X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0285021016000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0285021016000
 
| Well ID: 0285021016000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.3855995, -114.1922695 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.385596, -114.192222 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/16-10-028-02W5/0
 +
|-
 +
| Location Alias: 00/16-10-28-02 W5M
 +
|-
 +
| Location Alias 2: 00/16-10-028-02 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 028
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 02
 +
|-
 +
| Section: 10
 +
|-
 +
| County/Municipality: [[Rocky View County,_Alberta|Rocky View County]]
 
|-
 
|-
 
| Well Name: BONAVISTA CROSS 16-10-28-2
 
| Well Name: BONAVISTA CROSS 16-10-28-2
 
|-
 
|-
| Operator:
+
| Operator Name: [[Bonavista Energy Corporation]]
 +
|-
 +
| License Number: 0019260
 
|-
 
|-
 
| License Date: 1960-06-27
 
| License Date: 1960-06-27
 
|-
 
|-
| Final Drilling Date: 1960-08-22
+
| License Status: RecCertified
 +
|-
 +
| Spud Date: 1960-08-03
 +
|-
 +
| Final Drill Date: 1960-08-22
 +
|-
 +
| Well Total Depth: 2066.50 m
 +
|-
 +
| Surface Hole Latitude: 51.385596
 +
|-
 +
| Surface Hole Longitude: -114.192222
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1960-06-27
 +
| Obtained License
 +
|-
 +
| 1960-08-22
 +
| Finished Drilling
 +
|-
 +
| 1960-08-22
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1960-08-24
 +
| Production Casing Operation Performed
 +
|-
 +
| 1960-08-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1960-08-26
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1960-08-28
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1960-09-12
 +
| Well Began Production
 +
|-
 +
| 1960-09-12
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1960-09-12
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1961-11-24
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1961-11-24
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1962-05-14
 +
| Perforation Treatment Performed - Condensate Squeeze
 +
|-
 +
| 1965-05-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1965-05-11
 +
| Perforation Treatment Performed - Condensate Squeeze
 +
|-
 +
| 1965-07-01
 +
| Well Began Injection
 +
|-
 +
| 1965-07-01
 +
| Well Fluid changed to Water
 +
|-
 +
| 1965-07-01
 +
| Well Type changed to Injection
 +
|-
 +
| 1985-12-31
 +
| Well Fluid changed to Water
 +
|-
 +
| 1985-12-31
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1985-12-31
 +
| Well Type changed to Injection
 +
|-
 +
| 2013-10-24
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2013-10-24
 +
| Plug Back Performed
 +
|-
 +
| 2013-10-24
 +
| Well Fluid changed to Water
 +
|-
 +
| 2013-10-24
 +
| Well Log Performed
 +
|-
 +
| 2013-10-24
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2013-10-24
 +
| Well Type changed to Injection
 +
|-
 +
| 2014-02-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2014-02-02
 +
| Well Log Performed
 +
|-
 +
| 2014-02-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2014-02-03
 +
| Plug Back Performed
 +
|-
 +
| 2014-02-04
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2014-02-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2014-02-04
 +
| Plug Back Performed
 +
|-
 +
| 2014-02-04
 +
| Well Log Performed
 +
|-
 +
| 2014-02-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2014-02-05
 +
| Plug Back Performed
 +
|-
 +
| 2014-02-06
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2014-02-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2014-02-06
 +
| Plug Back Performed
 +
|-
 +
| 2014-02-06
 +
| Well Log Performed
 +
|-
 +
| 2014-02-08
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2014-02-08
 +
| Plug Back Performed
 +
|-
 +
| 2014-03-15
 +
| Well Abandoned
 +
|-
 +
| 2014-03-15
 +
| Well Fluid changed to Water
 +
|-
 +
| 2014-03-15
 +
| Well Mode changed to Abandoned
 +
|-
 +
| 2014-03-15
 +
| Well Type changed to Injection
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1960-08-25
 +
| Perforation
 +
| style="text-align: right;" | 2046.70
 +
| style="text-align: right;" | 2051.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2014-02-04
 +
| Perforation
 +
| style="text-align: right;" | 724.00
 +
| style="text-align: right;" | 725.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2014-02-04
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 706.00
 +
| style="text-align: right;" | 714.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-02-04
 +
| Perforation
 +
| style="text-align: right;" | 599.00
 +
| style="text-align: right;" | 600.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2014-02-05
 +
| Cement Squeeze
 +
| style="text-align: right;" | 599.00
 +
| style="text-align: right;" | 600.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-02-06
 +
| Perforation
 +
| style="text-align: right;" | 366.00
 +
| style="text-align: right;" | 367.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2014-02-06
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 588.00
 +
| style="text-align: right;" | 596.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-02-08
 +
| Cement Squeeze
 +
| style="text-align: right;" | 366.00
 +
| style="text-align: right;" | 367.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1960-08-26
 +
| Acid Treatment
 +
| style="text-align: right;" | 2046.70
 +
| style="text-align: right;" | 2051.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1960-08-28
 +
| Fracture
 +
| style="text-align: right;" | 2046.70
 +
| style="text-align: right;" | 2051.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-05-14
 +
| Condensate Squeeze
 +
| style="text-align: right;" | 2046.70
 +
| style="text-align: right;" | 2051.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-05-10
 +
| Acid Treatment
 +
| style="text-align: right;" | 2046.70
 +
| style="text-align: right;" | 2051.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1965-05-11
 +
| Condensate Squeeze
 +
| style="text-align: right;" | 2046.70
 +
| style="text-align: right;" | 2051.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-10-24
 +
| Cement Plug
 +
| style="text-align: right;" | 2023.30
 +
| style="text-align: right;" | 2032.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014-02-02
 +
| Perforation
 +
| style="text-align: right;" | 1343.50
 +
| style="text-align: right;" | 1344.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2014-02-03
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1343.50
 +
| style="text-align: right;" | 1344.50
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 
|-
 
