X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0505172906020"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0505172906020
 
| Well ID: 0505172906020
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.3432729, -116.4546811 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.343043, -116.455297 | width=100% | height=100% }}
 +
|-
 +
| Location: 02/06-29-050-17W5/0
 +
|-
 +
| Location Alias: 02/06-29-50-17 W5M
 +
|-
 +
| Location Alias 2: 02/06-29-050-17 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 050
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 17
 +
|-
 +
| Section: 29
 +
|-
 +
| County/Municipality: [[Yellowhead County,_Alberta|Yellowhead County]]
 
|-
 
|-
 
| Well Name: CREW EDSON 6-29-50-17
 
| Well Name: CREW EDSON 6-29-50-17
 
|-
 
|-
| Operator:
+
| Operator Name: [[Crew Energy Inc.]]
 +
|-
 +
| License Number: 0215423
 
|-
 
|-
 
| License Date: 1998-05-26
 
| License Date: 1998-05-26
 
|-
 
|-
| Final Drilling Date: 1998-06-16
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1998-06-07
 +
|-
 +
| Final Drill Date: 1998-06-16
 +
|-
 +
| Well Total Depth: 1700.00 m
 +
|-
 +
| Surface Hole Latitude: 53.343043
 +
|-
 +
| Surface Hole Longitude: -116.455297
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1998-05-26
 +
| Obtained License
 +
|-
 +
| 1998-06-09
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1998-06-16
 +
| Finished Drilling
 +
|-
 +
| 1998-06-16
 +
| Well Log Performed
 +
|-
 +
| 1998-06-17
 +
| Drill Stem Test Performed
 
|-
 
|-
| Total Depth: 1700.0m
+
| 1998-06-17
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 1998-06-18
 +
| Drill Stem Test Performed
 
|-
 
|-
| Status: Abandoned
+
| 1998-06-20
 +
| Production Casing Operation Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 1998-06-20
 +
| Rig Released
 
|-
 
|-
| Configuration: Vertical
+
| 1998-06-20
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Violations:
+
| 1998-07-21
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Latitude: 53.3432729
+
| 1998-07-21
 +
| Well Log Performed
 
|-
 
|-
| Longitude: -116.4546811
+
| 1998-07-22
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1998-07-22
 +
| Well Log Performed
 +
|-
 +
| 2002-12-07
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2002-12-07
 +
| Plug Back Performed
 +
|-
 +
| 2002-12-07
 +
| Well Log Performed
 +
|-
 +
| 2002-12-07
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2002-12-08
 +
| Well Abandoned
 +
|-
 +
| 2002-12-08
 +
| Well Mode changed to Abandoned
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1998-07-21
 +
| Perforation
 +
| style="text-align: right;" | 1657.00
 +
| style="text-align: right;" | 1663.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1998-07-22
 +
| Fracture
 +
| style="text-align: right;" | 1657.00
 +
| style="text-align: right;" | 1663.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-12-07
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1642.00
 +
| style="text-align: right;" | 1650.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:02, 19 January 2021

Well Details

Well ID: 0505172906020
Loading map...
Location: 02/06-29-050-17W5/0
Location Alias: 02/06-29-50-17 W5M
Location Alias 2: 02/06-29-050-17 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 17
Section: 29
County/Municipality: Yellowhead County
Well Name: CREW EDSON 6-29-50-17
Operator Name: Crew Energy Inc.
License Number: 0215423
License Date: 1998-05-26
License Status: RecCertified
Spud Date: 1998-06-07
Final Drill Date: 1998-06-16
Well Total Depth: 1700.00 m
Surface Hole Latitude: 53.343043
Surface Hole Longitude: -116.455297

For data sources see[1][2]

Well History

Date Event
1998-05-26 Obtained License
1998-06-09 Surface Casing Operation Performed
1998-06-16 Finished Drilling
1998-06-16 Well Log Performed
1998-06-17 Drill Stem Test Performed
1998-06-17 Well Log Performed
1998-06-18 Drill Stem Test Performed
1998-06-20 Production Casing Operation Performed
1998-06-20 Rig Released
1998-06-20 Well Mode changed to Drilled and Cased
1998-07-21 Perforation Treatment Performed - Jet Perforation
1998-07-21 Well Log Performed
1998-07-22 Perforation Treatment Performed - Fractured
1998-07-22 Well Log Performed
2002-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-12-07 Plug Back Performed
2002-12-07 Well Log Performed
2002-12-07 Well Mode changed to Abandoned Zone
2002-12-08 Well Abandoned
2002-12-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-07-21 Perforation 1657.00 1663.50 13
1998-07-22 Fracture 1657.00 1663.50 0
2002-12-07 Packing Device Capped w/Cement 1642.00 1650.00 0

For data sources see[4]



References