X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0224250804003"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0224250804003
 
| Well ID: 0224250804003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.8507231, -113.4415714 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.849916, -113.439364 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: PCE PCR STRATHMORE 4-8-22-25
+
| Location: 00/04-08-022-25W4/3
 
|-
 
|-
| Operator:
+
| Location Alias: 00/04-08-22-25 W4M
 +
|-
 +
| Location Alias 2: 00/04-08-022-25 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 022
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 08
 +
|-
 +
| County/Municipality: [[Wheatland County,_Alberta|Wheatland County]]
 +
|-
 +
| Well Name: PERSIST OIL ENTICE 4-8-22-25
 +
|-
 +
| Operator Name: [[Persist Oil And Gas Inc.]]
 +
|-
 +
| License Number: 0265517
 
|-
 
|-
 
| License Date: 2002-01-02
 
| License Date: 2002-01-02
 
|-
 
|-
| Final Drilling Date: 2002-01-07
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2002-01-04
 +
|-
 +
| Final Drill Date: 2002-01-07
 +
|-
 +
| Well Total Depth: 970.00 m
 +
|-
 +
| Surface Hole Latitude: 50.849916
 +
|-
 +
| Surface Hole Longitude: -113.439364
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2002-01-02
 +
| Obtained License
 +
|-
 +
| 2002-01-04
 +
| Conductor Casing Operation Performed
 +
|-
 +
| 2002-01-07
 +
| Finished Drilling
 +
|-
 +
| 2002-01-07
 +
| Production Casing Operation Performed
 +
|-
 +
| 2002-01-07
 +
| Rig Released
 +
|-
 +
| 2002-01-07
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2002-01-23
 +
| Well Log Performed
 +
|-
 +
| 2002-03-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-07-02
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-08-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-09-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2002-12-03
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2002-12-04
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2002-12-04
 +
| Well Mode changed to Testing
 +
|-
 +
| 2003-01-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-01-08
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2003-01-08
 +
| Well Mode changed to Test Completed
 +
|-
 +
| 2003-06-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-07-05
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2003-10-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-10-17
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2003-12-20
 +
| Well Log Performed
 +
|-
 +
| 2003-12-21
 +
| Well Log Performed
 +
|-
 +
| 2017-03-14
 +
| Well Structure changed to Commingled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2002-03-27
 +
| Perforation
 +
| style="text-align: right;" | 859.00
 +
| style="text-align: right;" | 860.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2003-01-08
 +
| Perforation
 +
| style="text-align: right;" | 632.50
 +
| style="text-align: right;" | 636.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2003-06-14
 +
| Perforation
 +
| style="text-align: right;" | 600.00
 +
| style="text-align: right;" | 603.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-07-05
 +
| Fracture
 +
| style="text-align: right;" | 600.00
 +
| style="text-align: right;" | 603.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 570.80
 +
| style="text-align: right;" | 571.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 554.90
 +
| style="text-align: right;" | 555.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 553.30
 +
| style="text-align: right;" | 554.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 509.60
 +
| style="text-align: right;" | 510.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 489.90
 +
| style="text-align: right;" | 490.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 466.10
 +
| style="text-align: right;" | 467.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 417.80
 +
| style="text-align: right;" | 418.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2002-03-27
 +
| Perforation
 +
| style="text-align: right;" | 867.00
 +
| style="text-align: right;" | 870.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 413.60
 +
| style="text-align: right;" | 414.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 411.70
 +
| style="text-align: right;" | 412.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 407.30
 +
| style="text-align: right;" | 408.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 404.00
 +
| style="text-align: right;" | 405.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 396.20
 +
| style="text-align: right;" | 397.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 392.80
 +
| style="text-align: right;" | 393.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 381.60
 +
| style="text-align: right;" | 382.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 378.10
 +
| style="text-align: right;" | 380.10
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Total Depth: 970.0m
+
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 373.50
 +
| style="text-align: right;" | 375.50
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Fluid Type: Gas
+
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 363.00
 +
| style="text-align: right;" | 365.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Status: Test Completed
+
| 2002-03-27
 +
| Perforation
 +
| style="text-align: right;" | 871.00
 +
| style="text-align: right;" | 874.00
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Well Type: Not Applicable
+
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 361.80
 +
| style="text-align: right;" | 362.80
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Configuration: Vertical
+
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 278.20
 +
| style="text-align: right;" | 279.20
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Violations:
+
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 266.40
 +
| style="text-align: right;" | 267.40
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Latitude: 50.8507231
+
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 238.40
 +
| style="text-align: right;" | 239.40
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Longitude: -113.4415714
+
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 225.70
 +
| style="text-align: right;" | 226.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-10
 +
| Perforation
 +
| style="text-align: right;" | 199.10
 +
| style="text-align: right;" | 200.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2003-10-17
 +
| Fracture
 +
| style="text-align: right;" | 199.10
 +
| style="text-align: right;" | 571.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-07-02
 +
| Fracture
 +
| style="text-align: right;" | 859.00
 +
| style="text-align: right;" | 874.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-08-13
 +
| Perforation
 +
| style="text-align: right;" | 822.00
 +
| style="text-align: right;" | 824.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2002-08-13
 +
| Perforation
 +
| style="text-align: right;" | 825.00
 +
| style="text-align: right;" | 827.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2002-08-13
 +
| Perforation
 +
| style="text-align: right;" | 833.00
 +
| style="text-align: right;" | 835.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2002-09-26
 +
| Perforation
 +
| style="text-align: right;" | 759.50
 +
| style="text-align: right;" | 762.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2002-12-03
 +
| Fracture
 +
| style="text-align: right;" | 759.50
 +
| style="text-align: right;" | 762.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 15:36, 19 January 2021