|-
| Total Depth: 2066.5m
+
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 
|-
 
|-
| Fluid Type: Water
+
| 1961
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
| Status: Abandoned
+
| 1962
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
| Well Type: Injection
+
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
| Configuration: Vertical
+
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
| Violations:
+
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
| Latitude: 51.3855995
+
| 1966
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
| Longitude: -114.1922695
+
| 1967
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1968
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1969
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1970
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1971
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1972
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1973
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1974
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1975
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1976
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1977
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1982
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2013-10-20
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2014-03-15
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 01:52, 30 January 2021

Well Details

Well ID: 0285021016000
Loading map...
Location: 00/16-10-028-02W5/0
Location Alias: 00/16-10-28-02 W5M
Location Alias 2: 00/16-10-028-02 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 02
Section: 10
County/Municipality: Rocky View County
Well Name: BONAVISTA CROSS 16-10-28-2
Operator Name: Bonavista Energy Corporation
License Number: 0019260
License Date: 1960-06-27
License Status: RecCertified
Spud Date: 1960-08-03
Final Drill Date: 1960-08-22
Well Total Depth: 2066.50 m
Surface Hole Latitude: 51.385596
Surface Hole Longitude: -114.192222

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-06-27 Obtained License
1960-08-22 Finished Drilling
1960-08-22 Well Mode changed to Drilled and Cased
1960-08-24 Production Casing Operation Performed
1960-08-25 Perforation Treatment Performed - Jet Perforation
1960-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-28 Perforation Treatment Performed - Fractured
1960-09-12 Well Began Production
1960-09-12 Well Fluid changed to Crude Oil
1960-09-12 Well Mode changed to Flowing
1961-11-24 Well Fluid changed to Crude Oil
1961-11-24 Well Mode changed to Pumping
1962-05-14 Perforation Treatment Performed - Condensate Squeeze
1965-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-05-11 Perforation Treatment Performed - Condensate Squeeze
1965-07-01 Well Began Injection
1965-07-01 Well Fluid changed to Water
1965-07-01 Well Type changed to Injection
1985-12-31 Well Fluid changed to Water
1985-12-31 Well Mode changed to Suspended
1985-12-31 Well Type changed to Injection
2013-10-24 Perforation Treatment Performed - Cement Plug
2013-10-24 Plug Back Performed
2013-10-24 Well Fluid changed to Water
2013-10-24 Well Log Performed
2013-10-24 Well Mode changed to Abandoned Zone
2013-10-24 Well Type changed to Injection
2014-02-02 Perforation Treatment Performed - Jet Perforation
2014-02-02 Well Log Performed
2014-02-03 Perforation Treatment Performed - Cement Squeeze
2014-02-03 Plug Back Performed
2014-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-04 Perforation Treatment Performed - Jet Perforation
2014-02-04 Plug Back Performed
2014-02-04 Well Log Performed
2014-02-05 Perforation Treatment Performed - Cement Squeeze
2014-02-05 Plug Back Performed
2014-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-06 Perforation Treatment Performed - Jet Perforation
2014-02-06 Plug Back Performed
2014-02-06 Well Log Performed
2014-02-08 Perforation Treatment Performed - Cement Squeeze
2014-02-08 Plug Back Performed
2014-03-15 Well Abandoned
2014-03-15 Well Fluid changed to Water
2014-03-15 Well Mode changed to Abandoned
2014-03-15 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-25 Perforation 2046.70 2051.00 13
2014-02-04 Perforation 724.00 725.00 20
2014-02-04 Packing Device Capped w/Cement 706.00 714.00 0
2014-02-04 Perforation 599.00 600.00 20
2014-02-05 Cement Squeeze 599.00 600.00 0
2014-02-06 Perforation 366.00 367.00 20
2014-02-06 Packing Device Capped w/Cement 588.00 596.00 0
2014-02-08 Cement Squeeze 366.00 367.00 0
1960-08-26 Acid Treatment 2046.70 2051.00 0
1960-08-28 Fracture 2046.70 2051.00 0
1962-05-14 Condensate Squeeze 2046.70 2051.00 0
1965-05-10 Acid Treatment 2046.70 2051.00 0
1965-05-11 Condensate Squeeze 2046.70 2051.00 0
2013-10-24 Cement Plug 2023.30 2032.30 0
2014-02-02 Perforation 1343.50 1344.50 17
2014-02-03 Cement Squeeze 1343.50 1344.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-20 No Incident Encountered 0.00 0.00
2014-03-15 No Incident Encountered 0.00 0.00

For data sources see[6]

References