X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0524262209000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0524262209000
 
| Well ID: 0524262209000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.506672, -113.7412217 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.506663, -113.741188 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: 1107882 ACC ACHESON 9-22-52-26
+
| Location: 00/09-22-052-26W4/0
 
|-
 
|-
| Operator:
+
| Location Alias: 00/09-22-52-26 W4M
 +
|-
 +
| Location Alias 2: 00/09-22-052-26 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 052
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 22
 +
|-
 +
| County/Municipality: [[Stony Plain 135,_Alberta|Stony Plain 135]]
 +
|-
 +
| Well Name: CEDAR CREEK ACH 9-22-52-26
 +
|-
 +
| Operator Name: [[MAGA Energy Operations Ltd.]]
 +
|-
 +
| License Number: 0003922
 
|-
 
|-
 
| License Date: 1951-12-10
 
| License Date: 1951-12-10
 
|-
 
|-
| Final Drilling Date: 1952-03-22
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 1952-02-25
 +
|-
 +
| Final Drill Date: 1952-03-22
 +
|-
 +
| Well Total Depth: 1556.30 m
 +
|-
 +
| Surface Hole Latitude: 53.506663
 +
|-
 +
| Surface Hole Longitude: -113.741188
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Total Depth: 1556.3m
+
| 1909-09-09
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1951-12-10
 +
| Obtained License
 
|-
 
|-
| Status: Abandoned Zone
+
| 1952-03-05
 +
| Drill Stem Test Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 1952-03-06
 +
| Drill Stem Test Performed
 
|-
 
|-
| Configuration: Vertical
+
| 1952-03-07
 +
| Drill Stem Test Performed
 
|-
 
|-
| Violations:
+
| 1952-03-08
 +
| Drill Stem Test Performed
 
|-
 
|-
| Latitude: 53.506672
+
| 1952-03-15
 +
| Liner Casing Operation Performed
 
|-
 
|-
| Longitude: -113.7412217
+
| 1952-03-19
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-03-22
 +
| Finished Drilling
 +
|-
 +
| 1952-03-22
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1952-03-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1952-08-20
 +
| Well Began Production
 +
|-
 +
| 1952-08-20
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1952-08-20
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1971-11-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1971-11-22
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1971-11-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-09-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1979-05-30
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1979-05-30
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1980-01-31
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1980-02-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-02-09
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1980-02-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1980-02-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-02-12
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1984-02-22
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1984-02-22
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1996-05-08
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1996-05-08
 +
| Plug Back Performed
 +
|-
 +
| 1996-05-08
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1996-05-08
 +
| Well Log Performed
 +
|-
 +
| 1996-05-08
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1996-05-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-05-10
 +
| Well Log Performed
 +
|-
 +
| 1996-05-11
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2015-02-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2015-02-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2015-02-24
 +
| Plug Back Performed
 +
|-
 +
| 2015-02-24
 +
| Well Log Performed
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1952-03-26
 +
| Perforation
 +
| style="text-align: right;" | 1548.10
 +
| style="text-align: right;" | 1554.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1980-02-11
 +
| Perforation
 +
| style="text-align: right;" | 1543.50
 +
| style="text-align: right;" | 1544.20
 +
| style="text-align: right;" | 6
 +
|-
 +
| 1980-02-12
 +
| Acid Treatment
 +
| style="text-align: right;" | 1543.50
 +
| style="text-align: right;" | 1544.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-05-08
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1530.00
 +
| style="text-align: right;" | 1538.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-05-10
 +
| Perforation
 +
| style="text-align: right;" | 1242.00
 +
| style="text-align: right;" | 1243.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1996-05-11
 +
| Fracture
 +
| style="text-align: right;" | 1242.00
 +
| style="text-align: right;" | 1243.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-02-23
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1238.10
 +
| style="text-align: right;" | 1249.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-02-24
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1224.00
 +
| style="text-align: right;" | 1232.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1971-11-20
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1550.20
 +
| style="text-align: right;" | 1556.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1971-11-22
 +
| Perforation
 +
| style="text-align: right;" | 1544.70
 +
| style="text-align: right;" | 1549.90
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1971-11-22
 +
| Acid Treatment
 +
| style="text-align: right;" | 1544.70
 +
| style="text-align: right;" | 1549.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1977-09-14
 +
| Acid Treatment
 +
| style="text-align: right;" | 1544.70
 +
| style="text-align: right;" | 1547.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-01-31
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1544.70
 +
| style="text-align: right;" | 1547.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-02-08
 +
| Perforation
 +
| style="text-align: right;" | 1543.50
 +
| style="text-align: right;" | 1544.20
 +
| style="text-align: right;" | 6
 +
|-
 +
| 1980-02-09
 +
| Acid Wash
 +
| style="text-align: right;" | 1543.50
 +
| style="text-align: right;" | 1544.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-02-10
 +
| Acid Treatment
 +
| style="text-align: right;" | 1543.50
 +
| style="text-align: right;" | 1544.20
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1961
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1962
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1966
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1967
 +
| style="text-align: right;" | 6281
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1968
 +
| style="text-align: right;" | 6194
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1969
 +
| style="text-align: right;" | 7328
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1970
 +
| style="text-align: right;" | 5992
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1971
 +
| style="text-align: right;" | 7529
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1972
 +
| style="text-align: right;" | 6722
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1973
 +
| style="text-align: right;" | 6541
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1974
 +
| style="text-align: right;" | 6526
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1975
 +
| style="text-align: right;" | 6108
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1976
 +
| style="text-align: right;" | 5848
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1977
 +
| style="text-align: right;" | 7089
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1978
 +
| style="text-align: right;" | 6547
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1979
 +
| style="text-align: right;" | 8441
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1980
 +
| style="text-align: right;" | 2303
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2015-02-24
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 02:20, 20 January 2021

