If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 289: | Line 289: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0274270509020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.276382,"lon":-113.757174,"icon":""}]} |
Location: 02/09-05-027-27W4/0 | |
Location Alias: 02/09-05-27-27 W4M | |
Location Alias 2: 02/09-05-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 05 | |
County/Municipality: Rocky View County | |
Well Name: EMBER 102 ENTICE 9-5-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0435078 | |
License Date: 2011-07-12 | |
License Status: Suspension | |
Spud Date: 2011-12-15 | |
Final Drill Date: 2011-12-17 | |
Well Total Depth: 1960.00 m | |
Surface Hole Latitude: 51.276382 | |
Surface Hole Longitude: -113.757174 |
Date | Event |
---|---|
2011-07-12 | Obtained License |
2011-12-15 | Conductor Casing Operation Performed |
2011-12-15 | Direction Drilling Operation Performed - Deviate |
2011-12-16 | Surface Casing Operation Performed |
2011-12-17 | Finished Drilling |
2011-12-17 | Well Mode changed to Drilled and Cased |
2011-12-18 | Well Log Performed |
2011-12-19 | Production Casing Operation Performed |
2011-12-19 | Rig Released |
2011-12-22 | Well Log Performed |
2012-01-29 | Perforation Treatment Performed - Jet Perforation |
2012-01-31 | Perforation Treatment Performed - Jet Perforation |
2012-01-31 | Well Log Performed |
2012-02-04 | Perforation Treatment Performed - Fractured |
2012-02-09 | Perforation Treatment Performed - Jet Perforation |
2012-02-09 | Well Log Performed |
2012-02-15 | Well Fluid changed to Gas |
2012-02-15 | Well Mode changed to Testing |
2012-05-15 | Well Fluid changed to Gas |
2012-05-15 | Well Mode changed to Test Completed |
2018-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-07-18 | Plug Back Performed |
2018-07-18 | Well Fluid changed to Gas |
2018-07-18 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-15 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-29 | Perforation | 1847.00 | 1850.00 | 17 |
2012-01-31 | Perforation | 1838.00 | 1841.00 | 17 |
2012-02-04 | Fracture | 1838.00 | 1841.00 | 0 |
2012-02-09 | Perforation | 1827.00 | 1830.00 | 17 |
2018-07-18 | Packing Device Capped w/Cement | 1807.20 | 1815.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-07-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]