If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0504263406000 | | Well ID: 0504263406000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 53.357752, -113.723370 | width=100% | height=100% }} |
+ | |- | ||
+ | | Location: 00/06-34-050-26W4/0 | ||
+ | |- | ||
+ | | Location Alias: 00/06-34-50-26 W4M | ||
+ | |- | ||
+ | | Location Alias 2: 00/06-34-050-26 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 050 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 26 | ||
+ | |- | ||
+ | | Section: 34 | ||
+ | |- | ||
+ | | County/Municipality: [[Devon,_Alberta|Devon]] | ||
|- | |- | ||
| Well Name: IMPERIAL LEDUC NO 56 | | Well Name: IMPERIAL LEDUC NO 56 | ||
|- | |- | ||
− | | Operator: | + | | Operator Name: [[Imperial Oil Resources Limited]] |
+ | |- | ||
+ | | License Number: B0002054 | ||
|- | |- | ||
| License Date: 1948-03-16 | | License Date: 1948-03-16 | ||
|- | |- | ||
− | | Final Drilling Date: 1948-04-18 | + | | License Status: RecCertified |
+ | |- | ||
+ | | Spud Date: 1948-03-14 | ||
+ | |- | ||
+ | | Final Drill Date: 1948-04-18 | ||
+ | |- | ||
+ | | Well Total Depth: 1825.80 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 53.357752 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -113.723370 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1948-03-16 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1948-04-08 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1948-04-13 | ||
+ | | Liner Casing Operation Performed | ||
+ | |- | ||
+ | | 1948-04-18 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1948-04-18 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 1948-04-18 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1948-04-22 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 1948-04-22 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1948-04-22 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1972-06-23 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1972-07-12 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 1972-07-13 | ||
+ | | Well Began Injection | ||
+ | |- | ||
+ | | 1972-07-13 | ||
+ | | Well Fluid changed to Water | ||
+ | |- | ||
+ | | 1972-07-13 | ||
+ | | Well Type changed to Injection | ||
+ | |- | ||
+ | | 1979-09-04 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1980-04-11 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1981-01-19 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1982-08-26 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1982-08-30 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1982-08-30 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 1982-08-30 | ||
+ | | Perforation Treatment Performed - Selective Jet Perforations | ||
+ | |- | ||
+ | | 1982-08-31 | ||
+ | | Perforation Treatment Performed - Selective Jet Perforations | ||
+ | |- | ||
+ | | 1982-09-01 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 1982-09-01 | ||
+ | | Well Fluid changed to Water | ||
+ | |- | ||
+ | | 1982-09-01 | ||
+ | | Well Mode changed to Abandoned | ||
+ | |- | ||
+ | | 1982-09-01 | ||
+ | | Well Type changed to Injection | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 1948-04-18 | ||
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 1611.50 | ||
+ | | style="text-align: right;" | 1616.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1982-08-30 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 475.00 | ||
+ | | style="text-align: right;" | 475.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1982-08-30 | ||
+ | | Cement Plug | ||
+ | | style="text-align: right;" | 150.00 | ||
+ | | style="text-align: right;" | 280.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1982-08-31 | ||
+ | | Selective Jet Perforations | ||
+ | | style="text-align: right;" | 176.00 | ||
+ | | style="text-align: right;" | 176.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1982-08-31 | ||
+ | | Selective Jet Perforations | ||
+ | | style="text-align: right;" | 40.00 | ||
+ | | style="text-align: right;" | 40.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1982-09-01 |
+ | | Cement Plug | ||
+ | | style="text-align: right;" | 10.00 | ||
+ | | style="text-align: right;" | 92.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1972-06-23 |
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1611.50 | ||
+ | | style="text-align: right;" | 1616.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1972-07-12 |
+ | | Open Hole/Barefoot Completion | ||
+ | | style="text-align: right;" | 1762.00 | ||
+ | | style="text-align: right;" | 1825.80 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1979-09-04 |
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1762.00 | ||
+ | | style="text-align: right;" | 1825.80 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1980-04-11 |
