2002-08-30
 +
| Well Log Performed
 +
|-
 +
| 2002-09-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-09-12
 +
| Plug Back Performed
 +
|-
 +
| 2002-09-12
 +
| Well Log Performed
 +
|-
 +
| 2002-09-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-09-13
 +
| Well Log Performed
 +
|-
 +
| 2002-10-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-10-18
 +
| Plug Back Performed
 +
|-
 +
| 2002-10-18
 +
| Well Log Performed
 +
|-
 +
| 2002-10-31
 +
| Well Log Performed
 +
|-
 +
| 2002-11-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-12-11
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-12-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-12-17
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-12-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-12-20
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-12-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-12-29
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2010-10-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 199:
 
|-
 
|-
 
| 2002-07-10
 
| 2002-07-10
| style="text-align: right;" | 314
+
| style="text-align: right;" | 314.00
 
+
| Deviate (5 - 79 degrees)
 
|-
 
|-
 
|}
 
|}
Line 70: Line 206:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 83: Line 219:
 
| 2002-07-25
 
| 2002-07-25
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1137
+
| style="text-align: right;" | 1137.00
| style="text-align: right;" | 1141.5
+
| style="text-align: right;" | 1141.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
|-
 
| 2002-08-19
 
| Fracture
 
| style="text-align: right;" | 1137
 
| style="text-align: right;" | 1141.5
 
| style="text-align: right;" | 0
 
|-
 
| 2002-08-23
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1122
 
| style="text-align: right;" | 1130
 
| style="text-align: right;" | 0
 
|-
 
| 2002-08-24
 
| Perforation
 
| style="text-align: right;" | 1054
 
| style="text-align: right;" | 1058
 
| style="text-align: right;" | 17
 
|-
 
| 2002-08-30
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1041
 
| style="text-align: right;" | 1049
 
| style="text-align: right;" | 0
 
|-
 
| 2002-08-30
 
| Perforation
 
| style="text-align: right;" | 989
 
| style="text-align: right;" | 990.5
 
| style="text-align: right;" | 17
 
|-
 
| 2002-09-12
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 978
 
| style="text-align: right;" | 986
 
| style="text-align: right;" | 0
 
|-
 
| 2002-09-13
 
| Perforation
 
| style="text-align: right;" | 813
 
| style="text-align: right;" | 818
 
| style="text-align: right;" | 17
 
|-
 
| 2002-10-18
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 798
 
| style="text-align: right;" | 806
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 2002-11-04
 
| 2002-11-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 746
+
| style="text-align: right;" | 746.00
| style="text-align: right;" | 749
+
| style="text-align: right;" | 749.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-12-11
 
| 2002-12-11
| Fracture  
+
| Fracture
| style="text-align: right;" | 746
+
| style="text-align: right;" | 746.00
| style="text-align: right;" | 749
+
| style="text-align: right;" | 749.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-12-16
 
| 2002-12-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 506
+
| style="text-align: right;" | 506.00
| style="text-align: right;" | 509
+
| style="text-align: right;" | 509.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-12-16
 
| 2002-12-16
 
| Perforation
 
| Perforation
| style="text-align: right;" | 494
+
| style="text-align: right;" | 494.00
| style="text-align: right;" | 497
+
| style="text-align: right;" | 497.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-12-17
 
| 2002-12-17
| Fracture  
+
| Fracture
| style="text-align: right;" | 494
+
| style="text-align: right;" | 494.00
| style="text-align: right;" | 509
+
| style="text-align: right;" | 509.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-12-19
 
| 2002-12-19
 
| Perforation
 
| Perforation
| style="text-align: right;" | 434
+
| style="text-align: right;" | 434.00
| style="text-align: right;" | 436
+
| style="text-align: right;" | 436.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-12-19
 
| 2002-12-19
 
| Perforation
 
| Perforation
| style="text-align: right;" | 422
+
| style="text-align: right;" | 422.00
| style="text-align: right;" | 424
+
| style="text-align: right;" | 424.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-12-19
 
| 2002-12-19
 
| Perforation
 
| Perforation
| style="text-align: right;" | 417
+
| style="text-align: right;" | 417.00
| style="text-align: right;" | 419
+
| style="text-align: right;" | 419.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-12-20
 
| 2002-12-20
| Fracture  
+
| Fracture
| style="text-align: right;" | 417
+
| style="text-align: right;" | 417.00
| style="text-align: right;" | 436
+
| style="text-align: right;" | 436.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-12-22
 
| 2002-12-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 397.5
+
| style="text-align: right;" | 397.50
| style="text-align: right;" | 399.5
+
| style="text-align: right;" | 399.50
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 +
|-
 +
| 2002-08-19
 +
| Fracture
 +
| style="text-align: right;" | 1137.00
 +
| style="text-align: right;" | 1141.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002-12-22
 
| 2002-12-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 386.5
+
| style="text-align: right;" | 386.50
| style="text-align: right;" | 388.5
+
| style="text-align: right;" | 388.50
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-12-22
 
| 2002-12-22
 
| Perforation
 
| Perforation
| style="text-align: right;" | 377
+
| style="text-align: right;" | 377.00
| style="text-align: right;" | 379
+
| style="text-align: right;" | 379.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2002-12-29
 
| 2002-12-29
| Fracture  
+
| Fracture
| style="text-align: right;" | 377
+
| style="text-align: right;" | 377.00
| style="text-align: right;" | 399.5
+
| style="text-align: right;" | 399.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010-10-01
 
| 2010-10-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 293.8
+
| style="text-align: right;" | 293.80
| style="text-align: right;" | 294.8
+
| style="text-align: right;" | 294.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2010-10-01
 
