If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 312: | Line 312: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0284281708000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.390984,"lon":-113.897659,"icon":""}]} |
Location: 00/08-17-028-28W4/0 | |
Location Alias: 00/08-17-28-28 W4M | |
Location Alias 2: 00/08-17-028-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 28 | |
Section: 17 | |
County/Municipality: Rocky View County | |
Well Name: LOCHWEST ET AL CROSSE 8-17-28-28 | |
Operator Name: Whitecap Resources Inc. | |
License Number: 0130252 | |
License Date: 1987-11-24 | |
License Status: RecCertified | |
Spud Date: 1987-11-24 | |
Final Drill Date: 1987-12-02 | |
Well Total Depth: 1660.00 m | |
Surface Hole Latitude: 51.390984 | |
Surface Hole Longitude: -113.897659 |
Date | Event |
---|---|
1987-11-24 | Obtained License |
1987-11-26 | Surface Casing Operation Performed |
1987-12-02 | Finished Drilling |
1987-12-02 | Well Log Performed |
1987-12-02 | Well Mode changed to Drilled and Cased |
1987-12-03 | Production Casing Operation Performed |
1987-12-04 | Rig Released |
1987-12-17 | Perforation Treatment Performed - Jet Perforation |
1987-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-19 | Perforation Treatment Performed - Fractured |
1988-01-25 | Well Began Production |
1988-01-25 | Well Fluid changed to Crude Oil |
1988-01-25 | Well Mode changed to Pumping |
1994-10-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-01 | Perforation Treatment Performed - Jet Perforation |
1994-10-01 | Well Fluid changed to Crude Oil |
1994-10-01 | Well Mode changed to Pumping |
1994-10-02 | Well Fluid changed to Crude Oil |
1994-10-02 | Well Mode changed to Abandoned Zone |
1996-02-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-02-29 | Perforation Treatment Performed - Jet Perforation |
1996-02-29 | Perforation Treatment Performed - Remedial Casing |
1996-02-29 | Plug Back Performed |
1996-03-01 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-12-17 | Perforation | 1630.00 | 1631.80 | 13 |
1987-12-18 | Acid Treatment | 1630.00 | 1631.80 | 0 |
1987-12-19 | Fracture | 1630.00 | 1631.80 | 0 |
1994-10-01 | Packing Device Capped w/Cement | 1609.00 | 1617.00 | 0 |
1994-10-01 | Perforation | 1183.00 | 1186.50 | 13 |
1996-02-29 | Packing Device Capped w/Cement | 1162.00 | 1170.00 | 0 |
1996-02-29 | Perforation | 372.00 | 374.00 | 13 |
1996-02-29 | Remedial Casing Cementing | 372.00 | 374.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 8159 | 0.0 | 0.0 | 0.0 |
1989 | 8455 | 0.0 | 0.0 | 0.0 |
1990 | 8266 | 0.0 | 0.0 | 0.0 |
1991 | 4931 | 0.0 | 0.0 | 0.0 |
1992 | 1667 | 0.0 | 0.0 | 0.0 |
For data sources see[5]