Well Details

Well ID: 0224250804003
Loading map...
Location: 00/04-08-022-25W4/3
Location Alias: 00/04-08-22-25 W4M
Location Alias 2: 00/04-08-022-25 W4/03
Country: Canada
Province: Alberta
Township: 022
Meridian: 4
Range: 25
Section: 08
County/Municipality: Wheatland County
Well Name: PERSIST OIL ENTICE 4-8-22-25
Operator Name: Persist Oil And Gas Inc.
License Number: 0265517
License Date: 2002-01-02
License Status: Issued
Spud Date: 2002-01-04
Final Drill Date: 2002-01-07
Well Total Depth: 970.00 m
Surface Hole Latitude: 50.849916
Surface Hole Longitude: -113.439364

For data sources see[1][2]

Well History

Date Event
2002-01-02 Obtained License
2002-01-04 Conductor Casing Operation Performed
2002-01-07 Finished Drilling
2002-01-07 Production Casing Operation Performed
2002-01-07 Rig Released
2002-01-07 Well Mode changed to Drilled and Cased
2002-01-23 Well Log Performed
2002-03-27 Perforation Treatment Performed - Jet Perforation
2002-07-02 Perforation Treatment Performed - Fractured
2002-08-13 Perforation Treatment Performed - Jet Perforation
2002-09-26 Perforation Treatment Performed - Jet Perforation
2002-12-03 Perforation Treatment Performed - Fractured
2002-12-04 Well Fluid changed to Gas
2002-12-04 Well Mode changed to Testing
2003-01-08 Perforation Treatment Performed - Jet Perforation
2003-01-08 Well Fluid changed to Gas
2003-01-08 Well Mode changed to Test Completed
2003-06-14 Perforation Treatment Performed - Jet Perforation
2003-07-05 Perforation Treatment Performed - Fractured
2003-10-10 Perforation Treatment Performed - Jet Perforation
2003-10-17 Perforation Treatment Performed - Fractured
2003-12-20 Well Log Performed
2003-12-21 Well Log Performed
2017-03-14 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-27 Perforation 859.00 860.00 7
2003-01-08 Perforation 632.50 636.50 7
2003-06-14 Perforation 600.00 603.00 13
2003-07-05 Fracture 600.00 603.00 0
2003-10-10 Perforation 570.80 571.80 13
2003-10-10 Perforation 554.90 555.90 13
2003-10-10 Perforation 553.30 554.30 13
2003-10-10 Perforation 509.60 510.60 13
2003-10-10 Perforation 489.90 490.90 13
2003-10-10 Perforation 466.10 467.10 13
2003-10-10 Perforation 417.80 418.80 13
2002-03-27 Perforation 867.00 870.00 7
2003-10-10 Perforation 413.60 414.60 13
2003-10-10 Perforation 411.70 412.70 13
2003-10-10 Perforation 407.30 408.30 13
2003-10-10 Perforation 404.00 405.00 13
2003-10-10 Perforation 396.20 397.20 13
2003-10-10 Perforation 392.80 393.80 13
2003-10-10 Perforation 381.60 382.60 13
2003-10-10 Perforation 378.10 380.10 13
2003-10-10 Perforation 373.50 375.50 13
2003-10-10 Perforation 363.00 365.00 13
2002-03-27 Perforation 871.00 874.00 7
2003-10-10 Perforation 361.80 362.80 13
2003-10-10 Perforation 278.20 279.20 13
2003-10-10 Perforation 266.40 267.40 13
2003-10-10 Perforation 238.40 239.40 13
2003-10-10 Perforation 225.70 226.70 13
2003-10-10 Perforation 199.10 200.10 13
2003-10-17 Fracture 199.10 571.80 0
2002-07-02 Fracture 859.00 874.00 0
2002-08-13 Perforation 822.00 824.00 7
2002-08-13 Perforation 825.00 827.00 7
2002-08-13 Perforation 833.00 835.00 7
2002-09-26 Perforation 759.50 762.50 7
2002-12-03 Fracture 759.50 762.50 0

For data sources see[4]



References