X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0284272806000"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0284272806000
 
| Well ID: 0284272806000
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.421073, -113.74667 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.421073, -113.746670 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-28-028-27W4/0
 
| Location: 00/06-28-028-27W4/0
Line 43: Line 43:
 
| Surface Hole Latitude: 51.421073
 
| Surface Hole Latitude: 51.421073
 
|-
 
|-
| Surface Hole Longitude: -113.74667
+
| Surface Hole Longitude: -113.746670
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
Line 207: Line 207:
 
| style="text-align: right;" | 2302.80
 
| style="text-align: right;" | 2302.80
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
|-
 
| 1969-03-25
 
| Perforation
 
| style="text-align: right;" | 2304.90
 
| style="text-align: right;" | 2305.80
 
| style="text-align: right;" | 7
 
|-
 
| 1969-03-25
 
| Acid Treatment
 
| style="text-align: right;" | 2300.60
 
| style="text-align: right;" | 2302.80
 
| style="text-align: right;" | 0
 
|-
 
| 1969-03-25
 
| Acid Treatment
 
| style="text-align: right;" | 2304.90
 
| style="text-align: right;" | 2305.80
 
| style="text-align: right;" | 0
 
|-
 
| 1995-12-05
 
| Perforation
 
| style="text-align: right;" | 2299.40
 
| style="text-align: right;" | 2300.60
 
| style="text-align: right;" | 7
 
|-
 
| 1995-12-05
 
| Perforation
 
| style="text-align: right;" | 2302.80
 
| style="text-align: right;" | 2304.60
 
| style="text-align: right;" | 7
 
|-
 
| 1995-12-05
 
| Perforation
 
| style="text-align: right;" | 2305.80
 
| style="text-align: right;" | 2308.90
 
| style="text-align: right;" | 7
 
|-
 
| 1995-12-07
 
| Fracture
 
| style="text-align: right;" | 2299.40
 
| style="text-align: right;" | 2308.90
 
| style="text-align: right;" | 0
 
|-
 
| 1997-12-17
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 2282.00
 
| style="text-align: right;" | 2290.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 1997-12-19
 
| 1997-12-19
Line 315: Line 267:
 
| style="text-align: right;" | 1721.50
 
| style="text-align: right;" | 1721.50
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 +
|-
 +
| 1969-03-25
 +
| Perforation
 +
| style="text-align: right;" | 2304.90
 +
| style="text-align: right;" | 2305.80
 +
| style="text-align: right;" | 7
 
|-
 
|-
 
| 2009-06-19
 
| 2009-06-19
Line 374: Line 332:
 
| style="text-align: right;" | 1128.70
 
| style="text-align: right;" | 1128.70
 
| style="text-align: right;" | 1129.70
 
| style="text-align: right;" | 1129.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1969-03-25
 +
| Acid Treatment
 +
| style="text-align: right;" | 2300.60
 +
| style="text-align: right;" | 2302.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 416: Line 380:
 
| style="text-align: right;" | 238.50
 
| style="text-align: right;" | 238.50
 
| style="text-align: right;" | 345.00
 
| style="text-align: right;" | 345.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1969-03-25
 +
| Acid Treatment
 +
| style="text-align: right;" | 2304.90
 +
| style="text-align: right;" | 2305.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1995-12-05
 +
| Perforation
 +
| style="text-align: right;" | 2299.40
 +
| style="text-align: right;" | 2300.60
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1995-12-05
 +
| Perforation
 +
| style="text-align: right;" | 2302.80
 +
| style="text-align: right;" | 2304.60
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1995-12-05
 +
| Perforation
 +
| style="text-align: right;" | 2305.80
 +
| style="text-align: right;" | 2308.90
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1995-12-07
 +
| Fracture
 +
| style="text-align: right;" | 2299.40
 +
| style="text-align: right;" | 2308.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1997-12-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2282.00
 +
| style="text-align: right;" | 2290.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 504: Line 504:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 01:30, 30 January 2021

Well Details

Well ID: 0284272806000
Loading map...
Location: 00/06-28-028-27W4/0
Location Alias: 00/06-28-28-27 W4M
Location Alias 2: 00/06-28-028-27 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 27
Section: 28
County/Municipality: Rocky View County
Well Name: PW GAS IRCANA 6-28-28-27
Operator Name: TAQA North Ltd.
License Number: 0035807
License Date: 1969-02-13
License Status: Abandoned
Spud Date: 1969-02-17
Final Drill Date: 1969-03-11
Well Total Depth: 2487.20 m
Surface Hole Latitude: 51.421073
Surface Hole Longitude: -113.746670

