If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0284272806000 | | Well ID: 0284272806000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 51.421073, -113.746670 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/06-28-028-27W4/0 | | Location: 00/06-28-028-27W4/0 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/06-28-028-27 W4/00 | | Location Alias 2: 00/06-28-028-27 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 028 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 27 | ||
+ | |- | ||
+ | | Section: 28 | ||
|- | |- | ||
| County/Municipality: [[Rocky View County,_Alberta|Rocky View County]] | | County/Municipality: [[Rocky View County,_Alberta|Rocky View County]] | ||
Line 17: | Line 27: | ||
| Well Name: PW GAS IRCANA 6-28-28-27 | | Well Name: PW GAS IRCANA 6-28-28-27 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[TAQA North Ltd.]] |
|- | |- | ||
| License Number: 0035807 | | License Number: 0035807 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 1969-03-11 | | Final Drill Date: 1969-03-11 | ||
|- | |- | ||
− | | Well Total Depth: 2487. | + | | Well Total Depth: 2487.20 m |
|- | |- | ||
| Surface Hole Latitude: 51.421073 | | Surface Hole Latitude: 51.421073 | ||
|- | |- | ||
− | | Surface Hole Longitude: -113. | + | | Surface Hole Longitude: -113.746670 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1969-02-13 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1969-03-08 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1969-03-11 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1969-03-13 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1969-03-25 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1969-03-25 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1970-03-13 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1995-12-05 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1995-12-07 | ||
+ | | Perforation Treatment Performed - Fractured | ||
+ | |- | ||
+ | | 1995-12-11 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 1995-12-11 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 1995-12-11 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1997-12-17 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1997-12-17 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1997-12-17 | ||
+ | | Well Fluid changed to Gas | ||
+ | |- | ||
+ | | 1997-12-17 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1997-12-17 | ||
+ | | Well Mode changed to Abandoned Zone | ||
+ | |- | ||
+ | | 1997-12-19 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1997-12-22 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 1998-01-05 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1998-01-08 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 1998-01-12 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2009-06-18 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2009-06-19 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2009-06-19 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2009-06-20 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 2009-06-20 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2009-06-21 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 2009-06-21 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2009-06-21 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 2009-06-21 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2009-06-22 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2009-06-23 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 2009-06-23 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 2009-07-07 | ||
+ | | Well Abandoned | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-04-29 }}</ref> |
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 204: | ||
| 1969-03-25 | | 1969-03-25 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 2300. | + | | style="text-align: right;" | 2300.60 |
− | | style="text-align: right;" | 2302. | + | | style="text-align: right;" | 2302.80 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1997-12-19 | | 1997-12-19 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1730 | + | | style="text-align: right;" | 1730.00 |
− | | style="text-align: right;" | 1730. | + | | style="text-align: right;" | 1730.30 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1997-12-19 | | 1997-12-19 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1685 | + | | style="text-align: right;" | 1685.00 |
− | | style="text-align: right;" | 1685. | + | | style="text-align: right;" | 1685.30 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1997-12-22 | | 1997-12-22 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 1685 | + | | style="text-align: right;" | 1685.00 |
