X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0705230815003"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0705230815003
 
| Well ID: 0705230815003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 55.0521283, -117.4685112 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 55.052130, -117.467722 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/15-08-070-23W5/3
 +
|-
 +
| Location Alias: 00/15-08-70-23 W5M
 +
|-
 +
| Location Alias 2: 00/15-08-070-23 W5/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 070
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 23
 +
|-
 +
| Section: 08
 +
|-
 +
| County/Municipality: [[Sturgeon Lake 154,_Alberta|Sturgeon Lake 154]]
 
|-
 
|-
 
| Well Name: GULF ET AL STURLS 15-8-70-23
 
| Well Name: GULF ET AL STURLS 15-8-70-23
 
|-
 
|-
| Operator:
+
| Operator Name: [[ConocoPhillips Canada Resources Corp.]]
 +
|-
 +
| License Number: 0027227
 
|-
 
|-
 
| License Date: 1964-11-24
 
| License Date: 1964-11-24
 
|-
 
|-
| Final Drilling Date: 1964-12-30
+
| License Status: Re-Entered
 +
|-
 +
| Spud Date: 1964-11-28
 +
|-
 +
| Final Drill Date: 1964-12-30
 +
|-
 +
| Well Total Depth: 2673.10 m
 +
|-
 +
| Surface Hole Latitude: 55.052130
 +
|-
 +
| Surface Hole Longitude: -117.467722
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1964-11-24
 +
| Obtained License
 +
|-
 +
| 1964-12-30
 +
| Finished Drilling
 +
|-
 +
| 1964-12-30
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1964-12-31
 +
| Production Casing Operation Performed
 +
|-
 +
| 1965-01-05
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1965-01-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1965-01-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1965-01-13
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1965-01-13
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1975-08-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1975-08-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1975-08-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1975-08-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1975-08-16
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1975-08-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1976-04-26
 +
| Well Began Production
 +
|-
 +
| 1976-04-26
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1976-04-26
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1977-01-01
 +
| Well Structure changed to Commingled
 +
|-
 +
| 1985-01-26
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1985-01-26
 +
| Plug Back Performed
 +
|-
 +
| 1985-01-26
 +
| Well Abandoned
 +
|-
 +
| 1986-01-25
 +
| Well Log Performed
 +
|-
 +
| 1986-02-06
 +
| Well Log Performed
 +
|-
 +
| 1986-02-07
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1965-01-05
 +
| Perforation
 +
| style="text-align: right;" | 2662.10
 +
| style="text-align: right;" | 2662.70
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1975-08-12
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1508.80
 +
| style="text-align: right;" | 1509.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-08-12
 +
| Perforation
 +
| style="text-align: right;" | 1444.80
 +
| style="text-align: right;" | 1445.10
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Total Depth: 2673.1m
+
| 1975-08-12
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1444.80
 +
| style="text-align: right;" | 1445.10
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 1975-08-12
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1444.80
 +
| style="text-align: right;" | 1445.10
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Not Applicable
+
| 1975-08-16
 +
| Perforation
 +
| style="text-align: right;" | 1452.40
 +
| style="text-align: right;" | 1455.40
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Well Type: Not Applicable
+
| 1975-08-20
 +
| Perforation
 +
| style="text-align: right;" | 1433.20
 +
| style="text-align: right;" | 1435.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Configuration: Vertical
+
| 1975-08-20
 +
| Perforation
 +
| style="text-align: right;" | 1436.20
 +
| style="text-align: right;" | 1437.40
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Violations:
+
| 1985-01-26
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1422.00
 +
| style="text-align: right;" | 1430.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 55.0521283
+
| 1965-01-05
 +
| Acid Treatment
 +
| style="text-align: right;" | 2662.10
 +
| style="text-align: right;" | 2662.70
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -117.4685112
+
| 1965-01-11
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2662.10
 +
| style="text-align: right;" | 2662.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-01-13
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2661.20
 +
| style="text-align: right;" | 2661.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1965-01-13
 +
| Bullet Perforation
 +
| style="text-align: right;" | 2662.70
 +
| style="text-align: right;" | 2663.00
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1965-01-13
 +
| Acid Treatment
 +
| style="text-align: right;" | 2661.20
 +
| style="text-align: right;" | 2663.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-08-09
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2661.20
 +
| style="text-align: right;" | 2663.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-08-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2563.40
 +
| style="text-align: right;" | 2563.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-08-12
 +
| Perforation
 +
| style="text-align: right;" | 1508.80
 +
| style="text-align: right;" | 1509.10
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1976
 +
| style="text-align: right;" | 2039
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 19:24, 19 January 2021

Well Details

Well ID: 0705230815003
Loading map...
Location: 00/15-08-070-23W5/3
Location Alias: 00/15-08-70-23 W5M
Location Alias 2: 00/15-08-070-23 W5/03
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 23
Section: 08
County/Municipality: Sturgeon Lake 154
Well Name: GULF ET AL STURLS 15-8-70-23
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0027227
License Date: 1964-11-24
License Status: Re-Entered
Spud Date: 1964-11-28
Final Drill Date: 1964-12-30
Well Total Depth: 2673.10 m
Surface Hole Latitude: 55.052130
Surface Hole Longitude: -117.467722

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-11-24 Obtained License
1964-12-30 Finished Drilling
1964-12-30 Well Mode changed to Drilled and Cased
1964-12-31 Production Casing Operation Performed
1965-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-05 Perforation Treatment Performed - Jet Perforation
1965-01-11 Perforation Treatment Performed - Cement Squeeze
1965-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-13 Perforation Treatment Performed - Bullet Perforation
1975-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-08-09 Perforation Treatment Performed - Cement Squeeze
1975-08-12 Perforation Treatment Performed - Cement Squeeze
1975-08-12 Perforation Treatment Performed - Jet Perforation
1975-08-16 Perforation Treatment Performed - Jet Perforation
1975-08-20 Perforation Treatment Performed - Jet Perforation
1976-04-26 Well Began Production
1976-04-26 Well Fluid changed to Gas
1976-04-26 Well Mode changed to Flowing
1977-01-01 Well Structure changed to Commingled
1985-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-01-26 Plug Back Performed
1985-01-26 Well Abandoned
1986-01-25 Well Log Performed
1986-02-06 Well Log Performed
1986-02-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-01-05 Perforation 2662.10 2662.70 7
1975-08-12 Cement Squeeze 1508.80 1509.10 0
1975-08-12 Perforation 1444.80 1445.10 13
1975-08-12 Cement Squeeze 1444.80 1445.10 0
1975-08-12 Cement Squeeze 1444.80 1445.10 0
1975-08-16 Perforation 1452.40 1455.40 13
1975-08-20 Perforation 1433.20 1435.00 13
1975-08-20 Perforation 1436.20 1437.40 13
1985-01-26 Packing Device Capped w/Cement 1422.00 1430.00 0
1965-01-05 Acid Treatment 2662.10 2662.70 0
1965-01-11 Cement Squeeze 2662.10 2662.70 0
1965-01-13 Bullet Perforation 2661.20 2661.80 13
1965-01-13 Bullet Perforation 2662.70 2663.00 7
1965-01-13 Acid Treatment 2661.20 2663.00 0
1975-08-09 Cement Squeeze 2661.20 2663.00 0
1975-08-09 Packing Device Capped w/Cement 2563.40 2563.40 0
1975-08-12 Perforation 1508.80 1509.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2039 0.0 0.0 0.0

For data sources see[5]

References