If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 210: | Line 210: | ||
| style="text-align: right;" | 764.00 | | style="text-align: right;" | 764.00 | ||
| style="text-align: right;" | 18 | | style="text-align: right;" | 18 | ||
+ | |- | ||
+ | | 2005-09-26 | ||
+ | | Packing Dev Cpd w/Res-Gyp Cem | ||
+ | | style="text-align: right;" | 768.00 | ||
+ | | style="text-align: right;" | 770.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2005-09-26 | ||
+ | | Cement Plug | ||
+ | | style="text-align: right;" | 747.00 | ||
+ | | style="text-align: right;" | 755.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2005-09-27 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 390.00 | ||
+ | | style="text-align: right;" | 391.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2008-06-12 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 532.00 | ||
+ | | style="text-align: right;" | 540.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2008-06-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 390.00 | ||
+ | | style="text-align: right;" | 392.00 | ||
+ | | style="text-align: right;" | 20 | ||
+ | |- | ||
+ | | 2008-06-12 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 514.00 | ||
+ | | style="text-align: right;" | 515.00 | ||
+ | | style="text-align: right;" | 20 | ||
|- | |- | ||
| 1996-01-27 | | 1996-01-27 | ||
Line 258: | Line 294: | ||
| style="text-align: right;" | 546.00 | | style="text-align: right;" | 546.00 | ||
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
Line 423: | Line 423: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0845252516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.317957,"lon":-117.799316,"icon":""}]} |
Location: 00/16-25-084-25W5/0 | |
Location Alias: 00/16-25-84-25 W5M | |
Location Alias 2: 00/16-25-084-25 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 084 | |
Meridian: 5 | |
Range: 25 | |
Section: 25 | |
County/Municipality: County of Northern Lights | |
Well Name: CANAMAX LEDDY 16-25-84-25 | |
Operator Name: Canamax Energy Ltd. | |
License Number: 0182194 | |
License Date: 1995-11-16 | |
License Status: Suspension | |
Spud Date: 1995-12-03 | |
Final Drill Date: 1995-12-06 | |
Well Total Depth: 930.00 m | |
Surface Hole Latitude: 56.317957 | |
Surface Hole Longitude: -117.799316 |
Date | Event |
---|---|
1995-11-16 | Obtained License |
1995-12-03 | Surface Casing Operation Performed |
1995-12-03 | Well Log Performed |
1995-12-06 | Finished Drilling |
1995-12-06 | Well Mode changed to Drilled and Cased |
1995-12-07 | Well Log Performed |
1995-12-08 | Drill Stem Test Performed |
1995-12-10 | Production Casing Operation Performed |
1995-12-10 | Rig Released |
1996-01-24 | Well Log Performed |
1996-01-26 | Perforation Treatment Performed - Jet Perforation |
1996-01-26 | Well Log Performed |
1996-01-27 | Perforation Treatment Performed - Jet Perforation |
1996-05-30 | Well Began Production |
1996-05-30 | Well Fluid changed to Gas |
1996-05-30 | Well Mode changed to Flowing |
2001-03-17 | Well Fluid changed to Gas |
2001-03-17 | Well Mode changed to Flowing |
2001-03-18 | Well Log Performed |
2001-03-19 | Perforation Treatment Performed - Jet Perforation |
2001-03-21 | Well Fluid changed to Gas |
2001-03-21 | Well Mode changed to Suspended |
2003-07-06 | Well Fluid changed to Gas |
2003-07-06 | Well Mode changed to Flowing |
2005-07-06 | Perforation Treatment Performed - Jet Perforation |
2005-07-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-07 | Plug Back Performed |
2005-07-08 | Perforation Treatment Performed - Jet Perforation |
2005-09-26 | Perforation Treatment Performed - Cement Plug |
2005-09-26 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2005-09-26 | Plug Back Performed |
2005-09-27 | Perforation Treatment Performed - Jet Perforation |
2007-04-30 | Well Fluid changed to Gas |
2007-04-30 | Well Mode changed to Suspended |
2008-06-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-06-12 | Perforation Treatment Performed - Jet Perforation |
2008-06-12 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-01-26 | Perforation | 759.20 | 764.00 | 18 |
2005-09-26 | Packing Dev Cpd w/Res-Gyp Cem | 768.00 | 770.50 | 0 |
2005-09-26 | Cement Plug | 747.00 | 755.00 | 0 |
2005-09-27 | Perforation | 390.00 | 391.00 | 17 |
2008-06-12 | Packing Device Capped w/Cement | 532.00 | 540.00 | 0 |
2008-06-12 | Perforation | 390.00 | 392.00 | 20 |
2008-06-12 | Perforation | 514.00 | 515.00 | 20 |
1996-01-27 | Perforation | 790.20 | 793.00 | 18 |
1996-01-27 | Perforation | 799.00 | 803.00 | 18 |
2001-03-19 | Perforation | 771.00 | 772.50 | 17 |
2005-07-06 | Perforation | 842.00 | 843.00 | 13 |
2005-07-07 | Packing Device Capped w/Cement | 781.00 | 789.00 | 0 |
2005-07-07 | Packing Device Capped w/Cement | 833.00 | 841.00 | 0 |
2005-07-08 | Perforation | 767.00 | 768.00 | 17 |
2005-07-08 | Perforation | 545.00 | 546.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 4978 | 0.0 | 0.0 | 0.0 |
1997 | 8404 | 0.0 | 0.0 | 0.0 |
1998 | 7605 | 0.0 | 0.0 | 0.0 |
1999 | 8039 | 0.0 | 0.0 | 0.0 |
2000 | 8319 | 0.0 | 0.0 | 0.0 |
2001 | 1147 | 0.0 | 0.0 | 0.0 |
2002 | 556 | 0.0 | 0.0 | 0.0 |
2003 | 4272 | 0.0 | 0.0 | 0.0 |
2004 | 744 | 0.0 | 0.0 | 0.0 |
2005 | 746 | 0.0 | 0.0 | 0.0 |
For data sources see[5]