If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 318: | Line 318: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0285023312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.440093,"lon":-114.233498,"icon":""}]} |
Location: 00/12-33-028-02W5/0 | |
Location Alias: 00/12-33-28-02 W5M | |
Location Alias 2: 00/12-33-028-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 5 | |
Range: 02 | |
Section: 33 | |
County/Municipality: Rocky View County | |
Well Name: ROYALITE CROSS IN 12-33-28-2 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0020063 | |
License Date: 1960-11-29 | |
License Status: RecCertified | |
Spud Date: 1960-12-01 | |
Final Drill Date: 1960-12-18 | |
Well Total Depth: 2089.40 m | |
Surface Hole Latitude: 51.440093 | |
Surface Hole Longitude: -114.233498 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1960-11-29 | Obtained License |
1960-12-18 | Finished Drilling |
1960-12-18 | Well Mode changed to Drilled and Cased |
1960-12-19 | Production Casing Operation Performed |
1960-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-12-21 | Perforation Treatment Performed - Fractured |
1960-12-21 | Perforation Treatment Performed - Jet Perforation |
1960-12-26 | Well Began Production |
1960-12-26 | Well Fluid changed to Crude Oil |
1960-12-26 | Well Mode changed to Flowing |
1961-10-22 | Well Fluid changed to Crude Oil |
1961-10-22 | Well Mode changed to Pumping |
1962-10-15 | Well Began Injection |
1962-10-15 | Well Fluid changed to Water |
1962-10-15 | Well Type changed to Injection |
1962-11-30 | Perforation Treatment Performed - Fractured |
1971-08-20 | Perforation Treatment Performed - Cement Plug |
1971-08-23 | Well Abandoned |
1971-08-23 | Well Fluid changed to Water |
1971-08-23 | Well Mode changed to Abandoned |
1971-08-23 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1960-12-21 | Perforation | 2069.30 | 2072.00 | 13 |
1960-12-21 | Acid Treatment | 2069.30 | 2072.00 | 0 |
1960-12-21 | Fracture | 2069.30 | 2072.00 | 0 |
1962-11-30 | Fracture | 2069.30 | 2072.00 | 0 |
1971-08-20 | Cement Plug | 2042.20 | 2086.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]