If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 215: | Line 215: | ||
| style="text-align: right;" | 1479.80 | | style="text-align: right;" | 1479.80 | ||
| style="text-align: right;" | 1561.50 | | style="text-align: right;" | 1561.50 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1991-07-16 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1177.00 | ||
+ | | style="text-align: right;" | 1180.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1991-07-18 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1157.00 | ||
+ | | style="text-align: right;" | 1165.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1991-07-22 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1039.00 | ||
+ | | style="text-align: right;" | 1041.00 | ||
+ | | style="text-align: right;" | 14 | ||
+ | |- | ||
+ | | 1991-08-14 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 1039.00 | ||
+ | | style="text-align: right;" | 1041.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1996-09-10 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1018.00 | ||
+ | | style="text-align: right;" | 1026.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 264: | Line 294: | ||
| style="text-align: right;" | 1180.00 | | style="text-align: right;" | 1180.00 | ||
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
Line 481: | Line 481: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0524262207000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.50306,"lon":-113.747257,"icon":""}]} |
Location: 00/07-22-052-26W4/0 | |
Location Alias: 00/07-22-52-26 W4M | |
Location Alias 2: 00/07-22-052-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 26 | |
Section: 22 | |
County/Municipality: Stony Plain 135 | |
Well Name: CHEVRON ACHESON 7-22-52-26 | |
Operator Name: Chevron Canada Limited | |
License Number: 0003761 | |
License Date: 1951-11-10 | |
License Status: RecExempt | |
Spud Date: 1951-11-27 | |
Final Drill Date: 1952-02-18 | |
Well Total Depth: 1561.50 m | |
Surface Hole Latitude: 53.503060 | |
Surface Hole Longitude: -113.747257 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-11-10 | Obtained License |
1951-11-27 | Direction Drilling Operation Performed - 98 |
1952-01-25 | Lost Circulation Occurred |
1952-02-07 | Liner Casing Operation Performed |
1952-02-18 | Finished Drilling |
1952-02-18 | Perforation Treatment Performed - Open-Hole Completion |
1952-02-18 | Well Mode changed to Drilled and Cased |
1952-02-20 | Well Began Production |
1952-02-20 | Well Fluid changed to Crude Oil |
1952-02-20 | Well Mode changed to Flowing |
1952-02-24 | Well Log Performed |
1972-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-01-30 | Perforation Treatment Performed - Cement Plug |
1975-01-31 | Perforation Treatment Performed - Jet Perforation |
1978-05-01 | Well Fluid changed to Crude Oil |
1978-05-01 | Well Mode changed to Suspended |
1983-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-08-16 | Perforation Treatment Performed - Jet Perforation |
1983-08-17 | Perforation Treatment Performed - Jet Perforation |
1983-08-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-08-19 | Perforation Treatment Performed - Jet Perforation |
1983-08-19 | Well Fluid changed to Crude Oil |
1983-08-19 | Well Mode changed to Abandoned Zone |
1991-07-16 | Perforation Treatment Performed - Cement Squeeze |
1991-07-16 | Plug Back Performed |
1991-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-07-18 | Plug Back Performed |
1991-07-18 | Well Log Performed |
1991-07-22 | Perforation Treatment Performed - Jet Perforation |
1991-07-22 | Well Log Performed |
1991-08-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-09-10 | Plug Back Performed |
1996-09-14 | Well Log Performed |
1996-09-27 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1951-11-27 | 1047.30 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-02-18 | Open Hole/Barefoot Completion | 1479.80 | 1561.50 | 0 |
1991-07-16 | Cement Squeeze | 1177.00 | 1180.00 | 0 |
1991-07-18 | Packing Device Capped w/Cement | 1157.00 | 1165.00 | 0 |
1991-07-22 | Perforation | 1039.00 | 1041.00 | 14 |
1991-08-14 | Acid Treatment | 1039.00 | 1041.00 | 0 |
1996-09-10 | Packing Device Capped w/Cement | 1018.00 | 1026.00 | 0 |
1972-11-15 | Acid Treatment | 1554.50 | 1561.50 | 0 |
1975-01-30 | Cement Plug | 1555.40 | 1561.50 | 0 |
1975-01-31 | Perforation | 1553.60 | 1554.80 | 13 |
1983-08-12 | Packing Device Capped w/Cement | 1349.50 | 1351.50 | 0 |
1983-08-16 | Perforation | 1343.00 | 1345.00 | 13 |
1983-08-17 | Perforation | 1335.00 | 1337.00 | 13 |
1983-08-19 | Packing Device Capped w/Cement | 1305.20 | 1305.20 | 0 |
1983-08-19 | Perforation | 1177.00 | 1180.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 5416 | 0.0 | 0.0 | 0.0 |
1968 | 4824 | 0.0 | 0.0 | 0.0 |
1969 | 6285 | 0.0 | 0.0 | 0.0 |
1970 | 6634 | 0.0 | 0.0 | 0.0 |
1971 | 4203 | 0.0 | 0.0 | 0.0 |
1972 | 6020 | 0.0 | 0.0 | 0.0 |
1973 | 4540 | 0.0 | 0.0 | 0.0 |
1974 | 5145 | 0.0 | 0.0 | 0.0 |
1975 | 7617 | 0.0 | 0.0 | 0.0 |
1976 | 8472 | 0.0 | 0.0 | 0.0 |
1977 | 8440 | 0.0 | 0.0 | 0.0 |
1978 | 1656 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1952-01-25 | Lost Circulation | 1484.10 | 1484.10 |
For data sources see[7]