If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0244272606000 | | Well ID: 0244272606000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 51.073818, -113.668316 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/06-26-024-27W4/0 | | Location: 00/06-26-024-27W4/0 | ||
|- | |- | ||
− | | Well Name: | + | | Location Alias: 00/06-26-24-27 W4M |
+ | |- | ||
+ | | Location Alias 2: 00/06-26-024-27 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 024 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 27 | ||
+ | |- | ||
+ | | Section: 26 | ||
+ | |- | ||
+ | | County/Municipality: [[Rocky View County,_Alberta|Rocky View County]] | ||
+ | |- | ||
+ | | Well Name: EMBER ENTICE 6-26-24-27 | ||
+ | |- | ||
+ | | Operator Name: [[Ember Resources Inc.]] | ||
+ | |- | ||
+ | | License Number: 0265868 | ||
|- | |- | ||
| License Date: 2002-01-10 | | License Date: 2002-01-10 | ||
|- | |- | ||
− | | | + | | License Status: Issued |
|- | |- | ||
− | | | + | | Spud Date: 2002-01-18 |
|- | |- | ||
− | | | + | | Final Drill Date: 2002-01-24 |
|- | |- | ||
− | | | + | | Well Total Depth: 1141.00 m |
|- | |- | ||
− | | | + | | Surface Hole Latitude: 51.073818 |
|- | |- | ||
− | | | + | | Surface Hole Longitude: -113.668316 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
|- | |- | ||
− | | | + | | 2002-01-10 |
+ | | Obtained License | ||
|- | |- | ||
− | | | + | | 2002-01-18 |
+ | | Surface Casing Operation Performed | ||
|- | |- | ||
+ | | 2002-01-24 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 2002-01-25 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 2002-01-25 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 2002-01-25 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 2002-02-03 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2002-03-26 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2002-06-20 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2002-07-04 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2004-05-27 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 2004-05-27 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 2004-05-27 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2006-01-17 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 2006-01-25 | ||
+ | | Well Structure changed to Commingled | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | |}--> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 2002-03-26 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 551.50 | ||
+ | | style="text-align: right;" | 553.50 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 698.30 | ||
+ | | style="text-align: right;" | 698.80 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 690.40 | ||
+ | | style="text-align: right;" | 690.90 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 687.90 | ||
+ | | style="text-align: right;" | 688.40 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 680.50 | ||
+ | | style="text-align: right;" | 681.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 668.00 | ||
+ | | style="text-align: right;" | 669.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 640.50 | ||
+ | | style="text-align: right;" | 641.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 619.30 | ||
+ | | style="text-align: right;" | 619.80 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 617.50 | ||
+ | | style="text-align: right;" | 618.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 603.10 | ||
+ | | style="text-align: right;" | 603.60 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 601.40 | ||
+ | | style="text-align: right;" | 601.90 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2002-03-26 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 549.50 | ||
+ | | style="text-align: right;" | 551.50 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 592.40 | ||
+ | | style="text-align: right;" | 592.90 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 585.80 | ||
+ | | style="text-align: right;" | 586.30 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 574.20 | ||
+ | | style="text-align: right;" | 574.70 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 569.50 | ||
+ | | style="text-align: right;" | 570.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 567.50 | ||
+ | | style="text-align: right;" | 568.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 560.10 | ||
+ | | style="text-align: right;" | 560.60 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 445.80 | ||
+ | | style="text-align: right;" | 446.10 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 441.00 | ||
+ | | style="text-align: right;" | 441.50 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 430.10 | ||
+ | | style="text-align: right;" | 430.60 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 384.60 | ||
+ | | style="text-align: right;" | 385.10 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2002-03-26 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 545.50 | ||
