X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0836110703004"

m
 
m
 
Line 103: Line 103:
 
| style="text-align: right;" | 1580.00
 
| style="text-align: right;" | 1580.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 +
|-
 +
| 2018-11-13
 +
| Perforation
 +
| style="text-align: right;" | 569.00
 +
| style="text-align: right;" | 570.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2018-11-13
 +
| Cement Squeeze
 +
| style="text-align: right;" | 569.00
 +
| style="text-align: right;" | 570.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-11-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 539.00
 +
| style="text-align: right;" | 567.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-11-13
 +
| Perforation
 +
| style="text-align: right;" | 498.00
 +
| style="text-align: right;" | 499.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2018-11-13
 +
| Cement Squeeze
 +
| style="text-align: right;" | 498.00
 +
| style="text-align: right;" | 499.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018-11-13
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 443.50
 +
| style="text-align: right;" | 495.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004-01-30
 
| 2004-01-30
Line 150: Line 186:
 
| style="text-align: right;" | 929.90
 
| style="text-align: right;" | 929.90
 
| style="text-align: right;" | 940.00
 
| style="text-align: right;" | 940.00
| style="text-align: right;" | 0
 
|-
 
| 2018-11-13
 
| Perforation
 
| style="text-align: right;" | 569.00
 
| style="text-align: right;" | 570.00
 
| style="text-align: right;" | 17
 
|-
 
| 2018-11-13
 
| Cement Squeeze
 
| style="text-align: right;" | 569.00
 
| style="text-align: right;" | 570.00
 
| style="text-align: right;" | 0
 
|-
 
| 2018-11-13
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 539.00
 
| style="text-align: right;" | 567.00
 
| style="text-align: right;" | 0
 
|-
 
| 2018-11-13
 
| Perforation
 
| style="text-align: right;" | 498.00
 
| style="text-align: right;" | 499.00
 
| style="text-align: right;" | 17
 
|-
 
| 2018-11-13
 
| Cement Squeeze
 
| style="text-align: right;" | 498.00
 
| style="text-align: right;" | 499.00
 
| style="text-align: right;" | 0
 
|-
 
| 2018-11-13
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 443.50
 
| style="text-align: right;" | 495.50
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 261: Line 261:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:58, 19 January 2021

Well Details

Well ID: 0836110703004
Loading map...
Location: 00/03-07-083-11W6/4
Location Alias: 00/03-07-83-11 W6M
Location Alias 2: 00/03-07-083-11 W6/04
Country: Canada
Province: Alberta
Township: 083
Meridian: 6
Range: 11
Section: 07
County/Municipality: Clear Hills County
Well Name: TERRA BONANZA 3-7-83-11
Operator Name: Terra Energy Corp.
License Number: 0296404
License Date: 2003-11-18
License Status: Abandoned
Spud Date: 2003-11-30
Final Drill Date: 2003-12-24
Well Total Depth: 2245.00 m
Surface Hole Latitude: 56.180248
Surface Hole Longitude: -119.744178

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2003-12-04 390.00 Deviate (5 - 79 degrees)

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-01-30 Perforation 1576.00 1580.00 17
2018-11-13 Perforation 569.00 570.00 17
2018-11-13 Cement Squeeze 569.00 570.00 0
2018-11-13 Packing Device Capped w/Cement 539.00 567.00 0
2018-11-13 Perforation 498.00 499.00 17
2018-11-13 Cement Squeeze 498.00 499.00 0
2018-11-13 Packing Device Capped w/Cement 443.50 495.50 0
2004-01-30 Perforation 1452.00 1456.00 17
2004-02-07 Fracture 1576.00 1580.00 0
2004-02-07 Fracture 1452.00 1456.00 0
2004-03-09 Perforation 1347.00 1350.50 17
2004-06-08 Perforation 945.00 949.00 17
2018-11-11 Packing Device Capped w/Cement 1428.00 1438.50 0
2018-11-12 Packing Device Capped w/Cement 1329.80 1340.00 0
2018-11-12 Packing Device Capped w/Cement 929.90 940.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-30 No Incident Encountered 0.00 0.00

For data sources see[5]

References