X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0284130215000"

m
m
 
Line 186: Line 186:
 
| style="text-align: right;" | 986.00
 
| style="text-align: right;" | 986.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 +
|-
 +
| 1989-11-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 940.00
 +
| style="text-align: right;" | 950.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1986-11-26
 
| 1986-11-26
Line 234: Line 240:
 
| style="text-align: right;" | 958.50
 
| style="text-align: right;" | 958.50
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
|-
 
| 1989-11-17
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 940.00
 
| style="text-align: right;" | 950.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
Line 315: Line 315:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 20:00, 29 January 2021

Well Details

Well ID: 0284130215000
Loading map...
Location: 00/15-02-028-13W4/0
Location Alias: 00/15-02-28-13 W4M
Location Alias 2: 00/15-02-028-13 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 13
Section: 02
County/Municipality: Special Areas No. 2
Well Name: PALOMA STROM BERRY 15-2-28-13
Operator Name: Calibre Energy Inc.
License Number: 0082284
License Date: 1980-04-22
License Status: RecCertified
Spud Date: 1980-05-31
Final Drill Date: 1980-06-07
Well Total Depth: 1182.00 m
Surface Hole Latitude: 51.369459
Surface Hole Longitude: -111.725848

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-22 Obtained License
1980-06-07 Finished Drilling
1980-06-07 Well Log Performed
1980-06-09 Production Casing Operation Performed
1980-06-26 Perforation Treatment Performed - Jet Perforation
1980-07-08 Well Mode changed to Drilled and Cased
1986-07-14 Well Began Production
1986-07-14 Well Fluid changed to Gas
1986-07-14 Well Mode changed to Flowing
1986-11-26 Perforation Treatment Performed - Cement Squeeze
1986-11-27 Well Log Performed
1986-11-28 Perforation Treatment Performed - Jet Perforation
1986-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-30 Well Log Performed
1986-12-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-31 Perforation Treatment Performed - Jet Perforation
1986-12-31 Plug Back Performed
1986-12-31 Well Fluid changed to Gas
1986-12-31 Well Mode changed to Abandoned Zone
1987-04-13 Well Log Performed
1987-04-14 Perforation Treatment Performed - Jet Perforation
1987-04-15 Perforation Treatment Performed - Remedial Casing
1987-04-15 Well Log Performed
1987-04-16 Perforation Treatment Performed - Jet Perforation
1989-11-16 Well Log Performed
1989-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-17 Plug Back Performed
1989-11-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-26 Perforation 984.00 986.00 7
1989-11-17 Packing Device Capped w/Cement 940.00 950.00 0
1986-11-26 Cement Squeeze 984.00 986.00 0
1986-11-28 Perforation 983.00 985.00 7
1986-11-30 Acid Treatment 983.00 985.00 0
1986-12-31 Packing Device Capped w/Cement 968.00 976.00 0
1986-12-31 Perforation 957.00 958.50 7
1987-04-14 Perforation 965.00 965.50 7
1987-04-15 Remedial Casing Cementing 965.00 965.50 0
1987-04-16 Perforation 957.00 958.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 2557 0.0 0.0 0.0

For data sources see[5]

References