X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0424202903003"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0424202903003
 
| Well ID: 0424202903003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.6397137, -112.8506581 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.641054, -112.851723 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: DEML MANITO 3-29-42-20
+
| Location: 00/03-29-042-20W4/3
 
|-
 
|-
| Operator:
+
| Location Alias: 00/03-29-42-20 W4M
 +
|-
 +
| Location Alias 2: 00/03-29-042-20 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 042
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 20
 +
|-
 +
| Section: 29
 +
|-
 +
| County/Municipality:
 +
|-
 +
| Well Name: TEAC BASHAW 3-29-42-20
 +
|-
 +
| Operator Name: [[Trident Exploration (Alberta) Corp.]]
 +
|-
 +
| License Number: 0360649
 
|-
 
|-
 
| License Date: 2006-07-25
 
| License Date: 2006-07-25
 
|-
 
|-
| Final Drilling Date: 2006-09-10
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2006-08-25
 +
|-
 +
| Final Drill Date: 2006-09-10
 +
|-
 +
| Well Total Depth: 440.00 m
 +
|-
 +
| Surface Hole Latitude: 52.641054
 +
|-
 +
| Surface Hole Longitude: -112.851723
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
|}-->
 +
 
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 
|-
 
|-
| Total Depth: 440.0m
+
| 2006-10-15
 +
| Perforation
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 335
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2006-10-15
 +
| Perforation
 +
| style="text-align: right;" | 194
 +
| style="text-align: right;" | 195.5
 +
| style="text-align: right;" | 7
 
|-
 
|-
| Status: Not Applicable
+
| 2006-11-01
 +
| Fracture
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 335
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2006-11-01
 +
| Fracture
 +
| style="text-align: right;" | 312.5
 +
| style="text-align: right;" | 313.5
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 2006-11-01
 +
| Fracture
 +
| style="text-align: right;" | 304.5
 +
| style="text-align: right;" | 305.5
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Violations:
+
| 2006-11-01
 +
| Fracture
 +
| style="text-align: right;" | 281
 +
| style="text-align: right;" | 282
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 52.6397137
+
| 2006-11-01
 +
| Fracture
 +
| style="text-align: right;" | 266.5
 +
| style="text-align: right;" | 267
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -112.8506581
+
| 2006-11-01
 +
| Fracture
 +
| style="text-align: right;" | 262.7
 +
| style="text-align: right;" | 263.7
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-11-01
 +
| Fracture
 +
| style="text-align: right;" | 250
 +
| style="text-align: right;" | 251.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-11-01
 +
| Fracture
 +
| style="text-align: right;" | 219
 +
| style="text-align: right;" | 220
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-11-01
 +
| Fracture
 +
| style="text-align: right;" | 209.5
 +
| style="text-align: right;" | 211
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-10-15
 +
| Perforation
 +
| style="text-align: right;" | 312.5
 +
| style="text-align: right;" | 313.5
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-11-01
 +
| Fracture
 +
| style="text-align: right;" | 194
 +
| style="text-align: right;" | 195.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-10-17
 +
| Perforation
 +
| style="text-align: right;" | 390
 +
| style="text-align: right;" | 392
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2008-10-17
 +
| Perforation
 +
| style="text-align: right;" | 362
 +
| style="text-align: right;" | 364
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2008-10-17
 +
| Perforation
 +
| style="text-align: right;" | 338
 +
| style="text-align: right;" | 340
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-10-15
 +
| Perforation
 +
| style="text-align: right;" | 34.5
 +
| style="text-align: right;" | 305.5
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-10-15
 +
| Perforation
 +
| style="text-align: right;" | 281
 +
| style="text-align: right;" | 282
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-10-15
 +
| Perforation
 +
| style="text-align: right;" | 266.5
 +
| style="text-align: right;" | 267
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-10-15
 +
| Perforation
 +
| style="text-align: right;" | 262.7
 +
| style="text-align: right;" | 263.7
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-10-15
 +
| Perforation
 +
| style="text-align: right;" | 250
 +
| style="text-align: right;" | 251.5
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-10-15
 +
| Perforation
 +
| style="text-align: right;" | 219
 +
| style="text-align: right;" | 220
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2006-10-15
 +
| Perforation
 +
| style="text-align: right;" | 209.5
 +
| style="text-align: right;" | 211
 +
| style="text-align: right;" | 7
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:31, 19 January 2021

Well Details

Well ID: 0424202903003
Loading map...
Location: 00/03-29-042-20W4/3
Location Alias: 00/03-29-42-20 W4M
Location Alias 2: 00/03-29-042-20 W4/03
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 20
Section: 29
County/Municipality:
Well Name: TEAC BASHAW 3-29-42-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0360649
License Date: 2006-07-25
License Status: Issued
Spud Date: 2006-08-25
Final Drill Date: 2006-09-10
Well Total Depth: 440.00 m
Surface Hole Latitude: 52.641054
Surface Hole Longitude: -112.851723

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-15 Perforation 334 335 7
2006-10-15 Perforation 194 195.5 7
2006-11-01 Fracture 334 335 0
2006-11-01 Fracture 312.5 313.5 0
2006-11-01 Fracture 304.5 305.5 0
2006-11-01 Fracture 281 282 0
2006-11-01 Fracture 266.5 267 0
2006-11-01 Fracture 262.7 263.7 0
2006-11-01 Fracture 250 251.5 0
2006-11-01 Fracture 219 220 0
2006-11-01 Fracture 209.5 211 0
2006-10-15 Perforation 312.5 313.5 7
2006-11-01 Fracture 194 195.5 0
2008-10-17 Perforation 390 392 17
2008-10-17 Perforation 362 364 17
2008-10-17 Perforation 338 340 17
2006-10-15 Perforation 34.5 305.5 7
2006-10-15 Perforation 281 282 7
2006-10-15 Perforation 266.5 267 17
2006-10-15 Perforation 262.7 263.7 7
2006-10-15 Perforation 250 251.5 7
2006-10-15 Perforation 219 220 7
2006-10-15 Perforation 209.5 211 7

For data sources see[3]



References