If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 247: | Line 247: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0424232006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.629367,"lon":-113.280128,"icon":""}]} |
Location: 00/06-20-042-23W4/0 | |
Location Alias: 00/06-20-42-23 W4M | |
Location Alias 2: 00/06-20-042-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 23 | |
Section: 20 | |
County/Municipality: Ponoka County | |
Well Name: BOUNDARY CREEK ETAL WOODR 6-20-42-23 | |
Operator Name: Crew Energy Inc. | |
License Number: 0097735 | |
License Date: 1982-10-05 | |
License Status: Re-entered | |
Spud Date: 1982-10-07 | |
Final Drill Date: 1982-10-20 | |
Well Total Depth: 1790.00 m | |
Surface Hole Latitude: 52.629367 | |
Surface Hole Longitude: -113.280128 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-10-05 | Obtained License |
1982-10-20 | Finished Drilling |
1982-10-21 | Drill Stem Test Performed |
1982-10-22 | Drill Stem Test Performed |
1982-10-23 | Drill Stem Test Performed |
1982-10-25 | Production Casing Operation Performed |
1982-10-25 | Well Mode changed to Drilled and Cased |
1985-05-15 | Perforation Treatment Performed - Jet Perforation |
1985-05-15 | Well Log Performed |
1999-12-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-12-10 | Plug Back Performed |
1999-12-10 | Well Abandoned |
1999-12-10 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-05-15 | Perforation | 567.50 | 570.00 | 13 |
1985-05-15 | Perforation | 555.00 | 557.50 | 13 |
1985-05-15 | Perforation | 552.50 | 553.00 | 13 |
1985-05-15 | Perforation | 545.50 | 546.50 | 13 |
1985-05-15 | Perforation | 542.50 | 544.00 | 13 |
1985-05-15 | Perforation | 520.00 | 523.50 | 13 |
1985-05-15 | Perforation | 497.50 | 498.50 | 13 |
1999-12-10 | Packing Device Capped w/Cement | 487.00 | 495.00 | 0 |
For data sources see[4]