+ | | style="text-align: right;" | 548.50 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 314.80 | ||
+ | | style="text-align: right;" | 315.30 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 309.40 | ||
+ | | style="text-align: right;" | 309.90 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-17 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 309.40 | ||
+ | | style="text-align: right;" | 733.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2002-06-20 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 531.00 | ||
+ | | style="text-align: right;" | 533.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2002-06-20 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 528.00 | ||
+ | | style="text-align: right;" | 531.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2002-07-04 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 422.00 | ||
+ | | style="text-align: right;" | 425.00 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 733.30 | ||
+ | | style="text-align: right;" | 733.80 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 730.90 | ||
+ | | style="text-align: right;" | 731.40 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 2006-01-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 711.60 | ||
+ | | style="text-align: right;" | 712.10 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = General Well Data File - Tour-Perforation/Treatment Data |
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 2004 | ||
+ | | style="text-align: right;" | 5248 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2005 | ||
+ | | style="text-align: right;" | 8472 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Well Production Data - All Alberta | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-25 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 0244272606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.073818,"lon":-113.668316,"icon":""}]} |
Location: 00/06-26-024-27W4/0 | |
Location Alias: 00/06-26-24-27 W4M | |
Location Alias 2: 00/06-26-024-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 024 | |
Meridian: 4 | |
Range: 27 | |
Section: 26 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 6-26-24-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0265868 | |
License Date: 2002-01-10 | |
License Status: Issued | |
Spud Date: 2002-01-18 | |
Final Drill Date: 2002-01-24 | |
Well Total Depth: 1141.00 m | |
Surface Hole Latitude: 51.073818 | |
Surface Hole Longitude: -113.668316 |
Date | Event |
---|---|
2002-01-10 | Obtained License |
2002-01-18 | Surface Casing Operation Performed |
2002-01-24 | Finished Drilling |
2002-01-25 | Production Casing Operation Performed |
2002-01-25 | Rig Released |
2002-01-25 | Well Mode changed to Drilled and Cased |
2002-02-03 | Well Log Performed |
2002-03-26 | Perforation Treatment Performed - Jet Perforation |
2002-06-20 | Perforation Treatment Performed - Jet Perforation |
2002-07-04 | Perforation Treatment Performed - Jet Perforation |
2004-05-27 | Well Began Production |
2004-05-27 | Well Fluid changed to Gas |
2004-05-27 | Well Mode changed to Flowing |
2006-01-11 | Perforation Treatment Performed - Jet Perforation |
2006-01-17 | Perforation Treatment Performed - Fractured |
2006-01-25 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-03-26 | Perforation | 551.50 | 553.50 | 7 |
2006-01-11 | Perforation | 698.30 | 698.80 | 7 |
2006-01-11 | Perforation | 690.40 | 690.90 | 7 |
2006-01-11 | Perforation | 687.90 | 688.40 | 7 |
2006-01-11 | Perforation | 680.50 | 681.00 | 7 |
2006-01-11 | Perforation | 668.00 | 669.00 | 7 |
2006-01-11 | Perforation | 640.50 | 641.00 | 7 |
2006-01-11 | Perforation | 619.30 | 619.80 | 7 |
2006-01-11 | Perforation | 617.50 | 618.00 | 7 |
2006-01-11 | Perforation | 603.10 | 603.60 | 7 |
2006-01-11 | Perforation | 601.40 | 601.90 | 7 |
2002-03-26 | Perforation | 549.50 | 551.50 | 7 |
2006-01-11 | Perforation | 592.40 | 592.90 | 7 |
2006-01-11 | Perforation | 585.80 | 586.30 | 7 |
2006-01-11 | Perforation | 574.20 | 574.70 | 7 |
2006-01-11 | Perforation | 569.50 | 570.00 | 7 |
2006-01-11 | Perforation | 567.50 | 568.00 | 7 |
2006-01-11 | Perforation | 560.10 | 560.60 | 7 |
2006-01-11 | Perforation | 445.80 | 446.10 | 7 |
2006-01-11 | Perforation | 441.00 | 441.50 | 7 |
2006-01-11 | Perforation | 430.10 | 430.60 | 7 |
2006-01-11 | Perforation | 384.60 | 385.10 | 7 |
2002-03-26 | Perforation | 545.50 | 548.50 | 7 |
2006-01-11 | Perforation | 314.80 | 315.30 | 7 |
2006-01-11 | Perforation | 309.40 | 309.90 | 7 |
2006-01-17 | Fracture | 309.40 | 733.80 | 0 |
2002-06-20 | Perforation | 531.00 | 533.00 | 7 |
2002-06-20 | Perforation | 528.00 | 531.00 | 7 |
2002-07-04 | Perforation | 422.00 | 425.00 | 7 |
2006-01-11 | Perforation | 733.30 | 733.80 | 7 |
2006-01-11 | Perforation | 730.90 | 731.40 | 7 |
2006-01-11 | Perforation | 711.60 | 712.10 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 5248 | 0.0 | 0.0 | 0.0 |
2005 | 8472 | 0.0 | 0.0 | 0.0 |
For data sources see[5]