If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
(Created page with "{| class="wikitable" ! Date Received ! Date Disposed ! Site Name ! Operator Name ! Permit # ! Coordinates ! Township/Municipality ! County ! Wells Served |- | 06/29/2010 | 7/3...") |
m |
||
(6 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | {| class="wikitable" | + | __TOC__ |
− | ! | + | The Ross Unit 1H Dam, or the Doerfler Centralized Impoundment Dam is a [[Centralized Impoundments|centralized impoundment]] used to collect and store fracturing fluids from the [[37-125-24008|Ross Unit 1H well]] and future wells in the area.<ref>http://www.pabulletin.com/secure/data/vol40/40-33/1486c.html</ref> |
− | + | ||
− | + | {| class="wikitable welldetails" width="95%" | |
− | ! Operator Name | + | ! Impoundment: |
− | ! Permit # | + | | Doerfler Impoundment Dam |
− | + | | style="height=100%; align=right" rowspan="12" | {{#display_map: N 40° 05` 33.21" W 79° 58` 04.35" | width=100% | height=100% | service="google" }} | |
− | + | |- | |
− | + | ! Operator Name: | |
− | + | | [[ANTERO RESOURCES CORP]] | |
+ | |- | ||
+ | ! Permit #: | ||
+ | | 95-7-38986-11 | ||
|- | |- | ||
+ | ! Permit Date Recieved: | ||
| 06/29/2010 | | 06/29/2010 | ||
+ | |- | ||
+ | ! Permit Date Disposed: | ||
| 7/30/2012 | | 7/30/2012 | ||
− | | | + | |- |
− | + | ! Municipality: | |
− | |||
− | |||
| [[West Pike Run Township, Washington County, Pennsylvania|West Pike Run]] | | [[West Pike Run Township, Washington County, Pennsylvania|West Pike Run]] | ||
+ | |- | ||
+ | ! County: | ||
| [[Washington County, Pennsylvania|Washington]] | | [[Washington County, Pennsylvania|Washington]] | ||
+ | |- | ||
+ | ! State: | ||
+ | | Pennsylvania | ||
+ | |- | ||
+ | ! Latitude: | ||
+ | | N 40.092558 | ||
+ | |- | ||
+ | ! Longitude: | ||
+ | | W 79.967875 | ||
+ | |- | ||
+ | ! Associated Well Pads: | ||
+ | | [[148263]] | ||
+ | |- | ||
+ | ! Associated Wells: | ||
| [[37-125-24008]] | | [[37-125-24008]] | ||
|} | |} | ||
Line 61: | Line 81: | ||
==References== | ==References== | ||
{{reflist}} | {{reflist}} | ||
+ | |||
+ | [[Category:Impoundments]] |
The Ross Unit 1H Dam, or the Doerfler Centralized Impoundment Dam is a centralized impoundment used to collect and store fracturing fluids from the Ross Unit 1H well and future wells in the area.[1]
Impoundment: | Doerfler Impoundment Dam | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[]} |
---|---|---|
Operator Name: | ANTERO RESOURCES CORP | |
Permit #: | 95-7-38986-11 | |
Permit Date Recieved: | 06/29/2010 | |
Permit Date Disposed: | 7/30/2012 | |
Municipality: | West Pike Run | |
County: | Washington | |
State: | Pennsylvania | |
Latitude: | N 40.092558 | |
Longitude: | W 79.967875 | |
Associated Well Pads: | 148263 | |
Associated Wells: | 37-125-24008 |
Violation ID | Date | Violation Description | Status | Penalty Amount Paid |
---|---|---|---|---|
605622 | 02/17/2011 | Failure to properly control or dispose of industrial or residual waste. | Corrected/Abated | N/A |
605621 | 02/17/2011 | Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Corrected/Abated | N/A |
605623 | 02/17/2011 | Failure to maintain 2 ' of freeboard in an impoundment. | Corrected/Abated | N/A |
Source: PA DEP eFacts.[2]
|accessdate=
(help)Category:CS1 errors: dates