− | | style="text-align: right;" | 1730 | + | | style="text-align: right;" | 1730.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1998-01-05 | | 1998-01-05 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1730 | + | | style="text-align: right;" | 1730.00 |
− | | style="text-align: right;" | 1730. | + | | style="text-align: right;" | 1730.30 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1998-01-05 | | 1998-01-05 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1685 | + | | style="text-align: right;" | 1685.00 |
− | | style="text-align: right;" | 1685. | + | | style="text-align: right;" | 1685.30 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 1998-01-08 | | 1998-01-08 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 1685 | + | | style="text-align: right;" | 1685.00 |
− | | style="text-align: right;" | 1730 | + | | style="text-align: right;" | 1730.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1998-01-12 | | 1998-01-12 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1697 | + | | style="text-align: right;" | 1697.00 |
− | | style="text-align: right;" | 1699 | + | | style="text-align: right;" | 1699.00 |
| style="text-align: right;" | 14 | | style="text-align: right;" | 14 | ||
|- | |- | ||
| 1998-01-12 | | 1998-01-12 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1706 | + | | style="text-align: right;" | 1706.00 |
− | | style="text-align: right;" | 1707 | + | | style="text-align: right;" | 1707.00 |
| style="text-align: right;" | 14 | | style="text-align: right;" | 14 | ||
|- | |- | ||
| 1998-01-12 | | 1998-01-12 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1710. | + | | style="text-align: right;" | 1710.50 |
− | | style="text-align: right;" | 1711. | + | | style="text-align: right;" | 1711.50 |
| style="text-align: right;" | 14 | | style="text-align: right;" | 14 | ||
|- | |- | ||
| 1998-01-12 | | 1998-01-12 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1719. | + | | style="text-align: right;" | 1719.50 |
− | | style="text-align: right;" | 1721. | + | | style="text-align: right;" | 1721.50 |
| style="text-align: right;" | 14 | | style="text-align: right;" | 14 | ||
+ | |- | ||
+ | | 1969-03-25 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2304.90 | ||
+ | | style="text-align: right;" | 2305.80 | ||
+ | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 2009-06-19 | | 2009-06-19 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1240. | + | | style="text-align: right;" | 1240.50 |
− | | style="text-align: right;" | 1241. | + | | style="text-align: right;" | 1241.50 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 2009-06-19 | | 2009-06-19 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1128. | + | | style="text-align: right;" | 1128.70 |
− | | style="text-align: right;" | 1129. | + | | style="text-align: right;" | 1129.70 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 2009-06-19 | | 2009-06-19 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 841. | + | | style="text-align: right;" | 841.20 |
− | | style="text-align: right;" | 842. | + | | style="text-align: right;" | 842.20 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 2009-06-19 | | 2009-06-19 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 675. | + | | style="text-align: right;" | 675.70 |
− | | style="text-align: right;" | 676. | + | | style="text-align: right;" | 676.70 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 2009-06-20 | | 2009-06-20 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1719. | + | | style="text-align: right;" | 1719.50 |
− | | style="text-align: right;" | 1721. | + | | style="text-align: right;" | 1721.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-20 | | 2009-06-20 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1710. | + | | style="text-align: right;" | 1710.50 |
− | | style="text-align: right;" | 1711. | + | | style="text-align: right;" | 1711.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-20 | | 2009-06-20 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1706 | + | | style="text-align: right;" | 1706.00 |
− | | style="text-align: right;" | 1707 | + | | style="text-align: right;" | 1707.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-20 | | 2009-06-20 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1697 | + | | style="text-align: right;" | 1697.00 |
− | | style="text-align: right;" | 1699 | + | | style="text-align: right;" | 1699.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-20 | | 2009-06-20 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 1240. | + | | style="text-align: right;" | 1240.50 |