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-02-13 Obtained License
1969-03-08 Drill Stem Test Performed
1969-03-11 Finished Drilling
1969-03-13 Drill Stem Test Performed
1969-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-25 Perforation Treatment Performed - Jet Perforation
1970-03-13 Well Mode changed to Drilled and Cased
1995-12-05 Perforation Treatment Performed - Jet Perforation
1995-12-07 Perforation Treatment Performed - Fractured
1995-12-11 Well Began Production
1995-12-11 Well Fluid changed to Gas
1995-12-11 Well Mode changed to Flowing
1997-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-17 Plug Back Performed
1997-12-17 Well Fluid changed to Gas
1997-12-17 Well Log Performed
1997-12-17 Well Mode changed to Abandoned Zone
1997-12-19 Perforation Treatment Performed - Jet Perforation
1997-12-22 Perforation Treatment Performed - Remedial Casing
1998-01-05 Perforation Treatment Performed - Jet Perforation
1998-01-08 Perforation Treatment Performed - Remedial Casing
1998-01-12 Perforation Treatment Performed - Jet Perforation
2009-06-18 Well Log Performed
2009-06-19 Perforation Treatment Performed - Jet Perforation
2009-06-19 Well Log Performed
2009-06-20 Perforation Treatment Performed - Cement Squeeze
2009-06-20 Perforation Treatment Performed - Remedial Casing
2009-06-21 Perforation Treatment Performed - Cement Plug
2009-06-21 Perforation Treatment Performed - Jet Perforation
2009-06-21 Plug Back Performed
2009-06-21 Well Log Performed
2009-06-22 Perforation Treatment Performed - Remedial Casing
2009-06-23 Perforation Treatment Performed - Cement Plug
2009-06-23 Plug Back Performed
2009-07-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-03-25 Perforation 2300.60 2302.80 7
1997-12-19 Perforation 1730.00 1730.30 13
1997-12-19 Perforation 1685.00 1685.30 13
1997-12-22 Remedial Casing Cementing 1685.00 1730.00 0
1998-01-05 Perforation 1730.00 1730.30 13
1998-01-05 Perforation 1685.00 1685.30 13
1998-01-08 Remedial Casing Cementing 1685.00 1730.00 0
1998-01-12 Perforation 1697.00 1699.00 14
1998-01-12 Perforation 1706.00 1707.00 14
1998-01-12 Perforation 1710.50 1711.50 14
1998-01-12 Perforation 1719.50 1721.50 14
1969-03-25 Perforation 2304.90 2305.80 7
2009-06-19 Perforation 1240.50 1241.50 13
2009-06-19 Perforation 1128.70 1129.70 13
2009-06-19 Perforation 841.20 842.20 13
2009-06-19 Perforation 675.70 676.70 13
2009-06-20 Cement Squeeze 1719.50 1721.50 0
2009-06-20 Cement Squeeze 1710.50 1711.50 0
2009-06-20 Cement Squeeze 1706.00 1707.00 0
2009-06-20 Cement Squeeze 1697.00 1699.00 0
2009-06-20 Remedial Casing Cementing 1240.50 1241.50 0
2009-06-20 Remedial Casing Cementing 1128.70 1129.70 0
1969-03-25 Acid Treatment 2300.60 2302.80 0
2009-06-20 Remedial Casing Cementing 841.20 842.20 0
2009-06-20 Remedial Casing Cementing 675.70 676.70 0
2009-06-21 Cement Plug 823.00 1723.00 0
2009-06-21 Cement Plug 522.90 823.00 0
2009-06-21 Perforation 327.80 328.80 13
2009-06-22 Remedial Casing Cementing 327.80 328.80 0
2009-06-23 Cement Plug 238.50 345.00 0
1969-03-25 Acid Treatment 2304.90 2305.80 0
1995-12-05 Perforation 2299.40 2300.60 7
1995-12-05 Perforation 2302.80 2304.60 7
1995-12-05 Perforation 2305.80 2308.90 7
1995-12-07 Fracture 2299.40 2308.90 0
1997-12-17 Packing Device Capped w/Cement 2282.00 2290.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 492 0.0 0.0 0.0
1996 8372 0.0 0.0 0.0
1997 5330 0.0 0.0 0.0

For data sources see[5]

References