X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0174121801000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0174121801000
 
| Well ID: 0174121801000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 50.4282177, -111.6342671 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 50.428374, -111.634238 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/01-18-017-12W4/0
 +
|-
 +
| Location Alias: 00/01-18-17-12 W4M
 +
|-
 +
| Location Alias 2: 00/01-18-017-12 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 017
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 12
 +
|-
 +
| Section: 18
 +
|-
 +
| County/Municipality: [[County of Newell,_Alberta|County of Newell]]
 
|-
 
|-
 
| Well Name: NORTHWEST-TILLEY NO. 1
 
| Well Name: NORTHWEST-TILLEY NO. 1
 
|-
 
|-
| Operator:
+
| Operator Name: [[172746 Canada Inc.]]
 +
|-
 +
| License Number: B0000265
 
|-
 
|-
 
| License Date: 1941-12-11
 
| License Date: 1941-12-11
 
|-
 
|-
| Final Drilling Date: 1942-01-19
+
| License Status: RecExempt
 +
|-
 +
| Spud Date: 1941-12-22
 +
|-
 +
| Final Drill Date: 1942-01-19
 +
|-
 +
| Well Total Depth: 978.10 m
 +
|-
 +
| Surface Hole Latitude: 50.428374
 +
|-
 +
| Surface Hole Longitude: -111.634238
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1941-12-11
 +
| Obtained License
 +
|-
 +
| 1942-01-19
 +
| Finished Drilling
 +
|-
 +
| 1942-01-20
 +
| Drill Stem Test Performed
 +
|-
 +
| 1942-01-22
 +
| Production Casing Operation Performed
 +
|-
 +
| 1942-01-28
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1942-01-29
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1942-01-30
 +
| Perforation Treatment Performed - Bullet Perforation
 
|-
 
|-
| Total Depth: 978.1m
+
| 1942-01-30
 +
| Perforation Treatment Performed - Selective Bullet Perforations
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 1942-02-10
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Status: Abandoned
+
| 1942-04-27
 +
| Perforation Treatment Performed - Bullet Perforation
 
|-
 
|-
| Well Type: Not Applicable
+
| 1942-04-27
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Configuration: Vertical
+
| 1942-05-08
 +
| Perforation Treatment Performed - Bullet Perforation
 
|-
 
|-
| Violations:
+
| 1942-05-10
 +
| Perforation Treatment Performed - Cement Plug
 
|-
 
|-
| Latitude: 50.4282177
+
| 1942-05-21
 +
| Well Abandoned
 
|-
 
|-
| Longitude: -111.6342671
+
| 1942-05-21
 +
| Well Mode changed to Abandoned
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1942-01-28
 +
| Bullet Perforation
 +
| style="text-align: right;" | 976.60
 +
| style="text-align: right;" | 976.90
 +
| style="text-align: right;" | 16
 +
|-
 +
| 1942-05-10
 +
| Cement Plug
 +
| style="text-align: right;" | 643.10
 +
| style="text-align: right;" | 732.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1942-01-28
 +
| Bullet Perforation
 +
| style="text-align: right;" | 976.30
 +
| style="text-align: right;" | 976.60
 +
| style="text-align: right;" | 16
 +
|-
 +
| 1942-01-29
 +
| Acid Wash
 +
| style="text-align: right;" | 976.30
 +
| style="text-align: right;" | 976.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1942-01-30
 +
| Bullet Perforation
 +
| style="text-align: right;" | 974.80
 +
| style="text-align: right;" | 976.00
 +
| style="text-align: right;" | 16
 +
|-
 +
| 1942-01-30
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 974.80
 +
| style="text-align: right;" | 976.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1942-02-10
 +
| Cement Squeeze
 +
| style="text-align: right;" | 972.30
 +
| style="text-align: right;" | 976.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1942-04-27
 +
| Bullet Perforation
 +
| style="text-align: right;" | 965.00
 +
| style="text-align: right;" | 966.20
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1942-04-27
 +
| Cement Squeeze
 +
| style="text-align: right;" | 965.00
 +
| style="text-align: right;" | 966.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1942-05-08
 +
| Bullet Perforation
 +
| style="text-align: right;" | 797.10
 +
| style="text-align: right;" | 797.10
 +
| style="text-align: right;" | 10
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 22:59, 19 January 2021

Well Details

Well ID: 0174121801000
Loading map...
Location: 00/01-18-017-12W4/0
Location Alias: 00/01-18-17-12 W4M
Location Alias 2: 00/01-18-017-12 W4/00
Country: Canada
Province: Alberta
Township: 017
Meridian: 4
Range: 12
Section: 18
County/Municipality: County of Newell
Well Name: NORTHWEST-TILLEY NO. 1
Operator Name: 172746 Canada Inc.
License Number: B0000265
License Date: 1941-12-11
License Status: RecExempt
Spud Date: 1941-12-22
Final Drill Date: 1942-01-19
Well Total Depth: 978.10 m
Surface Hole Latitude: 50.428374
Surface Hole Longitude: -111.634238

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1941-12-11 Obtained License
1942-01-19 Finished Drilling
1942-01-20 Drill Stem Test Performed
1942-01-22 Production Casing Operation Performed
1942-01-28 Perforation Treatment Performed - Bullet Perforation
1942-01-29 Perforation Treatment Performed - Acid Wash - No Pressure
1942-01-30 Perforation Treatment Performed - Bullet Perforation
1942-01-30 Perforation Treatment Performed - Selective Bullet Perforations
1942-02-10 Perforation Treatment Performed - Cement Squeeze
1942-04-27 Perforation Treatment Performed - Bullet Perforation
1942-04-27 Perforation Treatment Performed - Cement Squeeze
1942-05-08 Perforation Treatment Performed - Bullet Perforation
1942-05-10 Perforation Treatment Performed - Cement Plug
1942-05-21 Well Abandoned
1942-05-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1942-01-28 Bullet Perforation 976.60 976.90 16
1942-05-10 Cement Plug 643.10 732.10 0
1942-01-28 Bullet Perforation 976.30 976.60 16
1942-01-29 Acid Wash 976.30 976.90 0
1942-01-30 Bullet Perforation 974.80 976.00 16
1942-01-30 Selective Bullet Perforations 974.80 976.00 0
1942-02-10 Cement Squeeze 972.30 976.00 0
1942-04-27 Bullet Perforation 965.00 966.20 7
1942-04-27 Cement Squeeze 965.00 966.20 0
1942-05-08 Bullet Perforation 797.10 797.10 10

For data sources see[4]



References