− | | style="text-align: right;" | 1241. | + | | style="text-align: right;" | 1241.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-20 | | 2009-06-20 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 1128. | + | | style="text-align: right;" | 1128.70 |
− | | style="text-align: right;" | 1129. | + | | style="text-align: right;" | 1129.70 |
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1969-03-25 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2300.60 | ||
+ | | style="text-align: right;" | 2302.80 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-20 | | 2009-06-20 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 841. | + | | style="text-align: right;" | 841.20 |
− | | style="text-align: right;" | 842. | + | | style="text-align: right;" | 842.20 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-20 | | 2009-06-20 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 675. | + | | style="text-align: right;" | 675.70 |
− | | style="text-align: right;" | 676. | + | | style="text-align: right;" | 676.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-21 | | 2009-06-21 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 823 | + | | style="text-align: right;" | 823.00 |
− | | style="text-align: right;" | 1723 | + | | style="text-align: right;" | 1723.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-21 | | 2009-06-21 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 522. | + | | style="text-align: right;" | 522.90 |
− | | style="text-align: right;" | 823 | + | | style="text-align: right;" | 823.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-21 | | 2009-06-21 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 327. | + | | style="text-align: right;" | 327.80 |
− | | style="text-align: right;" | 328. | + | | style="text-align: right;" | 328.80 |
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
|- | |- | ||
| 2009-06-22 | | 2009-06-22 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 327. | + | | style="text-align: right;" | 327.80 |
− | | style="text-align: right;" | 328. | + | | style="text-align: right;" | 328.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2009-06-23 | | 2009-06-23 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 238. | + | | style="text-align: right;" | 238.50 |
− | | style="text-align: right;" | 345 | + | | style="text-align: right;" | 345.00 |
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1969-03-25 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 2304.90 | ||
+ | | style="text-align: right;" | 2305.80 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1995-12-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2299.40 | ||
+ | | style="text-align: right;" | 2300.60 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1995-12-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2302.80 | ||
+ | | style="text-align: right;" | 2304.60 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1995-12-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2305.80 | ||
+ | | style="text-align: right;" | 2308.90 | ||
+ | | style="text-align: right;" | 7 | ||
+ | |- | ||
+ | | 1995-12-07 | ||
+ | | Fracture | ||
+ | | style="text-align: right;" | 2299.40 | ||
+ | | style="text-align: right;" | 2308.90 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1997-12-17 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 2282.00 | ||
+ | | style="text-align: right;" | 2290.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 292: | Line 422: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | Start Date | + | !scope="col" | Job Number |
− | !scope="col" | End Date | + | !scope="col" | Job Start Date |
− | !scope="col" | | + | !scope="col" | Job End Date |
− | !scope="col" | + | !scope="col" | True Vertical Depth (ft) |
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 325: | Line 469: | ||
| 1995 | | 1995 | ||
| style="text-align: right;" | 492 | | style="text-align: right;" | 492 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1996 | | 1996 | ||
| style="text-align: right;" | 8372 | | style="text-align: right;" | 8372 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1997 | | 1997 | ||
| style="text-align: right;" | 5330 | | style="text-align: right;" | 5330 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
|} | |} | ||
Line 345: | Line 489: | ||
| title = Well Production Data - All Alberta | | title = Well Production Data - All Alberta | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-25 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Occurences == | <!--== Occurences == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 360: | Line 504: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0284272806000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.421073,"lon":-113.74667,"icon":""}]} |