| 2010-10-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 284.5
+
| style="text-align: right;" | 284.50
| style="text-align: right;" | 286.5
+
| style="text-align: right;" | 286.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2010-10-01
 
| 2010-10-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 279.2
+
| style="text-align: right;" | 279.20
| style="text-align: right;" | 280.2
+
| style="text-align: right;" | 280.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2010-10-01
 
| 2010-10-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 275.2
+
| style="text-align: right;" | 275.20
| style="text-align: right;" | 276.2
+
| style="text-align: right;" | 276.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2010-10-01
 
| 2010-10-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 272.6
+
| style="text-align: right;" | 272.60
| style="text-align: right;" | 273.6
+
| style="text-align: right;" | 273.60
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2010-10-01
 
| 2010-10-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 266.2
+
| style="text-align: right;" | 266.20
| style="text-align: right;" | 267.2
+
| style="text-align: right;" | 267.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 2002-08-23
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1122.00
 +
| style="text-align: right;" | 1130.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-08-24
 +
| Perforation
 +
| style="text-align: right;" | 1054.00
 +
| style="text-align: right;" | 1058.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2002-08-30
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1041.00
 +
| style="text-align: right;" | 1049.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-08-30
 +
| Perforation
 +
| style="text-align: right;" | 989.00
 +
| style="text-align: right;" | 990.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2002-09-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 978.00
 +
| style="text-align: right;" | 986.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-09-13
 +
| Perforation
 +
| style="text-align: right;" | 813.00
 +
| style="text-align: right;" | 818.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2002-10-18
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 798.00
 +
| style="text-align: right;" | 806.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 253: Line 389:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 298: Line 448:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:05, 19 January 2021

Well Details

Well ID: 0224151113000
Loading map...
Location: 00/13-11-022-15W4/0
Location Alias: 00/13-11-22-15 W4M
Location Alias 2: 00/13-11-022-15 W4/00
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 15
Section: 11
County/Municipality: County of Newell
Well Name: TXNE VERGER 13-11-22-15
Operator Name: Torxen Energy Ltd.
License Number: 0271160
License Date: 2002-06-24
License Status: Issued
Spud Date: 2002-07-03
Final Drill Date: 2002-07-14
Well Total Depth: 1182.00 m
Surface Hole Latitude: 50.861946
Surface Hole Longitude: -111.991247

For data sources see[1][2]

Well History

Date Event
2002-06-24 Obtained License
2002-07-03 Production Casing Operation Performed
2002-07-03 Surface Casing Operation Performed
2002-07-10 Direction Drilling Operation Performed - Deviate
2002-07-14 Finished Drilling
2002-07-14 Rig Released
2002-07-14 Well Log Performed
2002-07-14 Well Mode changed to Drilled and Cased
2002-07-25 Perforation Treatment Performed - Jet Perforation
2002-07-25 Well Log Performed
2002-08-19 Perforation Treatment Performed - Fractured
2002-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-08-23 Plug Back Performed
2002-08-23 Well Log Performed
2002-08-23 Well Mode changed to Abandoned Zone
2002-08-24 Perforation Treatment Performed - Jet Perforation
2002-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-08-30 Perforation Treatment Performed - Jet Perforation
2002-08-30 Plug Back Performed
2002-08-30 Well Log Performed
2002-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-12 Plug Back Performed
2002-09-12 Well Log Performed
2002-09-13 Perforation Treatment Performed - Jet Perforation
2002-09-13 Well Log Performed
2002-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-18 Plug Back Performed
2002-10-18 Well Log Performed
2002-10-31 Well Log Performed
2002-11-04 Perforation Treatment Performed - Jet Perforation
2002-12-11 Perforation Treatment Performed - Fractured
2002-12-16 Perforation Treatment Performed - Jet Perforation
2002-12-17 Perforation Treatment Performed - Fractured
2002-12-19 Perforation Treatment Performed - Jet Perforation
2002-12-20 Perforation Treatment Performed - Fractured
2002-12-22 Perforation Treatment Performed - Jet Perforation
2002-12-29 Perforation Treatment Performed - Fractured
2010-10-01 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-07-10 314.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-25 Perforation 1137.00 1141.50 17
2002-11-04 Perforation 746.00 749.00 7
2002-12-11 Fracture 746.00 749.00 0
2002-12-16 Perforation 506.00 509.00 7
2002-12-16 Perforation 494.00 497.00 7
2002-12-17 Fracture 494.00 509.00 0
2002-12-19 Perforation 434.00 436.00 7
2002-12-19 Perforation 422.00 424.00 7
2002-12-19 Perforation 417.00 419.00 7
2002-12-20 Fracture 417.00 436.00 0
2002-12-22 Perforation 397.50 399.50 7
2002-08-19 Fracture 1137.00 1141.50 0
2002-12-22 Perforation 386.50 388.50 7
2002-12-22 Perforation 377.00 379.00 7
2002-12-29 Fracture 377.00 399.50 0
2010-10-01 Perforation 293.80 294.80 13
2010-10-01 Perforation 284.50 286.50 13
2010-10-01 Perforation 279.20 280.20 13
2010-10-01 Perforation 275.20 276.20 13
2010-10-01 Perforation 272.60 273.60 13
2010-10-01 Perforation 266.20 267.20 13
2002-08-23 Packing Device Capped w/Cement 1122.00 1130.00 0
2002-08-24 Perforation 1054.00 1058.00 17
2002-08-30 Packing Device Capped w/Cement 1041.00 1049.00 0
2002-08-30 Perforation 989.00 990.50 17
2002-09-12 Packing Device Capped w/Cement 978.00 986.00 0
2002-09-13 Perforation 813.00 818.00 17
2002-10-18 Packing Device Capped w/Cement 798.00 806.00 0

For data sources see[5]



References