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1762.00 | ||
+ | | style="text-align: right;" | 1825.80 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1981-01-19 |
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1762.00 | ||
+ | | style="text-align: right;" | 1825.80 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1982-08-26 |
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1582.20 | ||
+ | | style="text-align: right;" | 1593.20 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1982-08-30 |
+ | | Cement Plug | ||
+ | | style="text-align: right;" | 1036.30 | ||
+ | | style="text-align: right;" | 1096.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1982-08-30 | ||
+ | | Selective Jet Perforations | ||
+ | | style="text-align: right;" | 496.00 | ||
+ | | style="text-align: right;" | 496.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 1961 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1963 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1964 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1972 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1973 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1974 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1975 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1977 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1978 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1979 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1980 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1981 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 1982 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Well Production Data - All Alberta | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-25 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 0504263406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.357752,"lon":-113.72337,"icon":""}]} |
Location: 00/06-34-050-26W4/0 | |
Location Alias: 00/06-34-50-26 W4M | |
Location Alias 2: 00/06-34-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 34 | |
County/Municipality: Devon | |
Well Name: IMPERIAL LEDUC NO 56 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: B0002054 | |
License Date: 1948-03-16 | |
License Status: RecCertified | |
Spud Date: 1948-03-14 | |
Final Drill Date: 1948-04-18 | |
Well Total Depth: 1825.80 m | |
Surface Hole Latitude: 53.357752 | |
Surface Hole Longitude: -113.723370 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1948-03-16 | Obtained License |
1948-04-08 | Drill Stem Test Performed |
1948-04-13 | Liner Casing Operation Performed |
1948-04-18 | Finished Drilling |
1948-04-18 | Perforation Treatment Performed - Open-Hole Completion |
1948-04-18 | Well Mode changed to Drilled and Cased |
1948-04-22 | Well Began Production |
1948-04-22 | Well Fluid changed to Crude Oil |
1948-04-22 | Well Mode changed to Flowing |
1972-06-23 | Perforation Treatment Performed - Cement Squeeze |
1972-07-12 | Perforation Treatment Performed - Open-Hole Completion |
1972-07-13 | Well Began Injection |
1972-07-13 | Well Fluid changed to Water |
1972-07-13 | Well Type changed to Injection |
1979-09-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-04-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-01-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-08-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-08-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-08-30 | Perforation Treatment Performed - Cement Plug |
1982-08-30 | Perforation Treatment Performed - Selective Jet Perforations |
1982-08-31 | Perforation Treatment Performed - Selective Jet Perforations |
1982-09-01 | Perforation Treatment Performed - Cement Plug |
1982-09-01 | Well Fluid changed to Water |
1982-09-01 | Well Mode changed to Abandoned |
1982-09-01 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1948-04-18 | Open Hole/Barefoot Completion | 1611.50 | 1616.00 | 0 |
1982-08-30 | Packing Device Capped w/Cement | 475.00 | 475.00 | 0 |
1982-08-30 | Cement Plug | 150.00 | 280.00 | 0 |
1982-08-31 | Selective Jet Perforations | 176.00 | 176.00 | 0 |
1982-08-31 | Selective Jet Perforations | 40.00 | 40.00 | 0 |
1982-09-01 | Cement Plug | 10.00 | 92.00 | 0 |
1972-06-23 | Cement Squeeze | 1611.50 | 1616.00 | 0 |
1972-07-12 | Open Hole/Barefoot Completion | 1762.00 | 1825.80 | 0 |
1979-09-04 | Acid Treatment | 1762.00 | 1825.80 | 0 |
1980-04-11 | Acid Treatment | 1762.00 | 1825.80 | 0 |
1981-01-19 | Acid Treatment | 1762.00 | 1825.80 | 0 |
1982-08-26 | Packing Device Capped w/Cement | 1582.20 | 1593.20 | 0 |
1982-08-30 | Cement Plug | 1036.30 | 1096.00 | 0 |
1982-08-30 | Selective Jet Perforations | 496.00 | 496.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]