Location: 00/06-28-028-27W4/0 | |
Location Alias: 00/06-28-28-27 W4M | |
Location Alias 2: 00/06-28-028-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 27 | |
Section: 28 | |
County/Municipality: Rocky View County | |
Well Name: PW GAS IRCANA 6-28-28-27 | |
Operator Name: TAQA North Ltd. | |
License Number: 0035807 | |
License Date: 1969-02-13 | |
License Status: Abandoned | |
Spud Date: 1969-02-17 | |
Final Drill Date: 1969-03-11 | |
Well Total Depth: 2487.20 m | |
Surface Hole Latitude: 51.421073 | |
Surface Hole Longitude: -113.746670 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1969-02-13 | Obtained License |
1969-03-08 | Drill Stem Test Performed |
1969-03-11 | Finished Drilling |
1969-03-13 | Drill Stem Test Performed |
1969-03-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-03-25 | Perforation Treatment Performed - Jet Perforation |
1970-03-13 | Well Mode changed to Drilled and Cased |
1995-12-05 | Perforation Treatment Performed - Jet Perforation |
1995-12-07 | Perforation Treatment Performed - Fractured |
1995-12-11 | Well Began Production |
1995-12-11 | Well Fluid changed to Gas |
1995-12-11 | Well Mode changed to Flowing |
1997-12-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-12-17 | Plug Back Performed |
1997-12-17 | Well Fluid changed to Gas |
1997-12-17 | Well Log Performed |
1997-12-17 | Well Mode changed to Abandoned Zone |
1997-12-19 | Perforation Treatment Performed - Jet Perforation |
1997-12-22 | Perforation Treatment Performed - Remedial Casing |
1998-01-05 | Perforation Treatment Performed - Jet Perforation |
1998-01-08 | Perforation Treatment Performed - Remedial Casing |
1998-01-12 | Perforation Treatment Performed - Jet Perforation |
2009-06-18 | Well Log Performed |
2009-06-19 | Perforation Treatment Performed - Jet Perforation |
2009-06-19 | Well Log Performed |
2009-06-20 | Perforation Treatment Performed - Cement Squeeze |
2009-06-20 | Perforation Treatment Performed - Remedial Casing |
2009-06-21 | Perforation Treatment Performed - Cement Plug |
2009-06-21 | Perforation Treatment Performed - Jet Perforation |
2009-06-21 | Plug Back Performed |
2009-06-21 | Well Log Performed |
2009-06-22 | Perforation Treatment Performed - Remedial Casing |
2009-06-23 | Perforation Treatment Performed - Cement Plug |
2009-06-23 | Plug Back Performed |
2009-07-07 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1969-03-25 | Perforation | 2300.60 | 2302.80 | 7 |
1997-12-19 | Perforation | 1730.00 | 1730.30 | 13 |
1997-12-19 | Perforation | 1685.00 | 1685.30 | 13 |
1997-12-22 | Remedial Casing Cementing | 1685.00 | 1730.00 | 0 |
1998-01-05 | Perforation | 1730.00 | 1730.30 | 13 |
1998-01-05 | Perforation | 1685.00 | 1685.30 | 13 |
1998-01-08 | Remedial Casing Cementing | 1685.00 | 1730.00 | 0 |
1998-01-12 | Perforation | 1697.00 | 1699.00 | 14 |
1998-01-12 | Perforation | 1706.00 | 1707.00 | 14 |
1998-01-12 | Perforation | 1710.50 | 1711.50 | 14 |
1998-01-12 | Perforation | 1719.50 | 1721.50 | 14 |
1969-03-25 | Perforation | 2304.90 | 2305.80 | 7 |
2009-06-19 | Perforation | 1240.50 | 1241.50 | 13 |
2009-06-19 | Perforation | 1128.70 | 1129.70 | 13 |
2009-06-19 | Perforation | 841.20 | 842.20 | 13 |
2009-06-19 | Perforation | 675.70 | 676.70 | 13 |
2009-06-20 | Cement Squeeze | 1719.50 | 1721.50 | 0 |
2009-06-20 | Cement Squeeze | 1710.50 | 1711.50 | 0 |
2009-06-20 | Cement Squeeze | 1706.00 | 1707.00 | 0 |
2009-06-20 | Cement Squeeze | 1697.00 | 1699.00 | 0 |
2009-06-20 | Remedial Casing Cementing | 1240.50 | 1241.50 | 0 |
2009-06-20 | Remedial Casing Cementing | 1128.70 | 1129.70 | 0 |
1969-03-25 | Acid Treatment | 2300.60 | 2302.80 | 0 |
2009-06-20 | Remedial Casing Cementing | 841.20 | 842.20 | 0 |
2009-06-20 | Remedial Casing Cementing | 675.70 | 676.70 | 0 |
2009-06-21 | Cement Plug | 823.00 | 1723.00 | 0 |
2009-06-21 | Cement Plug | 522.90 | 823.00 | 0 |
2009-06-21 | Perforation | 327.80 | 328.80 | 13 |
2009-06-22 | Remedial Casing Cementing | 327.80 | 328.80 | 0 |
2009-06-23 | Cement Plug | 238.50 | 345.00 | 0 |
1969-03-25 | Acid Treatment | 2304.90 | 2305.80 | 0 |
1995-12-05 | Perforation | 2299.40 | 2300.60 | 7 |
1995-12-05 | Perforation | 2302.80 | 2304.60 | 7 |
1995-12-05 | Perforation | 2305.80 | 2308.90 | 7 |
1995-12-07 | Fracture | 2299.40 | 2308.90 | 0 |
1997-12-17 | Packing Device Capped w/Cement | 2282.00 | 2290.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 492 | 0.0 | 0.0 | 0.0 |
1996 | 8372 | 0.0 | 0.0 | 0.0 |
1997 | 5330 | 0.0 | 0.0 | 0.0 |
For data sources see[5]