Well Details

Well ID: 0524262209000
Loading map...
Location: 00/09-22-052-26W4/0
Location Alias: 00/09-22-52-26 W4M
Location Alias 2: 00/09-22-052-26 W4/00
Country: Canada
Province: Alberta
Township: 052
Meridian: 4
Range: 26
Section: 22
County/Municipality: Stony Plain 135
Well Name: CEDAR CREEK ACH 9-22-52-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003922
License Date: 1951-12-10
License Status: Suspension
Spud Date: 1952-02-25
Final Drill Date: 1952-03-22
Well Total Depth: 1556.30 m
Surface Hole Latitude: 53.506663
Surface Hole Longitude: -113.741188

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-10 Obtained License
1952-03-05 Drill Stem Test Performed
1952-03-06 Drill Stem Test Performed
1952-03-07 Drill Stem Test Performed
1952-03-08 Drill Stem Test Performed
1952-03-15 Liner Casing Operation Performed
1952-03-19 Drill Stem Test Performed
1952-03-22 Finished Drilling
1952-03-22 Well Mode changed to Drilled and Cased
1952-03-26 Perforation Treatment Performed - Jet Perforation
1952-08-20 Well Began Production
1952-08-20 Well Fluid changed to Crude Oil
1952-08-20 Well Mode changed to Flowing
1971-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1971-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-11-22 Perforation Treatment Performed - Jet Perforation
1977-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-30 Well Fluid changed to Crude Oil
1979-05-30 Well Mode changed to Pumping
1980-01-31 Perforation Treatment Performed - Cement Squeeze
1980-02-08 Perforation Treatment Performed - Jet Perforation
1980-02-09 Perforation Treatment Performed - Acid Wash - No Pressure
1980-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-11 Perforation Treatment Performed - Jet Perforation
1980-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-22 Well Fluid changed to Crude Oil
1984-02-22 Well Mode changed to Suspended
1996-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-08 Plug Back Performed
1996-05-08 Well Fluid changed to Crude Oil
1996-05-08 Well Log Performed
1996-05-08 Well Mode changed to Abandoned Zone
1996-05-10 Perforation Treatment Performed - Jet Perforation
1996-05-10 Well Log Performed
1996-05-11 Perforation Treatment Performed - Fractured
2015-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-24 Plug Back Performed
2015-02-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-03-26 Perforation 1548.10 1554.20 13
1980-02-11 Perforation 1543.50 1544.20 6
1980-02-12 Acid Treatment 1543.50 1544.20 0
1996-05-08 Packing Device Capped w/Cement 1530.00 1538.00 0
1996-05-10 Perforation 1242.00 1243.50 13
1996-05-11 Fracture 1242.00 1243.50 0
2015-02-23 Packing Device Capped w/Cement 1238.10 1249.00 0
2015-02-24 Packing Device Capped w/Cement 1224.00 1232.00 0
1971-11-20 Packing Device Capped w/Cement 1550.20 1556.30 0
1971-11-22 Perforation 1544.70 1549.90 7
1971-11-22 Acid Treatment 1544.70 1549.90 0
1977-09-14 Acid Treatment 1544.70 1547.20 0
1980-01-31 Cement Squeeze 1544.70 1547.20 0
1980-02-08 Perforation 1543.50 1544.20 6
1980-02-09 Acid Wash 1543.50 1544.20 0
1980-02-10 Acid Treatment 1543.50 1544.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6281 0.0 0.0 0.0
1968 6194 0.0 0.0 0.0
1969 7328 0.0 0.0 0.0
1970 5992 0.0 0.0 0.0
1971 7529 0.0 0.0 0.0
1972 6722 0.0 0.0 0.0
1973 6541 0.0 0.0 0.0
1974 6526 0.0 0.0 0.0
1975 6108 0.0 0.0 0.0
1976 5848 0.0 0.0 0.0
1977 7089 0.0 0.0 0.0
1978 6547 0.0 0.0 0.0
1979 8441 0.0 0.0 0.0
1980 2303 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References