X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0415052011000"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0415052011000
 
| Well ID: 0415052011000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.546764, -114.6886106 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.546697, -114.690844 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/11-20-041-05W5/0
 +
|-
 +
| Location Alias: 00/11-20-41-05 W5M
 +
|-
 +
| Location Alias 2: 00/11-20-041-05 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 041
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 05
 +
|-
 +
| Section: 20
 +
|-
 +
| County/Municipality: [[Clearwater County,_Alberta|Clearwater County]]
 
|-
 
|-
 
| Well Name: TANDEM WILLGR 11-20-41-5
 
| Well Name: TANDEM WILLGR 11-20-41-5
 
|-
 
|-
| Operator:
+
| Operator Name: [[Incipient Exploration Ltd.]]
 +
|-
 +
| License Number: 0411958
 
|-
 
|-
 
| License Date: 2009-08-25
 
| License Date: 2009-08-25
 
|-
 
|-
| Final Drilling Date: 2009-09-02
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2009-08-31
 +
|-
 +
| Final Drill Date: 2009-09-02
 +
|-
 +
| Well Total Depth: 1005.00 m
 +
|-
 +
| Surface Hole Latitude: 52.546697
 +
|-
 +
| Surface Hole Longitude: -114.690844
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-08-25
 +
| Obtained License
 +
|-
 +
| 2009-09-01
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2009-09-02
 +
| Finished Drilling
 +
|-
 +
| 2009-09-02
 +
| Well Log Performed
 +
|-
 +
| 2009-09-02
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2009-09-03
 +
| Production Casing Operation Performed
 +
|-
 +
| 2009-09-03
 +
| Rig Released
 +
|-
 +
| 2009-09-16
 +
| Well Log Performed
 +
|-
 +
| 2009-10-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-10-05
 +
| Well Log Performed
 +
|-
 +
| 2009-10-06
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-10-13
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Total Depth: 1005.0m
+
| 2009-10-13
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2009-10-14
 +
| Perforation Treatment Performed - Remedial Casing
 
|-
 
|-
| Status: Not Applicable
+
| 2009-10-16
 +
| Well Log Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 2009-10-25
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Configuration: Vertical
+
| 2009-10-25
 +
| Well Log Performed
 
|-
 
|-
| Violations:
+
| 2009-10-27
 +
| Perforation Treatment Performed - Remedial Casing
 
|-
 
|-
| Latitude: 52.546764
+
| 2009-11-05
 +
| Well Log Performed
 
|-
 
|-
| Longitude: -114.6886106
+
| 2009-12-23
 +
| Well Structure changed to Commingled
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2009-10-05
 +
| Perforation
 +
| style="text-align: right;" | 689.00
 +
| style="text-align: right;" | 690.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2009-10-06
 +
| Fracture
 +
| style="text-align: right;" | 745.00
 +
| style="text-align: right;" | 746.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-10-13
 +
| Perforation
 +
| style="text-align: right;" | 350.00
 +
| style="text-align: right;" | 350.50
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2009-10-14
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 350.00
 +
| style="text-align: right;" | 350.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-10-25
 +
| Perforation
 +
| style="text-align: right;" | 241.00
 +
| style="text-align: right;" | 242.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2009-10-27
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 241.00
 +
| style="text-align: right;" | 242.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-10-05
 +
| Perforation
 +
| style="text-align: right;" | 659.00
 +
| style="text-align: right;" | 660.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2009-10-05
 +
| Perforation
 +
| style="text-align: right;" | 745.00
 +
| style="text-align: right;" | 746.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2009-10-05
 +
| Perforation
 +
| style="text-align: right;" | 932.00
 +
| style="text-align: right;" | 933.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2009-10-05
 +
| Perforation
 +
| style="text-align: right;" | 926.50
 +
| style="text-align: right;" | 927.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2009-10-06
 +
| Fracture
 +
| style="text-align: right;" | 659.00
 +
| style="text-align: right;" | 660.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-10-06
 +
| Fracture
 +
| style="text-align: right;" | 689.00
 +
| style="text-align: right;" | 690.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-10-06
 +
| Fracture
 +
| style="text-align: right;" | 932.00
 +
| style="text-align: right;" | 933.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-10-06
 +
| Fracture
 +
| style="text-align: right;" | 926.50
 +
| style="text-align: right;" | 927.50
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:37, 19 January 2021

Well Details

Well ID: 0415052011000
Loading map...
Location: 00/11-20-041-05W5/0
Location Alias: 00/11-20-41-05 W5M
Location Alias 2: 00/11-20-041-05 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 05
Section: 20
County/Municipality: Clearwater County
Well Name: TANDEM WILLGR 11-20-41-5
Operator Name: Incipient Exploration Ltd.
License Number: 0411958
License Date: 2009-08-25
License Status: Issued
Spud Date: 2009-08-31
Final Drill Date: 2009-09-02
Well Total Depth: 1005.00 m
Surface Hole Latitude: 52.546697
Surface Hole Longitude: -114.690844

For data sources see[1][2]

Well History

Date Event
2009-08-25 Obtained License
2009-09-01 Surface Casing Operation Performed
2009-09-02 Finished Drilling
2009-09-02 Well Log Performed
2009-09-02 Well Mode changed to Drilled and Cased
2009-09-03 Production Casing Operation Performed
2009-09-03 Rig Released
2009-09-16 Well Log Performed
2009-10-05 Perforation Treatment Performed - Jet Perforation
2009-10-05 Well Log Performed
2009-10-06 Perforation Treatment Performed - Fractured
2009-10-13 Perforation Treatment Performed - Jet Perforation
2009-10-13 Well Log Performed
2009-10-14 Perforation Treatment Performed - Remedial Casing
2009-10-16 Well Log Performed
2009-10-25 Perforation Treatment Performed - Jet Perforation
2009-10-25 Well Log Performed
2009-10-27 Perforation Treatment Performed - Remedial Casing
2009-11-05 Well Log Performed
2009-12-23 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-05 Perforation 689.00 690.00 17
2009-10-06 Fracture 745.00 746.00 0
2009-10-13 Perforation 350.00 350.50 20
2009-10-14 Remedial Casing Cementing 350.00 350.50 0
2009-10-25 Perforation 241.00 242.00 17
2009-10-27 Remedial Casing Cementing 241.00 242.00 0
2009-10-05 Perforation 659.00 660.00 17
2009-10-05 Perforation 745.00 746.00 17
2009-10-05 Perforation 932.00 933.00 17
2009-10-05 Perforation 926.50 927.50 17
2009-10-06 Fracture 659.00 660.00 0
2009-10-06 Fracture 689.00 690.00 0
2009-10-06 Fracture 932.00 933.00 0
2009-10-06 Fracture 926.50 927.50 0

For data sources see[4]



References